GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST Large Area Telescope:
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
EFW DFB Systems Assurance
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety Assurance Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Status Review – December 2, Mechanical Subsystem – QA Completed Tasks Grid assembly part inspection and acceptance status –TCS EEE parts 4 part types received and have gone through incoming inspection to date (4 total parts required) 3 part types approved for “flight use” –Qual testing of thermostats submitted to LAT PCB –Mechanical parts 57 mechanical parts are required for grid assembly activities –LAT QA has inspected and accepted 41 –Total number of mechanical parts has increased by 10 since last month Grid assembly activities –Heat pipe and thermal control hardware bonding procedures reviewed and released 4 out of 5 top flange heat pipes installed –Grid handling procedure for MGSE support table reviewed and released –Grid Assembly Work Order developed and approved –Grid MGSE support table and calorimeter lift fixture certified for use

GLAST LAT ProjectMonthly Status Review – December 2, Mechanical Subsystem – Issues Grid assembly issues –Grid NCR No. 147 has two remaining open issues from dimensional inspection Perform final measurement of Tracker bushing locations during alignment operation Verify spacecraft attach holes true positions on +X/-X sides are acceptable –Radiator mount brackets require modification to fix interference with MGSE –Rework of grid required to add purge way not designed into grid

GLAST LAT ProjectMonthly Status Review – December 2, Tracker Subsystem - QA Completed Tasks MCM Charge injection read-back errors at +60C –Traced to GTRC timing margins, which were found to be sensitive to clock duty factor Changing termination resistor (instead of 100 ohm to 75 ohm) on flex cables to resolve problem NCR’s No. 107, 114, 118 and 139 to be closed MCM workmanship issues –Dedicated Senior LAT Quality Engineer to aggressively work MCM workmanship issues with Teledyne and direct rework effort at SLAC Developed MCM specific inspection criteria and rework documentation –Deploying inspector from LAT QA staff to Teledyne as source inspector Flex cable quality issues –Assigned LAT Quality Engineer solely to flex cable activities Performing inspections on all fabricated flex cables Visited Parlex 4 times in last 5 weeks Maintaining flex cable corrective plan

GLAST LAT ProjectMonthly Status Review – December 2, Tracker Subsystem QA Activities Tracker issues being addressed –Flex cables Coupon failures –Coupon evaluation results received from GSFC on initial flex cable revealed internal annular rings missing and separations between barrel plating and internal layers »Process changes were initiated at Parlex (drill speed and feed modifications and circuit X-ray incorporated) »Post-process change flex cable coupons indicate corrective actions were not adequate Workmanship issues –Source inspection on 8 post-process change flex cables was performed at Parlex week of 10/25 –Several workmanship issues were identified »Excessive bubble in adhesive between Omnetic connectors, foreign material on cables, voids in epoxy, damaged connectors, etc. »Flex cable assembly activity stopped, corrective action requested from Parlex LAT Quality Engineering and Tracker Engineering maintaining on-site presence at Parlex –Daily meetings are being held with Parlex Working to develop second source for flex cables –Surveys are being schedule for viable candidates

GLAST LAT ProjectMonthly Status Review – December 2, Tracker Subsystem QA Activities MCMs Issues –Pitch adaptor trace cracking Electrical test implemented to detect cracked traces –MCM board shorts 8 MCMs have developed internal board shorts (3 more MCMs may be suspect) –Leakage current between layers 7 and 8 PWB GSFC performed DPA on MCMs submitted Additional MCM to be submitted to U of Maryland for evaluation Analysis and evaluations nearing completion –Final MRB planned for next week

GLAST LAT ProjectMonthly Status Review – December 2, Tracker Subsystem QA Issues MCM issues being addressed –Pitch adaptor debonding –Copious disconnected channels on MCMs Flex cable installation on towers –MRB held 1/4/05 on those towers that utilize cables with unacceptable coupon results

GLAST LAT ProjectMonthly Status Review – December 2, DAQ Part Activities EEE Part inspection and acceptance –DAQ EEE Parts are inspected as they are received No backlog exists Part acceptance status maintained –All required DPA samples have been submitted to GSFC Part Issues –“UMC line” FPGA’s received – DPA failure on one sample RTSX32SU-1CQ208B – 50 ea. (TEM) – DPA passed RTSX72SU-CQ208B – 75 ea. (TEM) – One bond lifted at 0.6 grams RTSX72SU-1CQ208B – 11 ea. (LCB) – DPA to be performed –cPCI connector qualification plan requires finalization Potential solderability problem due to less than desirable nickel plated surface on pins –Samples from each lot sent to GSFC for additional evaluation –PDU and SIB PWB coupons failed.002” internal annular ring requirement and showed laminate cracks and delaminations PWBs are being replaced –Austin Semi EEPROM PIND testing failure Lot date code 0302 – 21 of 66 parts failed Lot date code 0336 – 16 of 58 part failed

GLAST LAT ProjectMonthly Status Review – December 2, DAQ ASICs Inspection & Test Status GLTC3 – 645 each (GASU); GTCC1 – 881 each (TEM); GCCC1 – 824 each (TEM) –Screening and Qualification Plan, LAT-TD-02656, released and approved Visual inspection and serialization completed Thermal cycling completed –GTCC1 and GCCC1 have completed thermal cycling 4/2/04 –GLTC3 completed thermal cycling 10/11 Electrical testing and burn-in performed at SLAC in Building 33 (LAT I&T Facility) –Initial Electrical Test at 25C »GTCC1 – 384 of 405 accepted »GCCC1 – 192 of 221 accepted »GLTC3 – To be performed –Dynamic Burn in for 168 hrs. at 85C »GTCC1 – 384 of 384 accepted »GCCC1 – 192 of 192 accepted »GLTC3 – To be performed –Electrical Test post burn in at 25C »GTCC1 – 384 of 384 accepted »GCCC1 – 192 of 192 accepted »GLTC3 – To be performed DPA evaluation performed on all three ASICs and passed

GLAST LAT ProjectMonthly Status Review – December 2, TEM & TEM-PS Assembly QA Activities Production activities commenced week of 9/27 on Qual + 2 units –Several technical/quality issues have surfaced on TEM-PS assembly activities requiring evaluation and corrective action Thermally conductive adhesive.010 max. bond line requirement could not be met (closed) FPGA’s received at GTC with leads not meeting coplanarity requirements (closed) Dropped TEM boards by General Technology Incorrect lead configuration on MAX724 IC (TPS assembly) –NCRs related to quality issues have been addressed and approved

GLAST LAT ProjectMonthly Status Review – December 2, DAQ Harness QA Activities PDU internal harnesses –LAT-DS – 28 Pair Pigtail with Micro D – 8 total –LAT-DS – 38 Pair Pigtail with Micro D – 8 total –LAT-DS – 16 Pair Pigtail with Micro D – 12 total Perform quality survey at Glenair on November 19 th –Survey performed in conjunction with NASA QE »Identified quality system deficiencies required corrective action »LAT harness specific workmanship and inspection requirements must be implemented Technical Exchange Meetings have been going to review status of survey corrective actions and finalize assembly documentation –Production start anticipated for 1/10

GLAST LAT ProjectMonthly Status Review – December 2, DAQ Tasks to be Performed GASU and PDU Assembly –Responses of RFP have been received from potential assembly houses Quality Survey of selected vendor required Technical Exchange Meeting will be set-up Source inspection plan being developed Dimensional inspection of metal fab items received last week required to support PDU, GASU, and EPU/SIU assembly activities

GLAST LAT ProjectMonthly Status Review – December 2, LAT I&T QA Activities I&T Cleanroom Facilities –Weekly surveillance of I&T facility is performed by LAT QA to verify compliance to cleanroom facility requirements Performed with participation of I&T personnel 3 observations are open –ESD controls reviewed and ionizers procured and installed –Nonvolatile residue (NVR) sampling results (quarterly) No measurable NVR accumulation on witness plates –Particle fallout sampling results (quarterly) No excessive heavy particulate accumulation observed Working in concert with I&T personnel on the review of I&T procedures and documentation and integration process development I&T replaced MGSE that did not meet requirements