SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays The GLAT GUI monitoring.

Slides:



Advertisements
Similar presentations
EIDE System Requirements and Specification Documents
Advertisements

Components of GIS.
Addressing IPv6 Vulnerabilities on Small Business Networks Bradley HainesVincent Pullano University of Cincinnati College of Education, Criminal Justice,
1 OBJECTIVES To generate a web-based system enables to assemble model configurations. to submit these configurations on different.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
MCT260-Operating Systems I Operating Systems I Introduction to Operating Systems.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
GLAST LAT Project CCB Review – May 17 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review May 17 st, 2005 E-Logbook.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT ProjectAll Hands Meeting – May 11, 2005 R. Claus 1 GLAST Large Area Telescope: LAT All Hands Meeting I&T/Online May 11, 2005 Ric Claus I&T/Online.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
Past/present ALAS. CAD Node Maps Crash Locations text Text - node ID, x, y MapBasic interpolation program MapInfo Crash Locations CAD node file MGE (unit.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Presents. VAT AMOUNT IN INVOICE This module has been developed to Display VAT Amount In Invoice
What are the functions of an operating system? The operating system is the core software component of your computer. It performs many functions and is,
INTRUSION DETECTION SYSTEMS Tristan Walters Rayce West.
TIBCO Designer TIBCO BusinessWorks is a scalable, extensible, and easy to use integration platform that allows you to develop, deploy, and run integration.
Scott Pinkerton Sample GUI/Application Portfolio 1.
Linux Operations and Administration
Guide to MCSE , Second Edition, Enhanced 1 Objectives Understand and use the Control Panel applets Describe the versatility of the Microsoft Management.
1 © 2005 Cisco Systems, Inc. All rights reserved. Cisco Unity Connection 1.x Documentation What you need to know.
SunGuide SM Software Development Project Ramp Meter Firmware Discussions August 8, 2006.
SLAC March 1 st 2006 GLAST LAT Software F.Longo GLAST LAT GLAST LAT SW Overview of Cookbook Examples Francesco Longo University and INFN, Trieste, Italy.
Information Systems: Databases Define the role of general information systems Describe the elements of a database management system (DBMS) Describe the.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
IRMIS 2 Overview Andrew Johnson Computer Scientist, AES Controls.
Copyright 2014 Open Networking User Group. All Rights Reserved Confidential Not For Distribution Six Steps To A Common Open Networking Ecosystem Common.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
NetNumen T31 Common Operations. Objectives Master Basic Configurations of T31 Master Common Operations of T31.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
7 February 2008Dietrich Beck A LabVIEW Interface to ELOG ELOG Possible solution paths Status Integration into – CS ? – Domain Management System?
BABCA Software Operating Systems (OS) aka Systems Software A set of instructions that coordinate all the activities among computer hardware resources.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Credit:  An operating system is the program that is loaded into the computer  coordinates all the activities among.
Chapter 2 – Part 1 Introduction To Windows Operating Systems CMPF 112 : COMPUTING SKILLS.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
Company LOGO Network Architecture By Dr. Shadi Masadeh 1.
Hardware/Software Basics Test Get out your DIY Test Review.
1 Pertemuan 3 Operating Cisco IOS Software. Discussion Topics The purpose of Cisco IOS software Router user interface Router user interface modes Cisco.
© 2002, Cisco Systems, Inc. All rights reserved..
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
Monitoring GLAST Operations: Building tracking displays for the LAT Instrument Science Operations Center By Christina Ketchum.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
Test Executive Trades (1)
Chapter 1 Introduction.
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
GLAST LAT System Engineering
Functions of an operating system
GLAST Large Area Telescope:
Alice terms Chapter 3.
05 | Desktop Applications
Integration and Test Organization Chart
Modified at -
Presentation transcript:

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays The GLAT GUI monitoring tools need to take into account the information flow between the User and the Hardware (any GLAT setup under test) in two distinctive ways:  Schema: Describes the Hardware that the user is going to test  Configuration: Sets up the Hardware to a known state Depending on its functionality a GLAT GUI will Modify and/or Monitor a known state of the Hardware, serving as the primary Command/Control tool GLAT GUI interface Schema HWConfig.

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays

SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays