Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

ARNAB BANERJEE Sanjoy pal 6/13/2014MTD Workshop, Beijing, April,
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 Beam Test Results of USTC LMRPC modules (50cm) Yongjie Sun presnted by Hongfang Chen.
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
How to Make a Hot Air Balloon
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
STAR MRPC TOF: Project Overview BNL January 26, 2006 Geary Eppley Rice University.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
MRPC R&D and production Yongjie Sun Center of Particle Physics and Technology, USTC.
New MRPC prototypes developed in Tsinghua Unversity Huangshan Chen (Tsinghua Unversity)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 Cross section of a double-stack MRPC. 2 Clean room for MRPC strip production.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
STAR regional meeting, October UniversityWang Yi, Tsinghua University New MRPC R&D in Tsinghua University Outline: Introduction of MRPC.
M. Bianco On behalf of the ATLAS Collaboration
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Report on beam test results of high-rate MRPCs Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
长读出条 MRPC 性能研究 孙勇杰 Key Laboratory of Technology of Particle Detection and Electronics, USTC-IHEP, CAS Center of Particle Physics and Technology, USTC.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
STAR-MTD March 30 th -April 1 th, 2011 Wang Yi, Tsinghua University 1 Final design and plan for LMRPC production Outline: LMRPC structure.
1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Glass Box Creation and Use. Glass Box for Drawing  Glass box to guide creation of multi-view drawings.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
eTOF MRPC Production Status at Tsinghua University
European DHCAL Meeting 13/06/08
Quality Control Chamber Production
How to assemble LED bulb kit supplied by
Status of straw production straw module assembling
Conceptual design of TOF and beam test results
STAR TOF MRPC Mass Production & Q.C. (USTC)
MRPC -High Time Resolution Detector R&D at USTC CHINA Chen, Hongfang 2001/Oct. Oct.2001, Beijing MRPC,USTC.
High time resolution TOF for SoLID
Limited Streamer Tube Project Summary
BESIII端盖TOF升级 MRPC性能测试
Liceo Scientifico “A. Volta”
Presentation transcript:

Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China

Mar. 31, 2011STAR MTD workshop, USTC 2 Outline Material Module assembly procedure Performance test Time schedule Summary and outlook  QC. & QA.

Mar. 31, 2011STAR MTD workshop, USTC 3 1. Material list Use the same material at different sites is preferred. Otherwise, the equivalent must be proved. MateriallengthwidththicknessNotes Inner glass 874 ± ±0.20.7±0.025 pieces Outer glass890±0.2559±0.21.1±0.022 pieces Graphite liquid electrode ~ 4 MΩ/ □ Mylar ±0.012 pieces PCB915±0.2580± ± pieces, 12 strips, thick. honeycomb890±1559±110±0.32 pieces Double-side tape pieces, for the honeycomb Fishing line0.25± gaps Support block 30 ± ± ±0.058 pieces HV wireBy USA signal cableBy USA Unit: mm

Mar. 31, 2011STAR MTD workshop, USTC 4 Quality control on the material Glass Measure the dimensions (spot check of 20%) Check the surface quality Pcb Dimensions, the scratch on the strips Honeycomb Dimensions, surface quality Mylar foil: thickness Fishing line Dimension check of each coil Support block: thickness Material with faults will be returned back to factory.

Mar. 31, 2011STAR MTD workshop, USTC 5 2. Assembly procedure Material cleaning Glass washing: by hot steam and alcohol Honeycomb, mylar, pcb, support block … Electrode painting Protect the edge of glass with tape (4 mm) Applying the graphite painting Drying for 24 hours Measure the surface resistivity Preparations

Mar. 31, 2011STAR MTD workshop, USTC 6 Assembly procedure adhere the honeycomb to pcb with double-side tape. put the screws into the bottom pcb for supporting fishing line.

Mar. 31, 2011STAR MTD workshop, USTC 7 Assembly procedure Put the mylar on the surface of pcb. Put the outer glass (with electrode painting facing outside) on the mylar. The HV connection was made by adhesive graphite tape at two corners where Mylar has been cut out.

Mar. 31, 2011STAR MTD workshop, USTC 8 Assembly procedure Run the fishing line between the screws and put the inner glass on top of it. ……

Mar. 31, 2011STAR MTD workshop, USTC 9 Assembly procedure Put the top pcb (with honeycomb, mylar and another outer glass) on. Put iron bricks on top of the structure and press for more than 12 hours. Fix the structure with pins along the edges. Install the support blocks between the pcbs. Solder the HV wire and signal “ pigtail ” cable. Protect the HV solder point with CAF4 silicon.

Mar. 31, 2011STAR MTD workshop, USTC 10 QA. & QC. during assembly Check the cleanness of material during the assembly. Blow off the dust with pure N 2 if needed. Measure the thickness between pcbs at 16 points along the edges. The uniformity should be less than 0.3 mm. Check the connection of HV and signal cable.

Mar. 31, 2011STAR MTD workshop, USTC Performance test Install the module into the gas box and flow the working gas for more than 48 hours. Training with HV for 48 hours. Test the leak current and noise rate. Take the cosmic ray data at 2 different positions for efficiency and time resolution test (24h for each position). Need all the modules take the cosmic ray test?  20%: efficiency and time resolution  Others: leak current and noise rate

Mar. 31, 2011STAR MTD workshop, USTC 12 Performance standard Noise rate: <400 Hz/strip Leak current: < 40 nA Efficiency: > 90% Time resolution: < 120 ps (for 90% channels)

Mar. 31, 2011STAR MTD workshop, USTC 13 Documents for QA. & QC. Recording Tables for QA check and test results Manufacture card QA check Cards A web-based database will be available similar to that of STAR TOF.

Mar. 31, 2011STAR MTD workshop, USTC Time schedule –  finalizing the design –  20% –  40% –  40%

Mar. 31, 2011STAR MTD workshop, USTC 15 QA. & QC. will be strictly performed during the construction. Hope continue the success of STAR TOF. Trouble: lack of FEE board. 5. Summary Thank You !

Mar. 31, 2011STAR MTD workshop, USTC 16