GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.

Slides:



Advertisements
Similar presentations
Operations Testing in the ISOC Service Challenges are a successor and extension to the successful Data Challenge model Broader set of objectives Continue.
Advertisements

GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.
GLAST LAT ProjectISOC Peer Review March 2, 2004 Document: LAT-PR Section 5 LAT Operations Facility 1 GLAST Large Area Telescope: Section 5: LAT.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project ISOC 5/17/2004 – Bill Craig1 ISOC Risk Analysis Process –Discussion with I&T personnel on risks –Internal discussion performed in concert.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-ISOC Subsystem1 RFA 1 – Management Plan, Documentation, Schedule  Specific Request – Part 1.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST Science Support CenterAugust 9, 2004 GLAST Users’ Committee Meeting—1 J.P. Norris GLAST Science Support Center Status.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.2 Visualization Tools 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
I&T&C Organization Chart
GLAST Large Area Telescope:
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
GLAST Large Area Telescope
Introduction and Overview
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail Design Review (CDR) David Lung LAT ISOC Subsystem Manager

GLAST LAT Project Engineering Meeting – ISOC Peer Review 2 ISOC Peer Review  Why in mid-February 2004 Since the PDR, the ISOC has not been reviewed in detail We have tentatively scheduled the following reviews: Detailed Design Review on May 26, 2004 Mission Ground System Review on June 23, 2004 Solidify the roles and responsibility for Science Operations Group (the “S” in ISOC)  Charge for the Review Review the design, requirements, and interfaces Design approach Requirements, plans, and ICDs Interfaces between SLAC and other institutions (GSFC)

GLAST LAT Project Engineering Meeting – ISOC Peer Review 3 Review Committee  A combined DOE/GSFC review –Peer Review Committee Chair (2) – In work –GSFC Team (2) – GSFC program office to identify –SLAC Team (2) – LAT project office to identify –GBM Team (1) – Bill Paciesas –Spectrum Astro Team (1) – Spectrum Astro project office to identify –Science Team (2) – Peter to recommend –Total for Peer Review: 10

GLAST LAT Project Engineering Meeting – ISOC Peer Review 4 Area Covered in Peer Review  Operation Aspect Application Software Commanding, telemetry, and operations tools Databases Command, telemetry, and calibration Operations Procedures Ops Products ICD Ground Hardware Test Bed, I&T support, equipment, and web interface Facility Tests and Simulations GRT, End-to-End, and Mission Sims  Science Aspect Results of Data Challenge 1 Data Pipeline