M. White – June 28, 2004 LCLS Requirements Meeting In a project, we live or die by the schedule. After we’re “baselined” it is our plan for what we will.

Slides:



Advertisements
Similar presentations
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Advertisements

IAPD – The Maryland Experience. Involve FNS from the start – Guidance – Knowledge – Updates Communicate Often Approvals.
Need to Invest Investment Objectives and Case for Change Determine Potential Value for Money Strategic Case: Economic Case: Financial Case: Affordability.
Configuration Management Benchmarking Group Seattle, June 2014 Configuration Backlog Reduction – There and Back Again Susan Atkin, Wolf Creek N.O.C.
Chapter 3 Project Initiation
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
LCLS Undulator Alignment and Motion Review 1 LCLS schematic view LCLS Undulator Alignment and Motion Review.
Marion White Magnets & Supports April 16, 2007 Undulator Magnets and Supports Status.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Stephen Milton Undulator System 14 November, 2004 Undulator System Overview Stephen Milton.
Undulator System Review Closeout Erik Johnson, Kem Robinson, Dieter Walz 4 March 2004.
Marion M. White Undulator Prototype Status and 12 October 2004 LCLSLCLSLCLSLCLS Undulator Prototype Status and Measurement.
Systems Engineering Management
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Release & Deployment ITIL Version 3
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
to Effective Conflict Resolution
How to Get Promoted When Your IT Project Fails Let’s Talk About…….. Ian Koenig PMP Quality IS Projects, Inc.
How To Be A Good Client …and not your project’s worst enemy.
COMP 208/214/215/216 Lecture 3 Planning. Planning is the key to a successful project It is doubly important when multiple people are involved Plans are.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
CS 111 – Dec. 3 Lab recap Problem solving approach for systems analysts –8 phases –Just understand the flow/process/sequence of the steps, not specifically.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
Surf & Turf Collaborative Marianne Perie Center for Educational Testing and Evaluation University of Kansas A presentation at the National Conference on.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Situation David Chang is the owner of a small electronics company. In six months, a proposal is due for an electronic timing system for the 2016 Olympic.
By : Hisham Kahlifa Shreef Foda Khaled monir Tamer medhat Supervisor : Dr Doaa Nabil.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
EMIS Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for.
Green Line Extension Project
On behalf of the Accelerator Project Phase II Team
Industrialization of previous projects
Linac Coherent Light Source Procurement
EST102: 12th Feb to 9th Mar 2018: Negotiation of contract Ts&Cs
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Production Management
Undulator Long-Lead Procurement Preparation
Undulator and Magnet Production Status 25 October 2006
EST102: 30th Mar 2018: Complete negotiation of contract Ts&Cs
Presentation transcript:

M. White – June 28, 2004 LCLS Requirements Meeting In a project, we live or die by the schedule. After we’re “baselined” it is our plan for what we will accomplish and when, and it is the government’s plan for funding us. If we’re late, the cost goes up. We pay more for people to work longer than planned, plus the value of the money gets escalated. Being late means maybe having to give up or postpone some things. DOE probably can’t find more money. They have a schedule too. Too late and the project may be cancelled.

M. White – June 28, 2004 LCLS Requirements Meeting To Succeed: Plan Well. Stick to the Plan. The requirements must be clearly defined. The responsibilities and interfaces must be clearly defined. Use talented and experienced designers. Use experienced reviewers. There’s no glory in reinventing the wheel, so use what we can from other people and projects. There are enough challenges as it is without solving old problems over again. Do not make cosmetic changes late in the game.

M. White – June 28, 2004 LCLS Requirements Meeting The Exception The exception is if we are building something that we know won’t work. It’s better to be a little late on something that works than on time with something that doesn’t.

M. White – June 28, 2004 LCLS Requirements Meeting We’re here to make sure we all know and agree on what we’re doing…. The prototype was constructed and tested, and many of the drawings are close to final. At this stage, changes will cost time and money, proportional to the degree of the modifications. If the requirements have changed significantly since we began, or if they were misunderstood and the present system won’t work, changes must be made. If there is a disagreement based on personal preference and both methods will work, consider whether it is important enough to potentially result in loss of something else down the road.

M. White – June 28, 2004 LCLS Requirements Meeting Else we go in circles

M. White – June 28, 2004 LCLS Requirements Meeting Acquisition Strategy The undulators were designed and prototyped by APS, based on the combined experience of many people over many years. This decreased the technical and schedule risk to LCLS. Our design and assembly procedures will be furnished to the assembly vendors; any changes by the vendors will require our approval. As a direct result of the US funding system, we will procure some critical long-lead parts early and furnish them to the assembly vendors.

M. White – June 28, 2004 LCLS Requirements Meeting Long Lead Procurements Long lead procurements are those undulator components that are expected to have long delivery times. Orders are to be placed as soon as there is money next FY in order to maintain the schedule. We assume that there will be money by November 1st Large and/or complex procurements take months to prepare, and require significant effort from procurement and project staff. High-value procurements need DOE signoff.

M. White – June 28, 2004 LCLS Requirements Meeting Schedule from 50,000 feet UN30_28430 Undulator System Requirements Frozen 03/31/04 (not?) UN30_28420 Strongback Motion Spec 04/01/04 (not?) UN30_FINIM Finish Undulator Magnet Systems 07/24/07 UN30_28440 All Undulator Magnets Ready for Installation 08/06/07

M. White – June 28, 2004 LCLS Requirements Meeting Long Lead Procurement Issues Affecting Titanium Strongbacks: Change in gap size and which direction the gap faces Change in # of survey monuments and methodology Change in support and alignment philosophy Are PZTs needed? Relationship between quads, BPM, and undulator needs to be settled for BBA. Magnet Blocks No pending changes are known. Magnet Poles Internal review was held – change to wingless pole design, canted spacers is being implemented.

M. White – June 28, 2004 LCLS Requirements Meeting Titanium Strongbacks UN33_00270 Internal Design Review - Undulator Systems 04/29/04  UN33_00280 Incorporate Comments from Internal Des Rev. 04/30/04 05/13/04 UN33_10002 Prepare for Final Design Review 05/14/04 06/11/04 UN33_10010 Prep Bid Package - Ti Strongback 05/14/04 07/14/04 UN33_10004 Final Design Review - Und Sys and Ti Strongback 06/14/04 MSC_UN005 CRIT: Contract - Ti Strongback 06/15/04 – error in P3. UN33_10006 Incorporate Comments from Final Des Rev. 06/15/04 07/13/04 UN33_10020 Release RFP - Ti Strongback 07/15/04 UN33_10030 Vendor Prep Proposal - Ti Strongback 07/16/04 08/13/04 UN33_10040 RCV: Proposal - Ti Strongback 08/13/04 UN33_10050 Evaluate Proposal - Ti Strongback 08/16/04 08/20/04 UN33_10060 AWARD: Contract - Ti Strongback 11/01/04

M. White – June 28, 2004 LCLS Requirements Meeting Magnet Blocks MSC_UN010 CRIT: Start Procurement of Magnet Blocks 07/06/04 UN33_20010 Prep Bid Package - Magnet Blocks 07/06/04 07/26/04 UN33_20020 Release RFP - Magnet Blocks 10/04/04 UN33_20030 Vendor Prep Proposal - Magnet Blocks 10/05/04 11/01/04 UN33_20040 RCV: Proposal - Magnet Blocks 11/01/04 UN33_20050 Evaluate Proposal - Magnet Blocks 11/02/04 11/08/04 UN33_20060 AWARD: Contract - Magnet Blocks 11/09/04 UN33_20070 Vendor Fab/Assy - 1st Half Magnet Blocks 11/10/04 03/03/05 UN33_20080 RCV: From Vendor - 1st Half Magnet Blocks 03/04/05 UN33_20090 Vendor Fab/Assy - 2nd Half Magnet Blocks 03/07/05 06/20/05 UN33_ % magnet blocks delivered 06/21/05 UN33_20100 RCV: From Vendor - 2nd Half Magnet Blocks 13/20 06/21/05

M. White – June 28, 2004 LCLS Requirements Meeting Magnet Poles MSC_UN015 CRIT: Start Procurement of Magnet Poles 06/14/04 UN33_30010 Prep Bid Package - Magnet Poles 06/14/04 07/02/04 UN33_30020 Release RFP - Magnet Poles 10/04/04 UN33_30030 Vendor Prep Proposal - Magnet Poles 10/05/04 11/01/04 UN33_30040 RCV: Proposal - Magnet Poles 11/01/04 UN33_30050 Evaluate Proposal - Magnet Poles 11/02/04 11/08/04 UN33_30060 AWARD: Contract - Magnet Poles 11/09/04 UN33_30070 Vendor Fab/Assy - 1st Lot Magnet Poles (1-10) 11/10/04 02/16/05 UN33_30080 RCV: From Vendor - 1st Lot Magnet Poles (1-10) 02/17/05 UN33_30082 Vendor Fab/Assy - 2nd Lot Magnet Poles (11-20) 02/17/05 05/19/05 UN33_30086 RCV: From Vendor - 2nd Lot Magnet Poles (11-20) 05/20/05 UN33_30087 Vendor Fab/Assy - 3rd Lot Magnet Poles (21-30) 05/20/05 08/22/05 UN33_ % magnet poles received 05/20/05 UN33_30088 RCV: From Vendor - 3rd Lot Magnet Poles (21-30) 08/23/05 UN33_30090 Vendor Fab/Assy - 4th Lot Magnet Poles (31-33) 08/23/05 11/22/05 UN33_30100 RCV: From Vendor - 4th Lot Magnet Poles (31-33) 11/23/05

M. White – June 28, 2004 LCLS Requirements Meeting And then… After the long lead items are awarded, there is a lag time, during which the vendors procure their materials, make the objects, and secondary vendors are machining parts. Then it’s time to award the undulator assembly work. The schedule is very tight on that, and we really cannot afford to delay without putting the schedule at risk.

M. White – June 28, 2004 LCLS Requirements Meeting Decisions In these 2 days, we need to make decisions about the critical issues so we can proceed. We can leave room for options, but it must be clear to us what options are likely. Flexibility is expensive. In a Project, Every Day Counts!

M. White – June 28, 2004 LCLS Requirements Meeting Magnets are Cool Magnets are Fun They Make Good Toys For Everyone