August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Radiation Safety Training Lab Survey Program Washington State University Radiation Safety Office.
ONLINE INTEGRATION OF RADIATION SAFETY WORK CONTROL FORMS 2011 Accelerator Reliability Workshop iThemba LABS, Cape Town, S. Africa Jonathan Warren April.
Jim Turner LCLS Accelerator Readiness Review December 2, LCLS Safety Systems Acceptance J. Turner, for the LCLS and SLAC.
Industrial Radiography
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
Establishment of a Training Dosimetry Laboratory in Cairo University Dr. Hassan Fathy for NSPA.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Mike Saleski 1 Safety Systems Configuration Control FAC 2009 Safety Systems Configuration Management E. Michael Saleski Control.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
E. M. Saleski FAC 11/11/08 Configuration Control of PPS FAC Review November 2008 E. Michael Saleski Controls Dept Safety.
Safety Oversight for SLAC Accelerator Department Operations
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Radiation Safety Section Goals and Measure For 2005.
Gauges and well logging
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Environmental Health and Safety Radiation Control and Radiological Services.
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
Radioactive Materials Awareness Radiation Safety Training.
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Beamline Radiation Shielding Beamline Design Review 17 April, 2006.
Continuous Quality Improvement CQI One Way to Grow and Sustain Change.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
NLCTA Safety Audit Radiation Safety Review W. R. Nelson 9 November 2001.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Radiation Protection Technology Contamination Control Radiological Safety and Response RPT-243-PE-5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
Accelerator Safety Workshop SLAC John Blaikie Health Physics Program Manager – SC Office of Science, U.S. Department of Energy Access Control and.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1 ES&H Dept Head Meeting, July 9, 2003 S. Rokni “Synching up with VIWG” “Each Department Head will present the programs under their purview, regulations.
OHIO RADIOGRAPHY EVENTS Michael Snee, Chief Bureau of Radiation Protection 1.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Contamination Control Radiological Safety and Response RPT-243-PE-5.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Safety Configuration Management Process at JLab
Shielding Design for LCLS Injector Operation – Phase one
Operators and Radiation Safety at the Advanced Light Source
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Location Plans & Site Plans
Non-Radiation Worker Training
ESS Handbook on Radiation Protection Chapter 6 – Dosimetry
PSS verification and validation
Radiation Protection Handbook
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
SLAC Radiation Safety Work Control Form Process:
Safety Program for LCLS Experiments
Access Control for CERN Experimental Areas
Presentation transcript:

August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire

August 4, 2009Radiation Safety Committee Outline: Responsible Personnel Operational Radiation Safety Program Directives Configuration Control BLA Area Classification AMO Commissioning Plan

August 4, 2009Radiation Safety Committee Responsible Personnel XFDSO NEH Area Manager Instrument Scientists Floor Coordinators RP

August 4, 2009Radiation Safety Committee Operational Radiation Safety Program Directives Pre-Beam Requirements: BLA Area Classification/Posting Passive Dosimetry Safety Item Labeling Preparation of Survey Procedures Beamline Posting Listing Authorized Staff X-ray Phase Safety Checklist for Commissioning

August 4, 2009Radiation Safety Committee Pre-User Requirements: First-Light Survey Comprehensive Survey Operational Radiation Safety Program Directives

August 4, 2009Radiation Safety Committee Pre-Experiment Requirements: List of Authorized Users Online/Offline Checklist –Includes Safety Inspection Checklist Operational Radiation Safety Program Directives

August 4, 2009Radiation Safety Committee Ongoing Requirements: PPS Interlock Checks BSOIC Calibration Checks Periodic Radiation Surveys Configuration Control Review of Experiment Proposals Training New Staff & Users Checking for Open RSWCFs Checking for BLA Modifications Operational Radiation Safety Program Directives

August 4, 2009Radiation Safety Committee The Configuration Control Program Responsible Parties in the Field: –NEH Area Manager –Primary Instrument Scientist –Floor Coordinators Elements of the Program –Labeling (Safety Items, Stands) –Securing of Safety Items (need tools to remove) –BLA (two checklists) –Safety Inspection Checklist (before each exp.)

August 4, 2009Radiation Safety Committee The Configuration Control Program –RSWCF Boundary = Wall 2 (except BSOIC) RP, XFDSO, Area Manager, Prim. Instr. Sci. Notice Posted at beamline ASD/XFD Handshake »Shared components »HPS work

August 4, 2009Radiation Safety Committee The BLA

August 4, 2009Radiation Safety Committee BLA

August 4, 2009Radiation Safety Committee

August 4, 2009Radiation Safety Committee

August 4, 2009Radiation Safety Committee

August 4, 2009Radiation Safety Committee

August 4, 2009Radiation Safety Committee

August 4, 2009Radiation Safety Committee

August 4, 2009Radiation Safety Committee Area Classification Controlled Area –Experimental Floor (= sub-basement) –GERT required for access –No personnel dosimeter required

August 4, 2009Radiation Safety Committee Area Classification: Posting Locations in Sub-Basement

August 4, 2009Radiation Safety Committee AMO Commissioning Plan Area Dosimetry –Hutch walls –Offices, etc. in sub-basement & basement Radiation Survey Plan –With source and with beam –Improved postings –Thin window GM (inside & outside hutch) –Survey hutch walls & roof –Special attention to doors and penetrations

August 4, 2009Radiation Safety Committee Thank You