Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.

Slides:



Advertisements
Similar presentations
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
Progress and Plan for Superconducting RF Cavity RF Group.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Russ Rucinski, FNAL, Oct. 8, MICE Cryostat Status 1.Prototype cryostat A. Status & Plans B. Parts C. Operating data (supplemental) 2.Four final cryostats.
Russ Rucinski, Fermilab, March 29, Commissioning is underway! –2 Cassettes installed on 3/18. –Sensors and control heater mounted. –Multi-layer.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Cryo Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
MICE Phase 1 Koji Yoshimura KEK June
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Thermal Control System. The Three Mechanisms of Heat Transfer Conduction - The transfer of heat through a solid –Interface Heat Exchangers –Cold plates.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Cavity support scheme options Thomas Jones 25/06/15 1.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
S A Griffiths CM42 June 2015 Electrical & Control.
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Project Manager’s Report + DC/MoM Report
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Far Detector Activities Late 2017 – Early 2018
Teleconference ACS – FREIA 20th February 2018
ILC Main Linac Superconducting Splittable Quadrupole
Presentation transcript:

Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006

Russ Rucinski, FNAL Jun 7, 2006 VLPC cryocooler cryostat - status Prototype cryostat is at Fermilab, in the D-Zero assembly building. Commissioned in Spring 2005.

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Prototype worked well. Stable temperatures for weeks Many thermal cycles, no problems Heat loads acceptable 55 W & 4 W Cryocooler at 60% 60 Hz, horizontal Cryocooler at 75% 50 Hz, horizontal

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Areas for improvement Thermal connection not reliably duplicated. Used indium wire smashed at interface. Thermal asymmetry: T slot1 =7.5 K, T slot2 =7.1 K Lid condensation risk Cassette envelope could collapse if evacuated with insulating vacuum let up.

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Thermal connection improvement – bolted studs through the envelope is being investigated. – Test this summer.

Russ Rucinski, FNAL VLPC cryocooler cryostat - status If it works on prototype cryostat (using two spare envelopes), then new production cryostats can be retrofitted. Practice solder choices & techniquesFinal choice & technique – leak tight

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Lid condensation risk. A moisture sensor of some type will be added to the alarm box. Cassette envelope could collapse if evacuated with insulating vacuum let up. An interlock on the cassette space vacuum pump has been suggested. Could also possibly solve with a mechanical check valve. Something will be done. Also want to try a simple improvement – add an invar washer in the bolted thermal connection to the cryocooler sink. Original design loosens when it cools down. An invar washer will make the connection tighter when it cools down since the bolt contracts more than the washer.

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Four additional cryocooler cryostats are being fabricated by Ability Engineering Technology, South Holland, IL, USA. Design of the four are based on the as-built prototype commissioned last spring. As I mentioned the improvements can be applied retro-actively. Expect delivery of parts – End of June ? I still need to order backplane and many other non- fabrication type parts still. Assemble and commission this fall. By Sept ?

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Fabrication at Ability Engineering Technology, Inc...

Russ Rucinski, FNAL VLPC cryocooler cryostat - status Fabrication at Ability Engineering Tech....