ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.

Slides:



Advertisements
Similar presentations
SAAB SPACE 1 The M2 ASIC A mixed analogue/digital ASIC for acquisition and control in data handling systems Olle Martinsson AMICSA, October 2-3, 2006.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.
MDT-ASD PRR C. Posch30-Aug-02 1 Specifications, Design and Performance   Specifications Functional Analog   Architecture Analog channel Programmable.
ATLAS MDT Electronics Mezzanine PCB Radiation Hardness Assurance Eric Hazen – Boston University.
E. Hazen - LECC Amsterdam1 Production Testing of ATLAS MDT Front-End Electronics G. Brandenburg, J. Oliver, M. Nudell, Harvard University,
CERN 30 Aug 2002ATLAS MDT-ASD PRR -- E. Hazen1 ATLAS MDT-ASD Integrated Circuit Production And Testing Plan E. Hazen – Boston University.
US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 1 MDT Electronics.
R. Ball September 27 th  Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
MDT-ASD PRR 28 Aug ’02 J.Oliver Quality Assurance, Production Testing, Database Chip certification, required tests Expected yield QA – Test plan  Production.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
CaRIBOu Hardware Design and Status
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
C. Beigbeder Final design Review ECAL/HCAL Frond End  FE board : current prototype  Test results Qualification Clock adjustment Noise analysis  FE board.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
A.A. Grillo SCIPP-UCSC ATLAS 3-May Evaluation of SiGe Technology – Status Report US-ATLAS Upgrade Meeting Evaluation of SiGe Technology - Status.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
ASIC Activities for the PANDA GSI Peter Wieczorek.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Motivation for 65nm CMOS technology
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Test structures for the evaluation of TowerJazz 180 nm CMOS Imaging Sensor technology  ALICE ITS microelectronics team - CERN.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
LPNHE - Serial links for Control in 65nm CMOS technology - 65nm CMOS - Higher density, less material, less power - Enhanced radiation hardness regular.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
E. Hazen - CMS Electronics Week
Development of T3Maps adapter boards
Setup for automated measurements (parametrization) of ASD2 chip
Calorimeter Mu2e Development electronics Front-end Review
CPU1 Block Specifications
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Upgrade of the ATLAS MDT Front-End Electronics
TPC Large Prototype Toward 7 Micromegas modules
SALTRO16 activities in Lund
Verify chip performance
ASD-TDC joint test with MDT-CSM
Presentation transcript:

ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts placed 10/1 – Automatic tester designed and prototyped ● Mezzanine PCB Design and Production (w/ Harvard) – Rad-Hard test campaign for all components underway – Test / Burn-in station design underway ● Other Responsibilities: – CSM Adapter, Hedgehog testing, Test beam support

MDT ASD Chip ● Full custom CMOS layout in Agilent (HP) 0.5um – Designed by: Hazen and Posch (BU) and Oliver (Harvard)  Full custom design (standard cells in serial data interface)  I/O pads ESD protected  Die 3.2 × 3.7 mm, 70 bonding pads  QFP80 package  Fabrication process: 0.5  m CMOS, triple- metal, 1 poly, N-well, Analog option with linear capacitor, silicide block for poly resistors (HP AMOS14TB)

Mezzanine PCB ● 24 channel board ● All components must be rad-certified – Test program underway at BU ● Several hundred produced so far ● Volume production to start in early '03 Input Protection 3 ASD Chips AMT-3 TDC Power, I/O Connector Voltage Regulators

Mezzanine Board Burn-In ● Burn-in Facility needed for 300 cards ● Elevated / Cycling temperature to reduce infant mortality ● Design underway at BU: set-up may be duplicated at CERN for non-US chambers

Signal Hedgehog PCBs Shielded Design (Production Candidate - Rome) Unshielded Design (by BU) Shielding Improves Immunity to Pick-up noise MDT Resolution essentially unaffected by Shielding (tests at CERN) Production Prototypes Under test in Computer- controlled test facility (at BU)

Other Test Hardware

Radiation Testing DAQ Boards

Radiation Test Results ASD Parameters Essentially Unchanged up to 300 kRad SEE Results okay (many more detailed results not shown...) Voltage Regulator LP3964 (Nat'l Semi) OK to 60 kRad Neutron Results okay (Neutron, SEE results not shown...)

FY03 Plans ● Finish commissioning of ASD tester and test ~70k production chips (BU/Harvard) ● Design and build Mezzanine board burn-in setup for 300 boards (BU/Harvard) ● Oversee Initial production and testing of final Mezzanine boards (BU/Harvard) ● Complete the radiation hardness assurance testing of all mezzanine board components (BU) ● Participate as required in the completion of the on-chamber system, including power, cabling and EMC (electromagnetic compatibility) ● Participate as required in test-beam efforts at CERN