1 National Weather Service VTEC Status & Plan for Action National Partners Workshop June 24, 2004 Jason Tuell Office of Science and Technology.

Slides:



Advertisements
Similar presentations
Northwest Geographic Area Coordination Center Predictive Services Late Summer and Autumn 2013 Significant Fire Potential Outlook Thursday September 5 th.
Advertisements

VTEC Key Milestones DateActionStatus February 2005 Short-duration VTEC (Five products), initial and final WOU become operational Complete February 2005.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
Mixed Case Risk Analysis August 4, 2014 Michael J. Szkil Chief, Awareness Branch , Ext. 111 NWS Partners Meeting.
Winter Product Simplification: Coming Next Winter NWS Partner’s Meeting June 18, 2008.
1 CFR CHAPTER I AND 1 CFR PART 51 REGULATORY UPDATE.
ASSESSING THE IMPACT OF COLLABORATIVE RESEARCH PROJECTS ON NWS PERFORMANCE Jeff Waldstreicher Scientific Services Division – Eastern Region Northeast Regional.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N Mark Tew Chief, Marine and Coastal Weather Services Branch Office.
VERMONT HOME ENERGY CHALLENGE Implemented in Partnership with the Vermont Energy and Climate Action Network.
Your NOAA National Weather Service Forecast Office and Emergency Management: A Life Saving Partnership! National Severe Weather Workshop Midwest City,
1 Hydro Training Status HSD Meeting February 23, 2010 Mark Glaudemans OCWWS/HSD.
Ideas for Short Term Improvements in NWS Watch/Warning/Advisory Bulletins Jonathan Porter Meteorologist/ Programmer AccuWeather, Inc – State College, PA.
Professional Sign Off for Reclamation Certificates College of Alberta Professional Foresters Professional Workshops, February 15-17, 2011 Grande Prairie,
Tri-Agency Data Sharing by Joel Asunskis, P.E. Hydraulic Engineer/Data Manager Water Control Management St. Louis District U.S Army Corps of Engineers.
1 Watch-by-County & VTEC Why, What, How, When and Operational Considerations Deirdre Jones Jason Tuell Systems Engineering Center.
Bryon Lawrence (NOAA/ESRL/GSD) Thomas Piper (NWS/OST/SEC) Lee Venable (Raytheon Technical Services)
National Weather Service Severe Weather Program VTEC and Watch By County Severe Weather Program VTEC and Watch By County Watch By County/VTEC Partners.
New Marine Weather Warning Product Partners Meeting June 6, 2006 Mark Tew Office of Climate, Water, and Weather Services National Weather Service New Marine.
NOAA’s National Weather Service National Digital Forecast Database: Status Update LeRoy Spayd Chief, Meteorological Services Division Unidata Policy Committee.
Severe Weather Operations. Severe Weather Staffing (Positions in orange are minimum needed) Severe Weather Coordinator – oversees the operations of the.
1 10/17/2015 NWS S&T Committee September 17, 2002 NWS S&T Committee September 17, 2002 Paul Hirschberg Office of Science & Technology Paul Hirschberg Office.
NWS Social Science Activities David Caldwell, Director NWS Office of Climate, Weather and Water & Jennifer M. Sprague NWS Social Science Focal Point OFCM.
Eastern Region WCM Conference Call 1 Warning Products Update: Hurricane Extreme Wind Warning Proposed Headline Changes in NWS Warning Products Mark Tew.
2006 FSUTMS/CUBE Voyager Model Conversion & Support Survey Model Task Force Meeting December 2006.
Summer WAS*IS 2006 National Weather Service Verification Program Overview Brenton MacAloney II National Weather Service Headquarters Silver Spring, MD.
Next Generation Warning Tool (NGWT) Jason Tuell Systems Engineering Center Office of Science and Technology.
NOAA’S National Weather Service Baltimore/Washington Weather Forecast Office (WFO) Weather-Ready Nation OPEN HOUSE September 22, 2012 Jim Lee Meteorologist-in-Charge.
Storm Data and Verification Program Overview NOAA’s National Weather Service Office of Climate, Water, and Weather Services Verification Unit Brenton MacAloney.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
If you fail to prepare, you are prepared to fail. Mark Spitz.
TOWR-G Test for Operational Weather Readiness with GOES-R Joe Zajic NWS Office of Science & Technology – Science Plans Branch Integrity Applications Incorporated.
POLYGON WEATHER WARNINGS – A NEW APPROACH FOR THE NATIONAL WEATHER SERVICE Ken Waters National Weather Service, Honolulu HI *, J. M. Coyne, P. L. Wolf,
WEATHER BY: JENNIFER FAUTH KINDERGARTEN.
AMS Conference on Broadcast Meteorology New Orleans, LA NWS Headline Standardization in Winter Weather Bulletins Mark Tew Office of Climate, Water.
Storm Based Warnings A New Direction in the Warning Process Add Name National Weather Service Add Office.
The Future of WFO Hurricane Products in the Digital Age Effective Threat Communications for Every Customer Barry S. Goldsmith, Senior Forecaster NWS Forecast.
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
TC Watch/Warning Group Update Michael Brennan and Daniel Brown National Hurricane Center 2009 NOAA Hurricane Conference Miami, Florida 2 Dec 2009 Storm.
Weather Event Simulator Best Practices John Ferree Warning Decision Training Branch Norman, OK John Ferree Warning Decision Training Branch Norman, OK.
NWS Operations Proving Ground Update Chad Gravelle OCONUS Meeting 20 June 2013.
June 20, 2007Jennifer Sprague1 Partnership Policy Update Jennifer Sprague, Policy Analyst, Strategic Planning & Policy Office National Weather Service.
New Marine Weather Warning Product Partners Meeting June 20, 2007 Mark Tew Marine Weather Program Leader Office of Climate, Water and Weather Services.
National Weather Service Severe Weather Program VTEC and Watch By County Severe Weather Program VTEC and Watch By County National Severe Weather Workshop.
Challenges in Urban Meteorology: A Forum for Users and Providers Regional Ecosystem Approaches to Urban Environmental Hazard Management September.
National Weather Service Partners Meeting June 18, 2008 Melissa Tuttle Carr Manager, Weather Information Distribution The Weather Channel Kevin Barjenbruch.
NWS Performance Management System DRAFT PLAN FY06 Q2.
The NOAA Center for Weather and Climate Prediction Project Developing a Partnership to Provide a New High Technology Research Center A Briefing to Governor.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
National Weather Service NWS Provision of Information in Geospatial Formats Ken Waters NOAA/National Weather Service Honolulu, Hawaii Partners Workshop,
1 Vision for Marine and Coastal Services Digital Products Jamie Vavra Marine and Coastal Weather Services Branch Office of Climate, Water and Weather Services.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.
1 National Weather Service Response to Partner Issues Eli Jacks, Chief Fire and Public Weather Services Branch 1) Intended Use of “Tornado Emergency” 2)
1 National Weather Service VTEC Status & Plan for Action National Partners Workshop January 15, 2004 Dr. Jason Tuell Office of Science and Technology.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report Satellite Direct Readout Conference for the Americas Miami, Florida.
National Severe Weather Services Dr. Russell Schneider NOAA-NWS Storm Prediction Center 20 June 2007 opportunities, enhancements & plans Briefing for NWS.
Copyright – Disaster Resistant Communities Group – Initial Planning Conference.
1 National Centers for Environmental Prediction: Where America’s Climate and Weather Services Begin Louis W. Uccellini Director, NCEP January 28, 2004.
NOAA National Weather Service Baltimore/Washington Weather Forecast Office "Building Community Awareness to Reduce Hazardous Weather Impacts” April 30,
Options for Future Event-Based Hydrologic Products Tim Helble Hydrologic Services Division Office of Climate, Water, and Weather Services.
Standard Design Process Overview
City of Bixby, Oklahoma 2008 Multi-Hazard Mitigation Plan Update
TOTAL OPERATIONAL WEATHER READINESS – SATELLITES (TOWR-S) PROJECT
BUSINESS OWNER MEETING
2018/2019 School Calendar July August September October November
Verification of Flash Flood Warnings
San Luis Obispo County Integrated Regional Water Management (IRWM) Region Regional Water Management Group (RWMG) Meeting SLO City/County Library Community.
Strategic Planning Timeline Overview
Calendar Overview – Phase I – REVISED April 2019
2015 January February March April May June July August September
Presentation transcript:

1 National Weather Service VTEC Status & Plan for Action National Partners Workshop June 24, 2004 Jason Tuell Office of Science and Technology

2 Overview ObjectiveObjective Current statusCurrent status Actions since the September Partner’s conferenceActions since the September Partner’s conference Proposed scheduleProposed schedule IssuesIssues Interaction with partnersInteraction with partners SummarySummary

3 Current status SoftwareSoftware Original VTEC implemented in AWIPS OB2 softwareOriginal VTEC implemented in AWIPS OB2 software Revised VTEC updated in OB3.1Revised VTEC updated in OB3.1 Deficiencies corrected in OB3.3Deficiencies corrected in OB3.3 NWSI NWSI Updated with new specification and clarificationsUpdated with new specification and clarifications Signed 28 May 2004Signed 28 May 2004 IOT&E completeIOT&E complete

4 Changes since January O4 Delay implementation of VTEC in Marine Forecasts and WarningsDelay implementation of VTEC in Marine Forecasts and Warnings Offshore waters forecast (OFF), Coastal waters forecast (CWF), Near shore waters forecast (NSH), Open Lakes Forecast (GLF)Offshore waters forecast (OFF), Coastal waters forecast (CWF), Near shore waters forecast (NSH), Open Lakes Forecast (GLF) VTEC still to be implemented in Special Marine Warning (SMW), Marine Weather Statements (MWS), Coastal Flood Watch, Warnings, and Statements (CFW), Lakeshore Flood Warnings and Statements (CFW)VTEC still to be implemented in Special Marine Warning (SMW), Marine Weather Statements (MWS), Coastal Flood Watch, Warnings, and Statements (CFW), Lakeshore Flood Warnings and Statements (CFW) Change in scheduleChange in schedule

5 IOT&E IOT&E conducted between 20 Apr through 14 MayIOT&E conducted between 20 Apr through 14 May Testers included service area leads, field forecasters and one Partner (Marvin Mcinnis)Testers included service area leads, field forecasters and one Partner (Marvin Mcinnis) 74 TTRs74 TTRs 31 Critical31 Critical 20 Major (Urgent)20 Major (Urgent) 5 Minor (Routine)5 Minor (Routine) 18 Watch items, potential enhancements, withdrawn or other18 Watch items, potential enhancements, withdrawn or other 2 CONOPS issues2 CONOPS issues 2 New Requirements2 New Requirements Segmentation of follow up statementsSegmentation of follow up statements Head line time rounding requirementsHead line time rounding requirements 19 Headline errors and standardization19 Headline errors and standardization ALLALL reproducible TTRs, headline errors and standardization will be corrected by 28 June Segmented follow up statements for short fuse warnings will be allowed in OB3.3

6 IOT&E ApplicationCriticalMajorMinorTotal Warngen6006 RiverPro1001 WWA

7 Schedule Changes Revised schedule (presented January 2004)Revised schedule (presented January 2004) OT&E 5 July – 30 AugustOT&E 5 July – 30 August Turn key on 1 Dec 2004Turn key on 1 Dec 2004 Driving force behind schedule changesDriving force behind schedule changes Performance problems in OB3 delayed development and testingPerformance problems in OB3 delayed development and testing Errors discovered during IOT&EErrors discovered during IOT&E Service back up and unique OCONUS requirementsService back up and unique OCONUS requirements Schedule change will allowSchedule change will allow Correction of IOT&E deficienciesCorrection of IOT&E deficiencies Implementation of unique OCONUS requirementsImplementation of unique OCONUS requirements Implementation of robust service back up capabilityImplementation of robust service back up capability More coordination between the NWS and partnersMore coordination between the NWS and partners

8ScheduleDateMilestone VTEC/WBC OT&E PNS NLT 3 June OB3.3 Deployment start 27 July OT&E TRR 20 August OT&E 30 August – 8 October OB4 SVR 2 September OB4 Deployment start 8 September OB4.x check in 9 November OT&E Evaluation Go/No Go 9 November VTEC/WBC Turn key PNS 16 November OB4 Deployment end 6 January 05 OB4.x Deployment end 13 January 05 VTEC/WBC turn key 8 February 05

9 Schedule Issues – OT&E Watch-by-County, VTEC OT&E run concurrentlyWatch-by-County, VTEC OT&E run concurrently ~20 VTEC sites~20 VTEC sites ~20 WBC sites~20 WBC sites Evaluation criteria defined in OT&E planEvaluation criteria defined in OT&E plan Use of scripted scenarios for out-of-season productsUse of scripted scenarios for out-of-season products Majority of long fuse products (winter weather, non- precipitation) to be tested using scripted scenariosMajority of long fuse products (winter weather, non- precipitation) to be tested using scripted scenarios

10 Products with VTEC Public Products Severe Thunderstorm Warning SVR Tornado warning TOR Winter Storm Watch WSW Non-Precipitation Warning NPW Severe Weather Statement SVS Watch County Notification WCN Watch Outline Message (7 July) WOU Fire Weather Watch/Red Flag Warning RFW Hydro Products Flood Watch FFA Flash Flood Warning FFW Flood Warning FLW Flash Flood Statements FFS Flood Statements FLS

11 Locally Generated Products Marine Products Special Marine Warning SMW Marine Weather Statements MWS Coast Flood Watch, Warning, Statement CFW Lakeshore Flood Warning, Statement CFW

12 Partner-NWS Interaction Robert McLeod Chief, Awareness Branch Office of Climate, Water, and Weather Services

13 Partner Interaction Must ensure adequate feedback on VTEC and other issuesMust ensure adequate feedback on VTEC and other issues Participation in OT&E is critical as learned in WBCParticipation in OT&E is critical as learned in WBC Planning and executionPlanning and execution Draft OT&E plan out for reviewDraft OT&E plan out for review VTEC listserve/r er to disseminate and share VTEC related information Send comments to

14 Summary VTEC turn key 8 Feb 2005VTEC turn key 8 Feb 2005 OT&E late summer early fallOT&E late summer early fall Conduct joint OT&E to determine whether we are jointly ready for VTEC February 2005Conduct joint OT&E to determine whether we are jointly ready for VTEC February 2005 Work together to make VTEC a success!