Luminosity Monitor Commissioning MICE Collaboration Meeting 26 24 March 2010 Paul Soler, David Forrest Danielle MacLennan.

Slides:



Advertisements
Similar presentations
NDVCS measurement with BoNuS RTPC M. Osipenko December 2, 2009, CLAS12 Central Detector Collaboration meeting.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Robert Cooper L. Garrison, L. Rebenitsch, R. Tayloe, R. Thornton.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
Beam Position Monitors MICE CM Harbin January, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Mar 31, 2005Steve Kahn -- Ckov and Tof Detector Simulation 1 Ckov1, Ckov2, Tof2 MICE Pid Tele-Meeting Steve Kahn 31 March 2005.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
CMPB Alain Blondel 14 April STATUS OF MICE.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
Forward Detectors and Measurement of Proton-Antiproton Collision Rates by Zachary Einzig, Mentor Michele Gallinaro INTRODUCTION THE DETECTORS EXPERIMENTAL.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
Energy Distribution of Cosmic Ray Muons Paul Hinrichs With David Lee Advised by Phil Dudero.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Yury Gurchin June 2011 MEASUREMENT OF THE CROSS-SECTION IN DP-ELASTIC SCATTERING AT THE ENERGIES OF 500 AND 880 MEV AT NUCLOTRON.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
1 Measurement of particle production from the MICE target Kenny Walaron, Paul Soler University of Glasgow.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
1 Giuseppe G. Daquino 26 th January 2005 SoFTware Development for Experiments Group Physics Department, CERN Background radiation studies using Geant4.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
FTOF Status Anton A. Izotov, Frascati
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
The MiniBooNE Little Muon Counter Detector
Jean-Sebastien Graulich, Geneva
Luminosity Monitor Status
MICE Collaboration Meeting
Времяпролетный детектор PANDA
Particle ID Diagnostics in the MICE Beamline
GEANT Simulations and Track Reconstruction
COMPTON SCATTERING IN FORWARD DIRECTION
Presentation transcript:

Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan

2 LM Commissioning, MICE VC, 25 February 2010 Purpose of Luminosity Monitors o Luminosity monitor to determine particle rate close to target and extract protons on target as function of depth – independent of beam loss monitors. o Luminosity monitor will record the number of particles crossing 4 scintillators for every spill – can build up high statistics to validate particle production in target. o By having a small plastic filter we can also reduce low energy protons – some sensitivity to proton energy. o Can be used to compare particle rates close to target (luminosity monitor measures mainly protons and pions) with other counters along beamline (GVA1, TOF0, CKOV, TOF1 and FBPM counters which measure pions, muons, electrons) – validate beamline simulations o For this reason, the luminosity monitor will be very useful for beam commissioning

3 LM Commissioning, MICE VC, 25 February 2010 o Final design of luminosity monitor: Luminosity Monitor Design Beam Cuts off: protons ~500 MeV/c pions ~150 MeV/c (6 mm thick)

4 LM Commissioning, MICE VC, 25 February 2010 o Final design of luminosity monitor: Luminosity Monitor Design Beam Cuts off: protons ~500 MeV/c pions ~150 MeV/c

5 LM Commissioning, MICE VC, 25 February 2010 o PMTs: Hamamatsu H5783P — 0.8 ns rise time — ~1x10 6 gain — Only need to provide <15V to power PMT oReadout: use NIM coincidence units and count three channels using VME scalers already in DAQ Photomultipliers 50 mm High rate capability with 20 ns coincidence gate If rate still an issue, can make more shielding LMC-12 LMC-34 LMC-1234 Discriminator set at 500 mV for all channels

6 LM Commissioning, MICE VC, 25 February 2010 Installation of Luminosity Monitors o Installation of Luminosity Monitor: January 2010 o Many thanks to Willy, Jeff Barber, Daresbury cabling team o Installed RG58 cables (8 x 80 m between ISIS vault and MICE control room) o Stand modified for luminosity monitor and installed in vault

7 LM Commissioning, MICE VC, 25 February 2010 Installation of Luminosity Monitors o Position of luminosity monitor:10 m from target at 25 o.

8 LM Commissioning, MICE VC, 25 February 2010 Commissioning Luminosity Monitors o Commissioning was performed in January and 7 February with a dedicated MICE run o Purpose: define detector HV conditions, determine discriminator levels, synchronise with ISIS signals, set-up scalers, run at different beam loss levels to test correlation with LM detectors. o Unfortunately, one PMT was dead when installed in January so this also had to be replaced on 7 Feb o Gate initially 5 ms but now gate is 3.23 ms (same as trigger)

9 LM Commissioning, MICE VC, 25 February 2010 Commissioning Luminosity Monitors o Runs performed 7 February (many thanks to Terry, Pierrick, Adam and Vassil for help during shift!) Beam Loss (V) Runs (5 ms gate)Runs (3.2 ms gate) Run numActuationsRun numActuations ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

10 LM Commissioning, MICE VC, 25 February 2010 Preliminary analysis of data o Adam Dobbs provided the analysis of the beamloss data o Preferred method is to integrate beam loss signal in sector 7 o Unfortunately, this method at the moment produces unreliable results below a beamloss of ~0.30 V o The method can be improved by subtracting background before and after beamloss signal but analysis not implemented yet o Instead, removed beamloss < 0.30V

11 LM Commissioning, MICE VC, 25 February 2010 Preliminary analysis of data Removed unreliable Beamloss

12 LM Commissioning, MICE VC, 25 February 2010 Preliminary analysis of data Removed unreliable Beamloss

13 LM Commissioning, MICE VC, 25 February 2010 Preliminary analysis of data Removed unreliable Beamloss

14 LM Commissioning, MICE VC, 25 February 2010 Preliminary analysis of data o Summary of results: LMC-12: 1955 particles per V.ms / 4 cm 2 LMC-34: 2086 particles per V.ms / 9 cm 2 LMC-1234: 889 particles per V.ms / 4 cm 2 o Beam-loss monitor calibrations: o Assume beamloss calibration of 3.5x V.s/pot at 9 ms. LMC-12: 1.71x10 -8 particles/(pot. cm 2 ) LMC-34: 0.81x10 -8 particles/(pot. cm 2 ) LMC-1234: 0.77x10 -8 particles/(pot. cm 2 ) BLM calibrations as function of KE (from Dean Adams):

15 LM Commissioning, MICE VC, 25 February 2010 o Simulations for the old target (10x1 mm 2 ) with different geometry using MARS and GEANT4 at 800 MeV yield: MARS simulation: GEANT4 simulation: o Good agreement with observed rate for MARS, GEANT4 simulations and unshielded detectors (LMC-12). o Even though these simulations were done using the old target, the average material in target is very similar: New target:  ( )=11.7 mm 2 Comparison to simulations Beam

16 LM Commissioning, MICE VC, 25 February 2010 o We are running new simulations using G4Beamline o Set up cylindrical target (R=3mm,r=2.3mm), and two detectors 100x100cm 2, separated by 15 cm plastic at 10 m and 25 o angle. Include 6 mm thick steel from target enclosure New simulations Detectors Beam pipe Target

17 LM Commissioning, MICE VC, 25 February 2010 o Only select particles within acceptance of detectors (100x100cm 2 at 10 m) and kill all other particles o Test that we don’t kill valid particles by changing kill volumes New simulations Proton Beam Target (yellow volumes)

18 LM Commissioning, MICE VC, 25 February 2010 o Only select particles within acceptance of detectors (100x100cm 2 at 10 m) and kill all other particles o First run with QGSP hadronic model Comparison hadronic models Shielded detectors Unshielded detectors QGSP

19 LM Commissioning, MICE VC, 25 February 2010 o Only select particles within acceptance of detectors (100x100cm 2 at 10 m) and kill all other particles o Now run with QGSP_BERT (QGSP+Bertini cascade model) for comparison Comparison hadronic models Shielded detectors Unshielded detectors QGSP_BERT

20 LM Commissioning, MICE VC, 25 February 2010 o Compare number protons crossing unshielded detector (10 4 cm 2 ) for different hadronic models (up to a factor 2): Comparison hadronic models Hadronic model Number protons in unshielded detector Protons on target (pot) Area detector (cm 2 ) Protons/ (pot cm 2 ) In unshielded LHEP x10 -9 LHEP_BERT x10 -9 QGSC x10 -9 QGSP x10 -9 QGSP_BERT x10 -9 QGSP_BIC x10 -9

21 LM Commissioning, MICE VC, 25 February 2010 o Compare number protons crossing unshielded detector (10 4 cm 2 ) for the two target geometries to understand normalisation o Compare new target (cylinder with outer radius 3 mm and inner radius 2.3 mm) with old target (10 mm x 1 mm) Comparison target geometry o Volume material in each target is very similar (assume depth inside beam=10mm): Old target: 10x1x10 mm 3 New target:  ( )x10=116.7 mm 3 New Old

22 LM Commissioning, MICE VC, 25 February 2010 o Compare number protons crossing unshielded detector (10 4 cm 2 ) for two target geometries (using QGSP_BIC) Comparison target geometry Target geometry Number protons in unshielded detector Protons on target (pot) Area detector (cm 2 ) Protons/ (pot cm 2 ) Unshielded detector New x10 -9 Old x10 -8 o There is a factor of ~8 difference in normalisation, but we need to take into account that old target has 10 mm thickness o New target has variable thickness due to geometry of cylinder (effective average thickness mm=116.7/60) o Need to correct for number protons that actually interact with target to correct for normalisation, but can estimate: (agreement not as good!)

23 LM Commissioning, MICE VC, 25 February 2010 o Luminosity Monitors have been installed in ISIS vault and are working properly o MOM now has instruction sheet to operate detectors o LM data scales very well with beam loss data o Calculation of protons on target from old simulation (for the old target) agrees with data from LM o Normalisation of new simulations for cylindrical target does not agree so well and work is still in progress to understand this. o Need to improve method for beamloss calculation at low beamloss (<0.03 V) o Once further verification of scalar data and better understanding normalisation in simulations, we can use the LM scalar data to determine protons on target, independent of beamloss data Conclusion