06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.

Slides:



Advertisements
Similar presentations
Alice EMCAL meeting, July EMCAL jet trigger status Olivier BOURRION LPSC, Grenoble.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
ESODAC Study for a new ESO Detector Array Controller.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
HCAL Trigger Primitive Generator Tullio Grassi University of Maryland September 2004.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
CMS/ESSC. May, 2002HCAL TriDAS1 HCAL FE/DAQ Overview Shield Wall CPUCPU DAQ RUI HPD FE MODULE DAQ DATA SLINK64 [1 Gbit/s]  18 HTRs per Readout Crate FRONT-END.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
1 Cost Estimate (and configuration) Drew Baden Univ. Of Maryland July 2001.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland June 2004.
UMD DOE Review - 30-Aug-05 Drew Baden1 CMS Trigger Elecctronics CMS HCAL TriDAS is a joint effort between: –University of Maryland – Drew Baden –Boston.
HF Luminosity and Jet Triggering Drew Baden, Tullio Grassi, Jeremy Mans University of Maryland Chris Tully Princeton University Bob Hirosky University.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
4-APR-06 CMS SLHC Perugia - Baden 1 Forward Jet Triggering for an Upgraded CMS Drew Baden - University of Maryland Jeremy Mans - University of Minnesota.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
Understanding Data Acquisition System for N- XYTER.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CMS/CERN. June, HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland June 2002
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
PXD DAQ News S. Lange (Univ. Gießen) Belle II Trigger/DAQ Meeting (Jan 16-18, 2012, Hawaii, USA) Today: only topics important for CDAQ - GbE Connection.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
Update on CSC Endcap Muon Port Card
ATLAS L1Calo Phase2 Upgrade
CMS SLHC Calorimeter Trigger Upgrade,
ECAL OD Electronic Workshop 7-8/04/2005
LHC Collisions.
Introduction HCAL Front-End Readout and Trigger Joint effort between:
HCAL Configuration Issues
CSC Trigger Muon Port Card & Sector Processor in production
Lehman 2000 Project Timeline
Sector Processor Status Report
Data Concentrator Card and Test System for the CMS ECAL Readout
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing

06-Dec-2004 HCAL TriDAS 2 HF Luminosity

06-Dec-2004 HCAL TriDAS 3 HF Luminosity Project Who: –Princeton (Marlow+…) –Maryland (Baden+Grassi+Mans+…) What: –Produce instantaneous luminosity outside of DAQ and Level 1 path No requirement on triggers, partitions, etc –Targets: LHC machine feedback (independent of detector running state) CMS “Luminosity database” Online display

06-Dec-2004 HCAL TriDAS 4 Baseline Design Topology 9 HTRs for HF+ and HF- Each HTR has 1 output with luminosity info (next slides…) –100Mbps UDP ethernet packets sent to router Router routes to computer over Gigabit ethernet Deadtime, throttle, etc. info from Global Trigger sent to CPU This computer will feed LHC machine, luminosity DB, and online needs HTRHTR HTRHTR HF  9 HTRs/VME crate HTRHTR HTRHTR HF  ROUTERROUTER CPU Global Trigger

06-Dec-2004 HCAL TriDAS 5 In Each HTR Xilinx… Each HTR Xilinx talks to half of each SLB site –24 channels per Xilinx, 48 channels total per HTR –Thanks to Jim Rohlf for making this suggestion several years ago Each HF Luminosity card will sit on single SLB site –Can get info from both Xilinx’s, all 48 channels, into any SLB site –Each SLB has 72 pins available for 40MHz data transmission Card will receive: –Sum ET over the 24 channels, so 2 sums per bucket –2 bits per channel 00=channel dead (or link gone) 01,10,11 for 2 different threshold comparisons Bit count: –16 bit E T sums, 32 bits total –Use 2 bits per channel – 48 channels, 2 bits, 96 bits total –Assorted single bits: L1A+BC0, 2 bits “80MHz frame label”, 4 bits Total of 134 needed out of 144 bits available –Can run at 80MHz, gives 144 effective “bits” to use –Tullio has verified that this works ok with some care in clock phase

06-Dec-2004 HCAL TriDAS 6 HF Luminosity Card Initial prototype board built, next version due back March 1 –32MBytes of SDRAM –Virtex2PRO/VP7 has 722kbits block ram –Embedded processor Function: –Receive 40MHz from each Xilinx –Keep running sum of tower occupancy per bucket –Keep ethernet blasts in memory for transmission R&D –Ethernet: Jeremy has firmware now that sends packets to CPU working –Tullio has tested 80MHz running, works ok –Can add Flash RAM to load Linux OS (but why?) TOP BOT

06-Dec-2004 HCAL TriDAS 7 Software Luminosity information will be written to a CMS database for physics analysis –Several times per minute probably adequate DØ) Live time information needs to get to the cpu –Crucial to be able to keep track of things to get decent luminosity for physics –Running conditions –Resets –L1A inhibits –Etc.

06-Dec-2004 HCAL TriDAS 8 Self Slice 05

06-Dec-2004 HCAL TriDAS 9 Slice Test Triggering Self triggering –Send data to HF Luminosity board from each Xilinx –Use TPG path firmware, load LUTs correctly Send 1 bit per tower for threshold Majority logic, send 1 bit to “Trigger Concentrator” board Forms majority logic for Trigger Board –Trigger Concentrator Board Another Jeremy Mans special –With thanks to Princeton engineers 6U VME board with many LVDS/LVPECL inputs and a few LVPECL outputs Can be used to collect the outputs of many "sandwich" boards and perform a coincidence for triggering the system on cosmics

06-Dec-2004 HCAL TriDAS 10 HF Trigger

06-Dec-2004 HCAL TriDAS 11 HF Trigger Project Not much in the past 6 months because… –Busy with current efforts –Project funding and all that Basic idea: –HF HTRs need 1 SLB and 1 Luminosity card on SLB sites –This leaves 4 unused sites for HF Trigger –4x4 sliding window using HF Towers to contain the jet Current RCT uses HF TPGs which are built from 6 HF Towers (2  x3  ) –For isolation another 2 Towers on each side in  (and maybe in  ) 6x6 for area for each jet candidate 1 HTR

06-Dec-2004 HCAL TriDAS 12 R&D R&D list for Trigger project –Simulation needed to settle on algorithm approach –4-slot (SLB slot) HF Trigger (HFT) card: Learn how to use new FPGA’s with embedded processing, DSP, built-in serdes… ) Verify HTR to 80MHz (DONE) Begin design…not yet –HFT to HF Jet Finding (HJF card) transmission Study transmitting signals over <5m cat7 copper 1.6Gbps Use crystals to drive transmitter as an alternate scheme R&D quad serializers on the HFT and quad deserializers on HFJ 10G optical transmission using crystals and single-mode fibers Consider newer, larger FPGAs to make 1 HFJ per side for I/O reduction –HFJ Study algorithms for clustering – lots of simulation needed here –R&D on how to include HE to get the meat of the WBF signal and extend jet trigger to full CMS