Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
Central Massachusetts Regional Stormwater Coalition Part 5 Standard Operating Procedures September 26, 2013 Community Innovation Challenge Grant 2013.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
Middle Tennessee State University
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Click on the links below to learn more: What is stormwater and what are the issues? How does the Township Address the Issues? Township Ordinances that.
New Jersey Municipal Stormwater Regulation Program Permit Changes.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
MCM#6 Pollution Prevention/Good Housekeeping Part 4 Part 4 Municipal BMPs – Cleaning &Maintenance.
Storm Water Pollution Prevention Training
NPDES Stormwater and the Town of Wrightsville Beach.
HOW TO DO Pollution Prevention & Good Housekeeping NC STATE UNIVERSITY.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
TOWN OF NEW CASTLE PHASE II ANNUAL STORMWATER REPORT GP Effective May 1, 2010 Expires: April 30, 2015 Reporting Period: March 10, 2014-March 9,
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
Municipal Operations 10/9/20151 Municipal Operations.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Stormwater Rain and melting snow Collected by storm drains and flows into streams, rivers, lakes.
Introduction to MS4 Stormwater Requirements (2009)
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Phase II National Storm Water Regulations What’s in it for you?
Stormwater Pollution Prevention Training
MCM#6 Pollution Prevention/Good Housekeeping Part 1 Municipal Facility Management.
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Part 5 - Good Housekeeping
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
North Hennepin Community College MS4 Plan October 24, 2014.
Hampden Township Stormwater Management Program
New Jersey Department of Environmental Protection
Advanced Environmental Management (AEM) Training Phase I
MS4 On-site evaluations & common findings
New Jersey Department of Environmental Protection
Summit County MS4.
Stormwater Management Program
MS4 OVERVIEW 2015.
Illicit Discharge Detection & Elimination (IDDE) Plan
Presentation transcript:

Statewide Basic Requirements for Stormwater

New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development, redevelopment, and existing development at the Public Complex are to be put into effect through Statewide Basic Requirements (SBR’s). The permit specifies the Best Management Practices (BMP’s) that will be implemented for those SBR’s. The SBR’s and related BMP’s are in the Public Complex’s Stormwater Pollution Prevention Plan (SPPP). Photo: /Rentpond.htm

Public Notice Follow State and local public notice requirements when public participation is provided in the development and start of the Public Complex’s stormwater program. Annually certify that State and local public requirements were followed. Photo: services/stormwater.html

Post-Construction Stormwater Management in New Development and Redevelopment Develop a program to address stormwater runoff from development projects that disturb one acre or more, and projects less then one acre that are part of a larger development. Certify annually that we are actively enforcing a program to address stormwater runoff from development projects with minimum standards. Upon the effective date of permit authorization, Stockton will adopt applicable designs for major development.

Local Public Education Describe how employees will be informed and will include an educational event and establish a storm drain inlet labeling program and label all storm drain inlets. Annual statement that the minimum standard has been met and date/description of the annual event. Continue program of labeling drain inlets and identify the number of inlets labeled yearly. Must be implemented within 12 months. Both Photos: st-louis.mo.us/../Drain Stenciling

Improper Disposal of Waste Adopt and enforce a mechanism to control litter, prohibit improper spilling, dumping, or disposal of materials into stormwater, stop the feeding of wildlife, and develop a vegetative waste collection and disposal program. Annually certify that we have met the minimum standard for Litter Control, Improper Waste Disposal Control, Wildlife Feeding Control, and Vegetative Waste. Must be implemented within 18 months. Photo:

Illicit Connection Elimination and MS4 Outfall Pipe Mapping Map the location of the end of all MS4 outfall pipes and all surface water bodies receiving discharges. Prohibit illicit connections to the MS4. Inspect all outfall pipes and damaged pipes. Keep track of the number of outfall pipes, annually make sure that an illicit connection elimination program has been developed and follows the permit. Within 18 months prohibit an appropriate regulatory mechanism, illicit connections to MS4 and a program to detect/eliminate illicit connections into MS4.

Solids and Floatable Controls Minimum Standard- Photo: gov/html/dep/gov/html/dep/html/float.html Stockton will sweep all parking lots a curbed streets with storm drains and a posted speed limit of 35 mph or less at least once per month Retrofit existing storm drain inlets to meet standards. Photo: lessons/storm_drains/drains.html Photo: operations/strinlet.aspwww.tampagov.net/.../ operations/strinlet.asp

Operations and Maintenance- Stockton will develop 1. A program for cleaning and maintaining stormwater facilities. 2. A roadside erosion control program to identify and repair erosion along streets. 3. A stormwater outfall pipe scouring detection, remediation and maintenance program. Photo: FloodDamage2001.html Photo: /FloodDamage2001.html

Solids and Floatables Control Continued… Certify annually that minimum standards have been met Within 12 months have developed a street sweeping program, will retrofit storm drain inlets, and will have developed a stormwater facility maintenance program so that they all meet minimum standards. Within 18 months develop a roadside erosion control maintenance program with the minimum standards and begin implementing an outfall pipe stream scouring detection, remediation, and maintenance program.

Maintenance Yard Operations Construct a permanent structure for storage of salt, develop procedures for vehicle fueling and receiving of bulk fuel deliveries, vehicle maintenance and repair activities, and implement good housekeeping procedures for all materials or machinery listed in the Inventory Requirements for Maintenance Yard Operations. Certify annually that the minimum has been met. Implement within 12 months of the permit, the interim seasonal tarping BMP, comply with the 50 ft. buffer requirement, have procedures for fueling operations, and vehicle maintenance, and Good Housekeeping Practices. Within 36 months store all salt and de-icing materials in a permanent structure. Photo: gallery/index-street-departm... Photo: ccdphp/dnpa/immpact /deficiencies.htm

Employee Training Develop an annual employee training program for appropriate employees on appropriate topics such as the following Waste Disposal, Control Measures, Vegetative Waste, Illicit Connection elimination and Outfall Pipe Mapping, Street Sweeping, Stormwater Facility Maintenance, Road Erosion control and Outfall Pipe Stream Scouring Remediation, Maintenance yard Operations, and Stormwater Certify annually the date of the annual employee training. Implement within 12 months. swcd/newsletter/litterdrains.ht m

Construction Site Stormwater Runoff Control The department is responsible for developing, implementing, and enforcing a New Jersey Pollutant Discharge Elimination System permit program to reduce pollutants in stormwater runoff to small MS4s from construction activities. Stockton is not required to include this Statewide Basic Requirements (SBR) in its stormwater program or discuss this SBR in its Stormwater Pollution Prevention Plan (SPPP). Photos:

Permit Data Table RequirementsMinimum StandardEffective date of permit authorization Within 12 months Within 18 months Within 36 months Certify Annually Public NoticeFollow notice requirements when participation is in the development and start of Stockton’s stormwater program On the effective date of the permit authorization State and local public requirements were followed Post- Construction in New Development/ Redevelopment Develop programs addressing runoff from development projects disturbing at least one acre, and projects less then one acre that are part of larger developments Adopt applicable designs for major development Address stormwater runoff from development projects with min. standards Local Public Education Describes how employees will be informed, and an educational event, along with establishing a program for labeling drain inlets in specific areas Developed min. standard for Education & labeling of Storm drains Meet min. standards, note the date, & labeling with the number of inlets noted Improper Waste Disposal Control litter, prohibit spilling, dumping, or disposal into stormwater, stop feeding of wildlife and develop vegetative waste collection/disposal Implemented min. standard for particular programs Meet min. standards for particular programs MS4 Pipe Mapping Map all MS4 outfall pipe maps/ surface water bodies receiving discharges, prohibit illicit connections to MS4, inspections of outfall pipes and damaged pipes will be looked into Prohibit appropriate regulatory mechanisms (MS4) and a program to detect illicit connections into MS4 Keep track of outfall pipes, no illicit connections, an illicit connection elimination program developed.

Permit Data Table Continued Solids and Floatables Sweep parking lots/curbed streets w/storm drains and posted speed limits <35 mph 1 a month. Retrofit storm drains to fit standard. Develop roadside erosion control and stormwater outfall pipe scouring detection Street sweeping program, have retrofitted storm drains, and stormwater maintenance program Roadside erosion control program, outfall pipes needing repairs will be completed. Street sweeping, retrofitting, functioning of stormwater drains, catch basins cleaned, roadside erosion in progress, and outfall pipe stream scouring Maintenance Yard Operations Construct a permanent structure for de-icing material, perform regular maintenance, develop procedures for vehicle fueling, receiving bulk fuel deliveries, and vehicle maintenance and repair. Good Housekeeping Procedures Seasonal tarping BMP, comply with the 50 ft. buffer requirement, fueling operations, and vehicle maintenance, and keep things clean Store Salt and De- Icing Materials perman- ently Min. standards for De- Icing storage, vehicle fueling/ maintenance, and bulk receiving standard procedures Employee Training Employee training program for employees on appropriate topics Full Training must Begin Employee Training