Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
E.K.Stefanides March 07, The Muon Spectrometer of the ATLAS detector: progress report on construction and physics studies at the University of Athens.
Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
sTGC for ATLAS Small Wheel upgrade
DESY Zeuthen 1 Precision drift chambers (MDT) for ATLAS muon system. G.Chelkov JINR (Dubna) DESY Zeuthen 10 September 2002.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers University of Athens (UoA) Tube wiring/assembly (30,000.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
D. Peterson, Muon Spectrometers at ATLAS and CMS, presentation to LEPP 19-Nov  spectrometers at ATLAS and CMS Our charge: Survivability Resolution.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY.
14/11/03 CERN-ilo presentationC.Kourkoumelis,UoA1 ATLAS Muon Drift Tube wiring and testing in Greece Joint effort UoA+NTUA* Athens,14/11/03 Christine KOURKOUMELIS.
1-4 April 2004HEP 2004 D.Fassouliotis, UoA ATLAS Muon Chambers Construction in Greece Dimitris Fassouliotis Conference on RECENT ADVANCES IN PARTICLE AND.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
LHeC : Muon Systems L. Pontecorvo.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Muon System and Physics Performance Ludovico Pontecorvo CERN-INFN.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Simulating the Effects of Wire Sag in ATLAS’s Monitored Drift Tubes Ashley Thrall, Vassar College ‘04 Dan Levin, Mentor REU Presentations August 5, 2004.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Measuring the Position Resolution of a COMPASS Drift Chamber Prototype Rojae Wright 1, Ihnjea Choi 2, Caroline Riedl 2, Matthias Grosse Perdekamp 2 (1)
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
1998 IEEE Nuclear Science Symposium, Toronto, Canada High-Precision, Large-Volume Particle Tracking U. Bratzler* Outline (Example: Muon Tracking in ATLAS)
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon-raying the ATLAS Detector
M. Bianco On behalf of the ATLAS Collaboration
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Luca Spogli Università Roma Tre & INFN Roma Tre
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
The ATLAS Muon Spectrometer 1 has ~355,000 drift tubes installed into 1200 precision Monitored Drift Tube (MDT) tracking chambers arrayed over a 22 m high,
Summer Student Session, 11/08/2015 Sofia Ferreira Teixeira Summer Student at ATLAS-PH-ADE-MU COMSOL simulation of the Micromegas Detector.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Precision Drift Chambers for the ATLAS Muon Spectrometer
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Detectors for VEPP-2000 B.Khazin Budker Institute of Nuclear Physics 2 March 2006.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
HEP 2007 – 20 Jul 2007 · Manchester, England Commissioning with Cosmic Rays of the ATLAS Muon Spectrometer F.Petrucci INFN Sezione di Roma Tre and Dipartimento.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
S.Movchan Straw prototype beam test into the NA48 infrastructure
Production ad Quality control of RPCs for the CMS muon barrel system
Dubna/JINR Status & Plans
Llea Nasira Samuel Benedict College Charlotte Wood-Harrington
CMS muon detectors and muon system performance
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
ATLAS Muon Spectrometer and
Use of Beam Loss Monitor type detectors in CNGS muon station
Pre-installation Tests of the LHCb Muon Chambers
(On Behalf of CMS Muon Group)
Presentation transcript:

Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03

MDTMDT MDTMDT TGCTGC RP C CS C Monitored Drift Tubes ( |η| < 2 ) with a single wire resolution of 80 μm 1194 chambers, 5500m 2 GREECE constructs 13% Cathode Strip Chambers (2 < |η| < 2.7) at higher particle fluxes 32 chambers, 27 m 2 Resistive Plate Chambers (|η| < 1.05) with a good time resolution of 1 ns 1136 chambers, 3650 m 2 Thin Gap Chambers (1.05 < |η| < 2.4) at higher particle fluxes 1584 chambers, 2900 m 2 Precision chambers Trigger chambers ATLAS: Muon Chambers Each detector has 3 stations. Each station consists of 2-4 layers.

ATLAS MUON SPECTROMETER (View of non-trigger chambers)

: MDTs Monitored Drift Tubes width (tube length) : cm length : cm Tube : Al, 30 mm φ, 0.4 mm wall Wire : 50 μm, W/Re alloy (97/3) Gas : Ar/CO 2 (93%/7%) at 3 bar Gas gain : 2x10 4 at 3080 V Maximum drift time : ~ 700 ns Resolution : 80 μm

Anode Wire Mechanical Tension350 gf  5% Anode Wire Mechanical Tension (350 gf  5% ) High Voltage Leak Current High Voltage Leak Current (<2nA/meter) Gas Leak Rate Gas Leak Rate (<2*10 -2 bar*lit/sec) Anode Wire Position  25 μm) Anode Wire Position (  25 μm) Construction requirements/specifications for MDT tubes Construction requirements/specifications for MDT tubes To comply with the above : precision tooling, clean rooms, intense QA/QC tests, all three institutions

University of Athens : Muon tube wiring facility (

University of Athens : Muon tube wiring facility

Wire insertion – wire tensioning University of Athens : Muon tube wiring facility Wire threading- wire tensioning

Tube production quality checks Wiring tension Finished tube length

DRIFT TUBE PRODUCTION IN THE UoA WORKING CONTINOUSLY SINCE Sept STEADY PRODUCTION OF 42 tubes/day

Anode Wire Mechanical Tension Anode Wire Mechanical Tension measurement T =   D 2 L 2 f 2 L= 165 cm is the wire length D= 50 μm is the wire diameter ρ = 19.3 gr/cm 3 is the density of the wire material Nominal Value NTUniversity of Athens : Muon tube testing facility

High Voltage Leak Current High Voltage Leak Current measurement A bunch of 16 tubes is connected in parallel and supplied by the gas mixture Ar:CO 2 (93:7) at 3 bar absolute pressure and high tension of 3400 V. The voltage drop across a resistor of 1.1 MΩ in series with the tubes is being measured for each tube. Leak Current < 2nA/m NTUniversity of Athens : Muon tube testing facility

Gas Leak Rate Gas Leak Rate measurement The idea is to fill the tubes with the detector gas (Ar:93 %, CO 2 :7 %) and then measure the pressure drop due to gas leakage at the time interval t. V is the volume of the "leaking" tube and Δp is the pressure drop. NTUniversity of Athens : Muon tube testing facility

Anode Wire Position Anode Wire Position measurement

University of Thessaloniki : Muon chamber assembly facility

Height adjustment of layers Relative position controlled to +-10μm Rasnik tower results for 80 chambers

BIS quality CERN (1 st chamber –out of 12 construction sites -to meet construction requirements) X-RAY TOMOGRAPHY X-RAY TOMOGRAPHY The results meet the ATLAS specifications !!! April ÷ 13.9 µm July ÷ 16.2 µm

BIS CERN’s-testbeams X5/GIF 2002

UoA cosmic rays set-upAUTh cosmic rays set-up BIS home institutions

BIS chamber construction in Greece Has been going extremely well for 3 years-will finish soon !

Bare chambers production expected to finish by next April Meanwhile: Equip the chambers with services ( gas, electronics..) Test EVERY chamber with cosmic rays BE READY FOR INSTALLATION at the pit by Aug.2004 (Olympic games)- 150 chambers SUMMARY

BIS chamber integration-services

Cosmic ray set-up to test several chambers simultaneously 90 chambers are already constructed, should be equipped and tested

Muon Chamber alignment for Higgs studies Aim of the study  Estimate how muon chamber misalignments influence Higgs reconstruction into 4 muons, H  ZZ  4μ, its mass resolution and the number of accepted events.  Study how can the possible shifts be discovered and estimated from the data.

Barrel projective alignment End-cap pseudo-projective alignment

 Global End-Cap translation I.Longitudinal trans. (named displ z) II.Transverse translation (named displ T) (0, 1, 3 and 5 mm)  Global End-Cap rotation I.Rotation around beam axis (named rotat z) I.Rotation around transverse to the beam axis (named rotat T)(0, 2.5, 5 and 10 mrad) Only one end-cap was misaligned (the other was kept unchanged- for reference )

The effect of 5 mm longitudinal displacement of one end-cap for the reconstructed Higgs m H =200 GeV m H =300 GeV

The relative increase of the width of the reconstructed 200 GeV Higgs Translations Rotations

The relative decrease in the acceptance of the reconstructed 200 GeV Higgs candidates Translations Rotations

Influence of end-cap rotations on Z’s (at least one μ in rotated end-cap) Effect is big and can easily be spotted!!

The increase of the width of the reconstructed Z’s (when one muon is in the misaligned end-cap) Translations Rotations

SM Higgs Potential: 3 LOW LUMINOSITY Conclusions: The misalignments effects we studied : can be spotted from their effect on the Z width and corrected for will not influence the Higgs potential for the specific channel more than a few percent