1 NETWORK PLANNING TASK FORCE “ SUMMER PLANNING SESSIONS ” 8/01/05.

Slides:



Advertisements
Similar presentations
NETWORK TRANSFORMATION THROUGH VIRTUALIZATION
Advertisements

Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.
NAG Meeting October 29, Agenda Welcome New technical staff member – Amanda Berlin Dialog on Web Filtering Requirements E-Rate Opportunities.
1 NETWORK PLANNING TASK FORCE August 2, 2004 “SUMMER FOCUS GROUP SESSION ”
October 16, Network Planning Task Force Information Security Strategy.
Responsibility Center Management 1. Known as RCM, it is the managerial framework for our internal budgeting and financial reporting activities Created.
1 NETWORK PLANNING TASK FORCE FY’06 “ Final Session – Setting the Rates” 12/5/05.
Budgeting at Penn and within Vice Provost for University Life (VPUL) My View: William Turner June,
Five-year Fiscal Sustainability Plan October 2014.
GETS Transformation Kick Off Active Directory and Blackberry Migration Firewall and Network Changes 04/21/
1 10/31/05 NETWORK PLANNING TASK FORCE Information Security.
1. Funding model for telecom services  FTE funding model  Blue Ribbon Committee on IT Excellence Horizontal wiring upgrades 2.
1 NETWORK PLANNING TASK FORCE November 15, 2004 FALL FY 2005 MEETINGS “STRATEGIC DISCUSSIONS”
11/29/20041 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”
1 NETWORK PLANNING TASK FORCE November 01, 2004 FALL FY 2005 MEETINGS “OPERATIONAL DISCUSSIONS”
1 NETWORK PLANNING TASK FORCE August 16, 2004 SUMMER FOCUS GROUP SESSIONS “SETTING THE AGENDA”
1 11/21/05 NETWORK PLANNING TASK FORCE FY’06 Final Strategy Meeting.
Network Planning Task Force Strategy Discussions.
1 NETWORK PLANNING TASK FORCE September 20, 2004 FALL FY 2005 MEETINGS “OPERATIONAL BRIEFING”
UC Davis. Networks that enable The Vision We will create new ways to develop the intellectual and leadership capacity of our graduate, undergraduate,
NPTF Wireless Discussion. 3/3/20032 Agenda Goals Strategy Current status Future plans Challenges Options.
Whitestown: 20 Year Strategic Plan for Municipal Services “The best possible service at the lowest possible cost.”
1 NETWORK PLANNING TASK FORCE FY’06 Network Strategic Discussions 11/7/05.
12/1/20031 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”
Network Planning Task Force Network Strategy Discussions.
Network Planning Task Force Special Spring Session.
A Comprehensive Approach to Budget Planning at a Major Research University David E. Hollowell, Executive Vice President and Treasurer Carol D. Rylee, Director.
1 NETWORK PLANNING TASK FORCE FY’07 “ Setting the Rates” 11/20/06.
Chapter 10 Managing the Delivery of Information Services.
11/17/031 Network Planning Task Force Strategic Discussions.
1 NETWORK PLANNING TASK FORCE “ SUMMER PLANNING SESSION ” 08/21/06.
Internet Business Strategies A strategic view of the various options and connectivity levels available to business through the Internet. Copyright 2011.
1 NETWORK PLANNING TASK FORCE Fall Agenda Setting and Focus Group Planning
FY ‘08 NETWORK PLANNING TASK FORCE Fall Agenda Setting and Discussion
BCNET Security Policies Jens Haeusser Information Security Officer, UBC and Chair, Security Working Group, BCNET Internet2 Joint Techs Vancouver, BC July.
Network Background August Topics  Services  Connected Institutions  Architecture  Operations  Finances/Co-pay  Looking Forward  Services.
Academic Budget Presentation March 4, FY05 University Budget Unit Description NonExempt BudgetExempt Budget Total Budget President's Units 2,121,8942%
1 Faculty Council IT Committee C-13 February 4, /4/2010.
May 15, 2009 Texas A&M University - Corpus Christi Fiscal Forum 1.
Deans, Chairs & Directors Meeting April 30, 2009.
Natick Public Schools Technology Update January 26, 2009 Dennis Roche, CISA Director of Technology.
FY ‘08 NETWORK PLANNING TASK FORCE Strategy Discussions
Happy Valley School District Technology Budget Team A: Paula Fehlinger Natalie Leibensperger Chris Parsell Monica Parsell.
NEKIA Business Development Progress Report Board of Directors Meeting May 7,2003.
Top Issues Facing Information Technology at UAB Sheila M. Sanders UAB Vice President Information Technology February 8, 2007.
IP Network Clearinghouse Solutions ENUM IP-Enabling The Global Telephone Directory Frank Estes Vice President , ext 224
Information Technology Cost Pool Council of Research Associate Deans March 12, 2009.
1 NETWORK PLANNING TASK FORCE “ FY ’06 FALL SESSIONS ” 10/03/05.
NPTF Planning Session 6 April FY ‘10 NPTF Members 2  Robin Beck, ISC  Michael Palladino, ISC (Chair)  Mark Aseltine /Amy Phillips, ISC  Gary.
STRATEGY SESSION SEPTEMBER 15, YEAR SECURITY DISCUSSION 1 NETWORK PLANNING TASK FORCE.
NPTF Strategy Session May FY ‘10 NPTF Members 2  Robin Beck, ISC  Michael Palladino, ISC (Chair)  Mark Aseltine /Amy Phillips, ISC  Gary Delson.
Core IT Assessment Approach Common Solutions Group IT Governance and Funding Workshop January, 2006 Philip Long Yale University.
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
Network design Topic 1 Business goals. Agenda Network life cycle Network design process Business goals Scope Constraints.
FY ‘08 NETWORK PLANNING TASK FORCE Rate Setting
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
12/15/20031 Network Planning Task Force “Consensus Building: Final Rate Setting for FY ‘05”
Missouri Research and Education Network (MOREnet) Filling the Space Between Internet2 and the Internet: The Need for a National K-20 Infrastructure Fall.
Objectives for Training Session Familiarize managers with new process Link planning process to Institutional Effectiveness and budget process Review forms.
NETWORK PLANNING TASK FORCE FY ‘08 Planning Session I 1.
APNIC Update The state of IP address distribution and its impact to business operations Elly Tawhai Senior Internet Resource Analyst/Liaison Officer, Pacific,
TIER IT Inventory CITI Meeting November 6,
Educational Excellence – Phase One Lisa Blazer & Dan Gelo Presenting.
Campus Data Storage & Services Task Force Update IT Pro Forum 9 November 2011.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Creating the Network Design Designing and Supporting Computer Networks – Chapter.
Information Technology (IT) Department
About PennNet Redundant Gigabit Ethernet Core
FY 2014 Budget Review & FY 2015 Budget oUTlook
Responsibility Centered Management (RCM): A New Budget Model
Fy ‘08 NETWORK PLANNING TASK FORCE
Presentation transcript:

1 NETWORK PLANNING TASK FORCE “ SUMMER PLANNING SESSIONS ” 8/01/05

2 Meeting Schedule – FY 2006 ■Summer Focus Groups (2) ■July 18 ■August 01 ■Fall Meetings (6) ■October 03 – Review Current Status/ Operational Discussions/ Establishing the Fall priorities ■October 17 – Strategic Security Discussions (Dave Millar) ■October 31 – Strategic Security Discussions (Dave Millar) ■November 07 – Strategic Discussions ■November 21 – Strategic Discussions ■December 5 – Consensus/Prioritization/Rate Setting

3 NPTF Fall ’05 Members ■ Mary Alice Annecharico / Rod MacNeil, SOM ■ Robin Beck, ISC ■ Chris Bradie/Dave Carrol, Business Services ■ Cathy DiBonaventura, School of Design ■ Geoff Filinuk, ISC ■ Bonnie Gibson, Office of Provost ■ John Keane/ Grover McKenzie, Library ■ John Irwin, GSE ■ Marilyn Jost, ISC ■ Deke Kassabian / Melissa Muth, ISC ■ Doug Berger/ Manuel Pena, Housing and Conference Services ■ Mike Weaver, Budget Mgmt. Analysis ■ Dominic Pasqualino, OACP ■ James Kaylor, CCEB ■ Kayann McDonnell, Law ■ Donna Milici, Nursing ■ Dave Millar, ISC ■ Michael Palladino, ISC (Chair) ■ Dan Shapiro, Dental ■ Mary Spada, VPUL ■ Marilyn Spicer, College Houses ■ Steve Stines / Joseph Shannon, Div. of Finance ■ Andrew Selden, PCBI ■ Ira Winston / Helen Anderson, SEAS, SAS, School of Design ■ Mark Aseltine/ Mike Lazenka, ISC ■ Eric Snyder, Vet School ■ Brian Doherty/John Yates, SAS ■ Richard Cardona, Annenberg ■ Deirdre Woods/ Bob Zarazowski, Wharton

4 FY ’06 NPTF Goals ■ Evaluate various CSF funding models. ■ Hold as many rates flat as possible for FY ’07. ■ Depending on outcome of 100Mbps pilots, lower rate in January ■ Determine new strategic initiatives/directions. ■ Determine which services can be scaled back. ■ Deploy new wireless APs to include capitalization.

5 NPTF Principles Many Penn investments and operations are dependent upon the viability, accessibility and security of the network. ISC maintains close alignment with University academic, research and business strategies. Customers and ISC work as partners when making decisions, insuring flexibility to accommodate business needs and changing technologies. Using a continuous process improvement approach, we seek maximum cost- effectiveness and a high degree of customer satisfaction. Customers and ISC are proactive in identifying strategic directions and emerging technologies and encourage the retirement of obsolete services and systems to insure that we remain competitive with our peers and industry.

6 NPTF Principles (Funding Model)  The costs are visible for data, voice and video services and their associated components, showing a 5-year view of budgets and assumptions. Aggregate service rate increases are targeted at 0-3% maximum yearly, determined in conjunction with the NPTF.  The funding model is rational from both a customer and ISC perspective and is measurable in terms that are meaningful to the customer.  All operating expenses (business continuity, planning, support, security) are included in the model.  The model is demand-based.  The model remains simple in order to minimize overhead costs and to allow for easy budgeting and discussion.

7 Budget Assumptions for FY ‘07 ■ Security concerns continue to be a high priority as various intrusions, compromises,viruses, worms, etc. have reduced Penn’s productivity levels. New monies may be requested for FY ’07. ■ 5 year phase-out of allocated monies ($2.317M) to occur from FY ■ Telecommunications surplus, operating efficiencies and increased costs to offset allocated cost phase out.

8 Budget Assumptions for FY ’07 (Continued) ■ Bandwidth management techniques combined with a good Internet strategy have eased the pressure on developing tiered network connectivity options based on usage. However, this will continue to be explored and evaluated as the need arises. ■ Separate SLAs for College Houses and Greeknet for maintenance and bandwidth exist. ■ The FY2006 budget assumed Next Generation PennNet project funding at $590k/year. Funding source is Telecommunications surplus. TBD for FY ’07 – ‘10

9 Budget Assumptions for FY ’07 (Continued) ■ No rate increases for existing Telecommunications services in FY ’07. Some Video service rate increase in ’07. ■ For FY ‘06 College House students will continue to be billed indirectly as part of housing fees for baseline PennNet and Penn Video Network services. TBD for FY ’07 ■ Building entrance and router equipment are on a four-year replacement cycle. ■ Closet electronics and network servers are on a three-year replacement cycle. ■ Penn will continue to operate MAGPI, the Internet2 gigaPop with primary purpose to help lower Penn’s Internet costs and position for Penn’s likely need in the future for the National Lambda Rail (Internet3?). Preliminary NLR rates will be presented to NPTF this Fall.

10 Budget Assumptions for FY ’07 (Continued) ■ The growth rate in IP addresses from the schools/centers is projected to increase by 1000 per year from FY ’05-’09. TBD for FY ’06 –’10. ■ ISC managed wallplates projected to increase by 1000 new per year from FY ’06-’10 ■ The CSF subsidized approximately 900 wired, public lab connections that have computers attached in FY ’06. TBD for FY ‘07 ■ The CSF subsidized approximately 900 wireless public IP connections in FY’06. TBD for FY ‘07 ■ The NPTF decided to do school-based IP wireless subsidies for FY ’06. TBD for FY ‘07

11 Budget Assumptions for FY ’07 (Continued) ■To retain and recruit appropriate N&T IT staff, 3% compensation has been budgeted from FY ‘06 –‘10. ■In FY2006 a 51.8% overhead rate was projected to cover costs of benefits, rent, training, computers, telephones, etc. TBD for FY ’07. ■The NOC will not be physically staffed (7x24x365) through FY ‘10. It will continue to operate from 6 AM – 11 PM, M-F with the rest of the week covered by technical staff on beepers. ■N&T total expense budget increases from $22.0M in FY ’02 to only $23.7M in FY ’10. (< 1%/year)

12 Potential FY ’06 NPTF Topics Additional LSP troubleshooting skills/tools More comprehensive Remedy reports with top- down (building/school) view. Closer look at Microsoft Exchange Improved communication on security incidents Security should be more proactive Network repairs take too long for non- standard connections (T1s).

13 Potential FY ’06 NPTF Topics Campus-wide intrusion-detection system  Is Arbor a possibility?  Should we focus on more prevention rather than more detection? Authorization  Especially for wireless PennNet  Scan, certify and block capability  Expanded directory services  (Alumni, student groups, etc.) Distribute tools such as PUMA to interested schools/centers LSPs. Student/staff discounted music contract Campus Windows domain

14 Potential FY ’06 NPTF Topics Disaster recovery Data management/backup/archiving Wireless  Authorization  N&T capitalization of APs  Increased speed of (54Mbps) Campus edge firewall  Block NetBIOS  VPN Service (centralized or local?) Expanded PennCommunity/Online Directory Service

15 CUSTOMER FEEDBACK/ DISCUSSIONS