Mary PacherFAA Workshop – Chicago September 16-18, 2003 Comments: Liquid Resin Molding Specifications Guidelines clearly indicate the critical importance.

Slides:



Advertisements
Similar presentations
1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
Advertisements

Extended Assessment Data Entry. Data Entry Use Following administration of the assessment(s) data will be entered into the state’s Extended Assessment.
First Article Inspection Report
Continuous Value Enhancement Process
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 1 1 Disciplined Software Engineering Lecture #7 Software Engineering.
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
September 12 th 2003 Chris Ridgard Material Specifications For Fabric Prepregs Comments on Unofficial Draft Recommendations – August 22 nd Presented.
FAA/NASA Workshop on Key Characteristics for Composite Material Control - Chicago, IL M17 M&P NWG DRR August 6 - 8, 20021/12 Carbon Tape Material Specification.
AT- FAA / NASA WORKSHOP ON KEY CHARACTERISTICS FOR COMPOSITE MATERIAL CONTROL Cirrus Design Industry Review August 6 th, /02.
Review of FAA Guidelines for Fabric Prepreg Material Specification
0 FAA Workshop on Key Characteristics for Composite Material Control September 16 th – 18 th, 2003 Alan J. Norwid Principal Engineer M&P Ext.
Software Testing Using Model Program DESIGN BY HONG NGUYEN & SHAH RAZA Dec 05, 2005.
9/17/2003 1LRM Spec Review LRM Material and Process Spec Review Cindy Cole Certification Manager The Lancair Company.
Sikorsky A United Technologies Company FAA / NASA Workshop, Chicago, IL – August 6-8, 2002 Review of FAA Material Specification Guidelines Document John.
FAA Workshop on Key Characteristics for Advanced Material Control
Guidelines and Recommendations for the Development of a Material Specification for Carbon Fiber Reinforced Liquid Resin Molded Materials Gregg Bogucki.
FAA Workshop on Key Characteristics for Composite Material Control
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Review of Workshop Goals and Accomplishments. Workshop Objectives The objectives of this workshop are to: –Review the results and recommendations of this.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
FAA Specification Meeting Steven Peake FiberCote Industries Waterbury, CT.
FAA/NASA Workshop on Composite Material Control Mark Freisthler Allen Fawcett Rod Osborne August 2002.
FAA/NASA Workshop on Key Characteristic's for Composite Material Control Chicago, IL Cytec Engineered Materials August 6th 2002.
Systems Engineering Management
FAA Workshop, September 2003 Key Characteristics For Advanced Material Control Fabric Prepreg Material Control Industry Review.
Review of Liquid Resin Molding Specifications FAA Workshop September 2003 Scott Reeve National Composite Center.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
FAA/NASA Meeting on Industry Composite Specifications August 2002 FAA Report on Proposed Industry Prepreg Specifications Ric Abbott Abbott Aerospace Composites.
Annual Self Assessment Workshop for Employees
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
Case Study on “Conflict of Interest” Reference: Feasibility Study (adopted from NSPE Case No. 88-1)
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
DOT/FAA/AR- 02/109 Guidelines and Recommended Criteria for the Development of a Material Specification For Carbon Fiber/Epoxy Unidirectional Prepregs Overview.
Disciplined Software Engineering Lecture #7 Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department.
Lecture 7: Requirements Engineering
(Spring 2015) Instructor: Craig Duckett Lecture 10: Tuesday, May 12, 2015 Mere Mortals Chap. 7 Summary, Team Work Time 1.
Some Thoughts on Shared Databases Stephen Ward SW Composites Taos, NM.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 7 1 Design and Code Reviews - Overview What are design and code.
6/6/01 1 Copyright 2001 by Ralph R. Young Effective Requirements Practices Designed to improve individual, project, and organizational effectiveness. Based.
WHY DO WE DO THIS? WHY DO WE DO THIS? WHAT WILL WE DO? WHAT WILL WE DO? WHAT WILL WE ACHIEVE? WHAT WILL WE ACHIEVE? Quality Consultants NAME OWNER AND.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
INEN261: Chapter # 12 Project Auditing Presented by: Jasim Alnahas.
FAA Composite Safety & Certification Initiatives Presented at 9/16/02 FAA Workshop (Chicago, IL) Overview – Background – Technical thrust areas – Major.
Comments on Fabric Material Procurement Document (9/17/2003): statement of purpose - guidelines not requirements … see J. Tomblin notes what type of parts.
Brainstorm Sessions from 9/17/03 (PM) 1 Comments on LRM Process Document List of references missing More info (or examples) on SPC (e.g., preform gap)
OSHA Safety and Health Program Management Guidelines
Reporting and compliance checking on RBMP in 2010 WFD Reporting Working Group D on Reporting Brussels, 17/18 October 2006.
2 nd FAA Meeting on Composite Material Control Sept 2003 Proposed Material Specifications for LRM Ric Abbott Abbott Aerospace Composites Wichita, Kansas.
SQA COMPONENTS IN THE PROJECT LIFE CYCLE C HAPTER 8 Dr. Ahmad F. Shubita.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Standard Design Process Overview
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Royal Lovingfoss John Tomblin Rachael Andrulonis Jeff Gilchrist
Introduction Edited by Enas Naffar using the following textbooks: - A concise introduction to Software Engineering - Software Engineering for students-
(Winter 2017) Instructor: Craig Duckett
Supply Chain Management Principles
GREENHOUSE GAS EMISSIONS INVENTORY
Flooding Walkdown Guidance
Introduction Edited by Enas Naffar using the following textbooks: - A concise introduction to Software Engineering - Software Engineering for students-
MRL Assessment Thread A Evaluation
Human Complexity of Software
Document 3:12 (2011–2012) Published 5/31/2012
RISK REDUCTION PROCESS
Software Reviews.
Presentation transcript:

Mary PacherFAA Workshop – Chicago September 16-18, 2003 Comments: Liquid Resin Molding Specifications Guidelines clearly indicate the critical importance of controlling composite materials and processes to achieve consistent repeatable structure with known properties Documents highlight the issues involved in controlling liquid resin molding Emphasis on real controls, particularly SPC & PCDs Progress in standardization of test methods Good specification architecture for controlling fiber, fabric, preform, resin, & cured composite properties.

Mary PacherFAA Workshop – Chicago September 16-18, 2003 Concerns: Liquid Resin Molding Specifications Quantity of testing recommended, particularly on an ongoing basis There’s a basic difference between the following: –Understand & control Materials & Processes with limited verification testing –Extensive end-item testing to verify consistent properties –Understand & control M&P, but also do extensive end-item testing to verify consistent properties Cost increases due to one material / one spec approach Push for 2-sided strength limits - SPC can accomplish the same goals at lower cost

Mary PacherFAA Workshop – Chicago September 16-18, 2003 Concerns: Liquid Resin Molding Specifications Are the right organizations responsible for testing? –Do resin suppliers have the resources and expertise to take responsibility for all the items the guidelines assign them? –Many of the “part producer” tasks seem to be end-user or OEM responsibilities Equivalency baseline database testing has the implied purpose of recalculating allowables: “a larger database will result thereby providing the potential for higher allowables” –Also the potential for LOWER allowables –As you pool data from various sources, you tend to increase the spread.

Mary PacherFAA Workshop – Chicago September 16-18, 2003 Concerns: Liquid Resin Molding Specifications There is no industry consensus on preferred LRM processes. Different processes produce somewhat different properties. Different organizations may not want to publish their “latest & greatest” LRM process in an industry spec. Potential for delays as industry committees review specs & data and resolve issues dependent on engineering judgment such as equivalency Extent of equivalency testing required for each fabrication site. Processor qual should rarely require destructive test. Destructive inspection is more common, but should not be “typical” given the use of part families.

Mary PacherFAA Workshop – Chicago September 16-18, 2003 Concerns: Liquid Resin Molding Specifications While it is necessary to control potential defects, –Some are very difficult to create on demand to measure their effect –It is not feasible to eliminate use of all materials not detectable via NDI. In some cases, a robust control procedure is a better option. These recommendations show a significant increase in FAA involvement in (vs. oversight of) these materials and processes. –Does the FAA have the manpower to accomplish these additional duties without adverse effects on cost & schedule? –Or are the FAA references meant to include DER & DMIR activity?

Mary PacherFAA Workshop – Chicago September 16-18, 2003 Summary: Liquid Resin Molding Specifications Guidelines contain much good information about what needs to be controlled, with excellent emphasis on understanding & controlling the materials and processes (SPC, PCDs, etc.) There’s significant fear that guidelines become or are treated as requirements – and the amount of testing recommended imposes some significant costs There’s a basic disconnect between the one material / one spec approach (and related 2-sided limits) and the Boeing specification + QPL approach. How much testing is enough? Who should be responsible for testing?