Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan.

Slides:



Advertisements
Similar presentations
Team Members: Jon DixonMatt SacksDarrin BeamNathan Murray
Advertisements

Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
FEA of Vehicle Front Stabilizer Bar & Airfoil Design (Final Project) Name: Antonio Sevilla & Sanh Si Course: ME 272 FEA Professor: Jose Granda Date:
A World of Solutions TM Falgout Canal Floodgate Structure Unbalanced Forces and Proposed Solutions October 2013.
Hydraulic Cylinders Actuators
Test to Failure of 3/8-Inch Tube Ferrule Connections in an Effort to Determine the Shear Strength of a Varying Number of Threads Engaged P.O. Box
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Acoustic Emission Test Platform Customers: Exxon Mobil Department of Energy Team: Dan Edwards Terry Lott John Ludes Joseph Oagaro Consultant: Philip James.
Moonbuggy Rear Suspension Analysis ME450: Computer-Aided Engineering Analysis Department of Mechanical Engineering, IUPUI Instructor: Dr. Koshrow Nematollahi.
Bending Moments A bending moment exists in a structural element when an external force is applied to the element so that the element bends (or wishes to.
PACE Collaborative Project: Emerging Market Vehicle Transmission Design Team member: Anthony Smith Kevin Scott Decorian Harris Jacque Thornton Advisor:
GPS Vehicle Tracking/Payload Release System For Small UAV Project Team
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
2012 Formula SAE Outboard Suspension
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
2 Problem Definition Background: Boeing’s Auburn Plant manufactures airplane wing spars which are the primary structural component that runs the length.
Screws, Fasteners, and the Design of Nonpermanent Joints
S. Mandayam/ECE Dept./Rowan University Development of an Acoustic Emission Test Platform with a Biaxial Stress Loading System Joseph Oagaro, Shreekanth.
Design of Beams Engineering Design vs. Analysis
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Hydraulic Hybrid Vehicle Members: Kevin Alexander Phillip Bacon Tyler Degen Brandon Diegel Nick Hemenway Luke Jackson Christian L’Orange Grant Mattive.
2.72 Group 5 Design Review 1 2/23/08 Eric Correll, Josh Gafford, Andrew Marecki, Stephen Powelson, Johannes Schneider, Sam Weiss.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
May 16, 2003 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Joseph Clark Casey Poeth Josselin Legeay.
CTC / MTC 222 Strength of Materials
Static and Fatigue Bolt Design
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
MSMA LATERAL LOADING DEVICE ENGINEERING ANALYSIS Presented by: Matthew Batten, Cody Burbank, Jonathan McCurdy, Thaddeus Grudniewksi, & Joy Weber November.
CASE STUDY – Combined Loading Drill bit isolators for underground mining – all metal components and elastomer must be safe! Design requirement: 8,000 lb.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Mechanical Engineering Analysis. Material Selection Process WoodStainless Steel HDPEAluminumPTFE Cost Machinability Strength Durability
Team Wrecked Week 9 Deliverables: Engineering Analysis.
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
MECN 4600 Inter - Bayamon Lecture Mechanical Measurement and Instrumentation MECN 4600 Professor: Dr. Omar E. Meza Castillo
MAE 343-Intermediate Mechanics of Materials QUIZ No.1 - Thursday, Aug. 26, 2004 List three possible failure modes of a machine element (5points) List the.
Engineering 309: Machine Design I Instructor: Dr. Min Lu Presented by: Mike Kraft Thanh Nguyen.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
NSTXU-CALC TF Flex Joint and TF Bundle Stub
Members: Daniel Houseward, Elijah Jentzen, Scott Mehlberg, Shane Muller, Joseph Flikweert.
T HE CRUSHED E XPERIMENT By: Carlos Sanabria Justin Roose Phillip Munday.
Design Stress & Fatigue
DESIGN FOR FATIGUE STRENGTH
1 Class #2.1 Civil Engineering Materials – CIVE 2110 Strength of Materials Mechanical Properties of Ductile Materials Fall 2010 Dr. Gupta Dr. Pickett.
Fatigue of Materials. Fatigue Definition: Damage accumulated through the application of repeated stress cycles Variable amplitude loadings cause different.
High Speed Vessel Fendering System Design Presenters: Cameron Clark Dave Maharaj Okason Morrison Jean-Pierre Njante Alexandra Ortiz Advisor: Prof. Sadegh.
Innovative Rocking Chair Design with Electro-Magnetically Induced Rocking Motion Jorge Alvarado-Colón Yocli Comas-Torres Andrés Cruz-Vélez Tamarys Heredia-Arroyo.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Team INASAD Members: Jose Medina Joseph Leone Andrew Merk Alex Sanders Michael Fox.
1 Child Passenger Safety Seat Team Members: Erik Bieging, Aman Ghotra & Karim Mahamud Client: Tom Brazelton, MD, MPH Dept. of Pediatrics – UW Hospital.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Chapter 6: Hydraulic Cylinders and Cylinder Cushioning
D-Lab 2: Spindle March 17th 2008.
CASE STUDY – Combined Loading
© Copyright, HQT-SV Control System
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
1.6 Allowable Stress Allowable Load < Failure Load
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
Capstone Team Project title
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
Anti-Rollback & Brake Assist
Mechanics of Materials Engr 350 – Lecture 39 What’s On the Final Exam?
Table of contents 1. Introduction – your product, sketch, description, functionality, variants 2. Bill of materials 3. Manufacturing process- block diagram.
Transverse Shear Objective:
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan (Project Manager) (Project Manager) Janice Wisely Casey Poeth Josselin Legeay Joseph Clark Advisor: Dr. Debartolo Dr. Debartolo

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Agenda Background - Eric Sullivan Background - Eric Sullivan Limitations - Eric Sullivan Limitations - Eric Sullivan –Customer Requirements- Janice Wisely –Timeline - Janice Wisely Concept Development - Eric Sullivan Concept Development - Eric Sullivan Analysis Analysis –Applied Load- Casey Poeth –Component Breakdown- Josselin Legeay/Joseph Clark Conclusion- Joseph Clark Conclusion- Joseph Clark

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 The Product Dual Cylinder Hydraulic Actuator Dual Cylinder Hydraulic Actuator Materials Materials Pressure 3000 psi Pressure 3000 psi Temperature gradients Temperature gradients Age Age

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Project mission Customer: NCRRR and the NAVY Customer: NCRRR and the NAVY Create an engineering model Create an engineering model Re-create Failure Re-create Failure Suggest new materials Suggest new materials

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Limitations Budget? Budget? Instron ® fatigue tester Instron ® fatigue tester –22,000lbf max –grippers Customer Requirements Customer Requirements Time Time

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Customer Requirements House of Quality

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Dependency Chart Timeline

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 PERT Diagram B C F H G I K E2 E1 D2 D1 A J 4wks 3wks 1week 3wks 1week 1day 1week 4wks 3wks 2wks 1week 3wks 1week 2wks Timeline

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 GANTT Chart Timeline

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 The Model Scaled down Scaled down Steel End Cap Steel End Cap Locking Ring Locking Ring Aluminum Housing Aluminum Housing Stiffening Ridge Stiffening Ridge

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Maximum Working Force

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Pre-loading Force Pre-loading force greater than maximum working force. Pre-loading force greater than maximum working force.

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Force Flow Force from hydraulic pressure flows from actuator housing walls through threads and into end cap. Force from hydraulic pressure flows from actuator housing walls through threads and into end cap.

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Threads-No Load Typical thread configuration with no applied load. Typical thread configuration with no applied load.

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Threads-With Preload Thread-Pre Load Exceeded

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Shear Pin Hand Calculations based on Fig. 8 Hand Calculations based on Fig. 8 –max  1 of 73.3 ksi Using FEA max  1 of 75.5 ksi Using FEA max  1 of 75.5 ksi Max  p = 75.5 ksi T T/2

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Clevis Hand calculations Hand calculations –  1 =27 ksi FEA Analysis FEA Analysis –  1 = 11.7 ksi Manufacturer will build to our specifications Manufacturer will build to our specifications Max  p = 11.7 ksi

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Hand calculations Hand calculations –  1 of 7.7 ksi FEA analysis -  1 of 12.2 ksi FEA analysis -  1 of 12.2 ksi Ro Ri a b Max  p = 12.2 ksiHousing

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 End Plug Hand Calculation w/o Stress Concentration Hand Calculation w/o Stress Concentration –Average  1 of 22.1 ksi FEA analysis -  1 of 36.8 ksi FEA analysis -  1 of 36.8 ksi r R Max sp = 36.8 ksi

Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 Project Status & Future Plans Parts Being Made Parts Being Made –1 st week of spring Pin & Clevis designed by Instron ® Pin & Clevis designed by Instron ® Development Process Development Testing 6 parts Testing 6 parts Material Change? Material Change?