1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.

Slides:



Advertisements
Similar presentations
Introduction to Pneumatic Components Build a Working Pneumatic Circuit
Advertisements

Getting Started with the EELD601 After you remove your EELD601 from the box, check to make sure you have all accessories shown below. Click here for next.
Getting Started with the EVAPro After you remove your EVAPro from the box, check to make sure you have all accessories shown below. Click here for next.
Dennis Fire Appliances Operations & use. PTO Step 1 Move slide cover towards the drivers seat to lock out the gearbox Step 2 Select drive on the gear.
AV Operating Instructions
Left Side Discharge Pressure Regulator
College of Education 103 Conference Room The Multimedia Podium.
GI/EMME series TRAining CEntre Burner setting. TRAining CEntre Setting sequence: OIL PRESSURE SETTING : Pump and pressure regulator AIR QUANTITY SETTING.
Using the Oxy-Acetylene Cutting Torch Alisa Colli AgEd 410 Fall 1999.
23-Aug-06 mgbersch Plasma Cleaner Instructions for Use.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
CAFS On-Line Orientation
Getting Started with the EVAPro ™ After you remove your EVAPro from the box, check to make sure you have all accessories shown below. Click here for next.
ELCT 301 Dr. Enrico Santi Equipment Testing & Troubleshooting Procedure © Prepared by: Rizwan Muzaffar.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Fundamentals Lecture 5 G.J. Mankey
Automotive Fuel and Emissions Control Systems 3/e By James D. Halderman Copyright © 2012, 2009, 2006 Pearson Education, Inc., Upper Saddle River, NJ
Introducing the Canon Powershot 410 Digital Still Camera Click to advance to the next page.
OXYTRONIC 600 CONTINOUS FLOW NITROX SYSTEM
Dennis Sabre Fire Appliances
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
Varian 3118 Thermal Evaporation System
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
Operation of the S4700 FESEM
Hydronic Mechanical Controls
Imago LEAP Recovery Procedure for Cryo-Compressor and Cold Finger The LEAP is equipped with a Uninterrupted Power Supply (UPS). Located in the 19 inch.
ELECTRONIC FUEL INJECTION COMPONENTS
Abs.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Solar Cell conductive grid and back contact
Some results of vacuum stand investigation.. 1. Restoration of turbopump inlet valve V1 tightness The inlet turbopump valve of the first pump station.
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
EVAPORATIVE EMISSION CONTROL SYSTEMS
Cressington 208 HR Sputter coater
Pneumatic and hydraulic actuation system (cont.)
By: Elizabeth Campbell.  Fluorescence is a useful tool for chemists to determine what wavelength of light a compound emits.  A Fluorescence Spectrometer.
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Systems Lecture 6 G.J. Mankey
1 HVACR318 – Refrigeration II Diagrams. 2 Hooking up Gauges on Suction and Discharge Lines.
BioRad Sputter Coater  Instructions for gold coating a SEM sample.  NO, it’s not your eyes. This image is out of focus.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
Setting up your computer’s microphone Begin by double clicking on the volume icon within the task bar.
Diagnosis and Troubleshooting of Automotive Electrical, Electronic, and Computer Systems, Fifth Edition By James D. Halderman © 2010 Pearson Higher Education,
Dielectric Strength of Superfluid Helium Under Pressure Small Pressure-Controlled Cryostat Overview Measurement Cycle Possible Breakdown Mechanisms Dielectric.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
Advanced Engine Performance Diagnosis, Fourth Edition James D. Halderman Copyright ©2009 by Pearson Higher Education, Inc. Upper Saddle River, New Jersey.
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
1.  The primary output device in a graphics system is a video monitor. These monitors are based on Cathode Ray Tube (CRT) design.  CRT is a vacuum tube/electron.
Casne.ncl.ac.uk Taking care of the CrumbleBot Please do NOT stress the robot's motors 1.Do NOT push the robot 2.Do NOT hold the.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
The Camera -Using a 35mm SLR Camera - An Introduction to.
1 Before degassing RGA head After degassing RGA head RGA scans of test dewar December 23, 2005 (PR and SP) Ion Gauge readings : Vacuum (with RGA off) before.
SAFETY OPERATING PROCEDURES
For system diagrams and component identification
R1 Fundamentals of Refrigeration
Introduction and Goals
IN-VEHICLE ENGINE SERVICE
SAES Project: Combination of NEG module and sputter ion pump
EVAPORATIVE EMISSION CONTROL SYSTEMS
R1 Fundamentals of Refrigeration
Wiring the Light and Relay
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Instructions: Adding refrigerant fluid to system
2. ATP INITIALIZATION PLACE ATP SWITCH TO “1” OR “NORMAL” POSITION A
Basic Operational Instructions
Presentation transcript:

1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum to atmosphere Three major steps:

Mechanical pump & Turbo pump Mechanical pump Turbo pump Turbo pump controller Fig. 1 (1)Connect the flexible stainless steel hose associated with the turbo pump (Fig. 1) to the pump port of RHEED chamber (Fig. 2). (2)Turn on the mechanical pump. (Fig. 1). (3) After about 20 min, when the pressure from the thermal couple pressure gauge of the mechanical pump is lower than 100 milli Torr, turn on the turbo pump.

Gate valve turning knob Right angle valve Nitrogen gas inlet Pump port Fig. 2 Manipulator

Ion gauge controller Fig. 3 (4) After about min, when the pressure of the RHEED chamber is lower than Torr, turn on the ion gauge associated with the chamber (Fig. 3). Sublimation pump controller Fig. 4

(5) When the pressure is in the Lower range of Torr, slowly open the gate valve. Turn on the ion pump(Fig. 5). If the pressure goes up, turn off the ion pump and wait the pressure goes down to previous lever and turn on the ion pump again. “Flash” the ion pump several times until the pressure shown by ion gauge does not go up. Then turn on the ion pump, close the “right angle valve”. controller Fig. 5 Ion pump controller Sublimation pump could be used accompany with ion pump to achieve an optimal low pressure: Slowly turn up the current in the sublimation pump (Fig. 4) from 0 amp to 40 amp under “continuous”. Set current at “40 amp”, and then switch the knob to “cycle”.

(6) Vent the turbo pump. Connect the nitrogen gas tube to the venting port of the turbo pump. Open the venting valve slowly and keep the pressure shown by couple pressure gauge below 100 mili torr. The rotating speed of turbo pump will gradually slow down. Then turn off the turbo pump. When the pressure shown by couple pressure gauge increases to atmosphere pressure, turn off the mechanical pump. Tips: During the pumping process, if the pressure indicated by ion gauge keeps at LOW×10 -5 torr, it may be due to the leak of the gate valve. In this case, slowly open the gate valve, an increase of pressure will be observed. Then wait until the pressure goes to the Lower range of Torr, and follow step (5).

Requirement of using RHEED: The pressure of the RHEED chamber is lower than high range of Torr (low range of Torr may be alright); turn off the ion gauge because the W filament generates light; turn off the sublimation pump because its Ti filament also generates light.

(1) Start camera (the black one near the computer monitor by pushing the button on the CCD camera controller. (Fig. 6) (2) Turn on the Computer: (program) Fig. 6 CCD camera controller

(3) Turn on the RHEED gun switch on the back of the power supply. See Fig. 7. Grid voltage RHEED gun switch Fig. 7

(4) Turn on the electron gun supply on the rack. See Fig. 8. (5) Turn on the HV (on the panel of electron gun supply). See figure 8. Electron gun power supply Fig. 8

(6) Turn on the grid voltage. See Fig. 7. (7) Change the “HV” from 0 V to 9 kV (Slowly, the button shows “6/05”) (8) Turn on the filament (on the panel of electron gun supply) (9) Turn on the “V Limit” (the button shows “7/1”) (10) Increase the “I Limit” to “2 A” (the button shows “5/1”) Emission current is around 0.2 mA. (11) Close all the room light, open the shutter (locates inside the chamber and in front of the Phosphorous screen)

(12) Adjust the RHEED pattern so that it appears on the screen using the two-screw (x and y deflections) buttons on the right side of the panel. (13) Computer program (See appendix). (14) To shut down the system, do the reverse process from Step 10 to Step 3, then turn off the computer and close the CCD camera.

(1) Turn off the ion pump (gate valve is slightly leaking). (2) Make sure that the Ti sublimation pump is off. (3) Turn off the ion gauge and any instrument in the chamber that has hot filament. (4) Close the gate valve in the RHEED chamber. (5) Connect the Tygon tube for dry nitrogen gas to the nitrogen inlet port of the RHEED chamber. See Fig. 2. (6) Open the valve of nitrogen gas cylinder slowly, and use low pressure (close to atmosphere pressure). (7) Turn the “right angle valve” at counter-clock direction slowly, and stop when hearing a hissing sound from the chamber. (8) Open the chamber from the top of RHEED chamber where the manipulator is located on a 6 inch port.

Appendix : Computer program for taking RHEED images (1) Type “cd prog”, Type “cd Apps”, Type “./DataAcq”, Program Starts. (2) On the toolbar of the program, go to “View”, open “Image sorter”. (3) Go to “EFRHEED”, click “Buffer Scan”. (4)In the window of “EFRHEED Buffer Scan”, Gate Time is usually set as 7000(ms) or longer. Then click “OK”. (5)Double click the buffer in the “image sorter” to see the RHEED image. (6)To save the image, go to “Experiment”, go to “Save”, click “Buffer” to save one image or “Multiple buffers” to save several images.

(7) To analyze an image, go to “1d-2d”, go to “Radial profile”. Then in the RHEED image, select the region to measure. To check the radial profile data, go to “View”, go to “Line data sorter” and double click the corresponding buffer. (8) To save Radial profile data, go to “Save”, click “Line buffer” to save one set of data or “Multiple line buffers” to save several sets of data.