GLAST LAT ProjectOnline Peer Review – July 21, 2004 4.1.9 - Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

Main Menu F3 Exit = Press F3 to exit this screen. Commonly Use Keys: F4 Prompt = Position cursor in front of ‘?’ location and press F4 to display a list.
DNR-322L & DNR-326.
ALEPH version 21 Task Manager. New Task Manager Interface Admin tab 2 The Task Manager interface has been removed from the ALEPH menu, and is now found.
Unauthorized Reproduction Prohibited SkyPoint Alarm Integration Add-On Using OnGuard Alarms to create events in SkyPoint Also called ‘SkyPoint V0’ CR4400.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectOnline EM Experience – October 23, 2003 R. Claus1 Online EM Experience Online Operations R. Claus, J. Panetta, S. Tuvi.
GLAST LAT Project CCB Review – June 28 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 28 th, 2005 E-Logbook.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project CCB Review – June 2 nd, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review June 2 nd, 2005 E-Logbook.
GLAST LAT Project CCB Review – May 17 th, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review May 17 st, 2005 E-Logbook.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
SLAC – GLAST LAT I&T/Online - 10/29/02 The path to the EM Test and beyond Alicia T. Kavelaars Schema & Configuration: GUIs / Displays The GLAT GUI monitoring.
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
Extensible Traffic Control Simulator Will Fidrych Milestone 2 October 25 th, 2010.
Alarms and Events Processing Group No. 2 Project Guide: Prof. N.D.R.Sarma.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Sharepoint Portal Server Basics. Introduction Sharepoint server belongs to Microsoft family of servers Integrated suite of server capabilities Hosted.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Chapter 17: Watching Your System BAI617. Chapter Topics Working With Event Viewer Performance Monitor Resource Monitor.
This presentation will guide you though the initial stages of installation, through to producing your first report Click your mouse to advance the presentation.
Overview of SQL Server Alka Arora.
Creating Data Marts from COBOL Files (ISAM to RDBMS)
April, 2013 Configuration Logging Project Excalibur Miho Hoshino, WW Support Readiness.
By: Paul Hill Technology Coordinator Gwinn Area Community Schools.
Using the SAS® Information Delivery Portal
Converting COBOL Data to SQL Data: GDT-ETL Part 1.
TEAM Basic TotalElectrostatic ManagementAwareness&
6 th Annual Focus Users’ Conference Manage Integrations Presented by: Mike Morris.
Duty Log and Chat Setup SSG Frese, Jerome S. Sensor Manager Cell 12 MDD.
The 1:1 meeting scheduler that runs itself The 1:1 meeting scheduler that runs itself.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.2 Visualization Tools 1 Gamma-ray Large Area Space Telescope GLAST.
To run and upload the file go to (DTI) Software/Display Adv/Reports/Ad List for Coordinator. From “Load Request” select “Insert Client Upload”, enter the.
NetNumen T31 Common Operations. Objectives Master Basic Configurations of T31 Master Common Operations of T31.
3 Copyright © 2004, Oracle. All rights reserved. Working in the Forms Developer Environment.
7 February 2008Dietrich Beck A LabVIEW Interface to ELOG ELOG Possible solution paths Status Integration into – CS ? – Domain Management System?
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
9 Copyright © 2009, Oracle. All rights reserved. Deploying and Reporting on ETL Jobs.
Information Management System “Institutions Module" Information Management System “Institutions Module" The System management module is an integrated part.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Institute for the Protection and Security of the Citizen HAZAS – Hazard Assessment ECCAIRS Technical Course Provided by the Joint Research Centre - Ispra.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Integrated ISO ILL for staff users Borrowing requests – part two Yoel Kortick 2007.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
Wednesday NI Vision Sessions
Data Visualization with Tableau
Working in the Forms Developer Environment
CCS Engineering Tools The tools are used help development and debugging of VLT SW control applications This presentation will provide a general view of.
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
GLAST LAT System Engineering
Requirements Analysis Document Presentation
Presentation transcript:

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness Review Online Peer Review July 21, 2004 Graphical User Interfaces Alicia T. Kavelaars I&T Online SLAC Gamma-ray Large Area Space Telescope

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 2 Agenda Describe work done by I&T Online on Graphical User Interfaces GUIs we will cover: –Run Control: Message Logger Environmental Monitor Register Browser File Browser Preferences –GLAST Online Single Event Display (GOSED) TKR, CAL, ACD Display Top View Display Data Display –E-logbook: User entry Shift entry Connector Mate/Demate Component Installation Record Graphical User Interfaces drive the flow of information and optimize the efficiency of the user’s interaction with the experiment

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 3 Run Control Main Setup –A framework and user interface for subsystems to conduct testing and data collection. –Global applications –Power Up controls for existing nodes in schema –Subsystem customized tabs

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 4 Run Control Message Logger Pic of Message Logger here –Reports Run Control logging messages

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 5 Run Control –Complies with: - LAT-TD The Tower Electronics Module (TEM) - LAT-TD The ACD Electronics Module (AEM) –Displays and plots user selected environmental quantities –Subsystem selectable Environmental Monitor

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 6 Run Control –Loads a browse-enabled schema from XML file. –Displays register information from selected node in the schema as well as parent nodes. –Tab is organized by subsystem. Register Browser –Browse active registers loaded on run schema

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 7 Run Control File Browser – Path can be customized in Preferences window – Find files created during run

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 8 Run Control Preferences ( Disabled during I&T testing) – System characteristics – Users – Run conditions – Data handling –Paths Customize:

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 9 GOSED Main Setup –Displays single events at a time, controls allow automatic update with selectable refresh rate –Complies with LAT-TD LAT Coordinate System –Allows tower selection –Monitors real time event taking –Allows subsystem selection in a customized setup

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 10 E-logbook Main Display –Smart way of keeping a lab logbook –Standalone database uploads to online oracle database –User can add data from remote machines –Critical entries are password protected

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 11 E-logbook New User –Creates entry with Name, Group, Initials, Username and Password –Delete and edit capability under password protection –Allows to enter or modify users in the database interactively, during real time operations

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 12 E-logbook Shift Logbook –Select date and time of shift –Enter Shift Note –Enter Shifters, password protected –Enter Activities, Problems or Other Classified by Subsystem Saved Date of modification –Displays run information actively generated by Run Control via run report –Logbook of lab tests and operations organized by date and time of shift

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 13 E-logbook Shift Logbook

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 14 E-logbook Connector Mate/Demate –Logbook of connector mate/demate activities –Enter new record User entry is password protected –Display connector mate/demate records –Select connector to mate/demate

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 15 E-logbook Component Installation Record –Creates an Installation Record for every hardware component Select component to add Installation Record –Enter new record User entry is password protected –Displays all component installation records –Select component to add Installation Record

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 16 GUIs Questions?

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 17 Run Control Message Logger Pic of Message Logger here –Reports Run Control logging messages. –Filters by message type. –Active run or passive file reading enabled. –Printable.

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 18 Run Control Preferences – System characteristics – Users – Run conditions – Data handling –Paths Customize:

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 19 GOSED Main Setup –Docking system to customize subsystem display ACD CAL TKR TWR Data

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 20 GOSED TKR Display –Complies with LAT-TD LAT Coordinate System –Event Data displayed on TKR tab –Hit data show in corresponding tower projection

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 21 GOSED CAL Display –Displayed by Energy color scale –Event Data displayed on CAL tab –Pedestal substraction (average values) - in progress –Filtered by range –Can show events by energy counts or MeVs – in progress –Complies with LAT-TD LAT Coordinate System

GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 22 GOSED ACD Display –AEM PHA A value paints tile’s upper half according to color scale –AEM PHA B value paints tile’s lower half according to color scale –GEM contribution paints tile’s rim in red