GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Instrument 1 Summary of Progress  Completed TVAC with no additional reboots  Ran refresh rate test showing that the refresh rate was not an.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project July 12, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
Configuration. Mirjana Stojanovic Process of loading bitstream of a design into the configuration memory. Bitstream is the transmission.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review LAT Requirement Verification Presentation 5 of 12 GLAST Large Area Telescope Gamma-ray Large Area.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
November 27, 2002 RMU-CPU Interface - Version 1.8 RMU - CPU Interface.
1-1 Embedded Network Interface (ENI) API Concepts Shared RAM vs. FIFO modes ENI API’s.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ACD G3 Talks - 1 March, Gamma-ray Large Area Space Telescope GLAST Large Area Telescope GASU Based Trigger Systems Jim Panetta.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
TTCrx Issues M.Matveev Rice University December 17, 2009.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectGSFC Monthly, 30 March 2006 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering LAT Quality Assurance Pat Hascall.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST LAT Project5 April 2006 LAT System EngineeringLAT Verification Process GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST LAT System Engineering
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering Joe Cullinan Quality Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 2 LAT Test Status FSW upload/regression test –FSW regression testing completed successfully CPT Status –Completed over the weekend –ACD power up (charts follow) –Two orbit test Hampered by adapting to B1.0.1 and operator errors –Timing test A side demonstrated performance with GPS locked and unlocked (combining both runs) B side not demonstrated successfully

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 3 CPT Flag Status 29 flags were LAT related –6 for one time executions –2 for commanding issues –3 for side effects of fast clock due to SC configuration (including ACD FREE power up) –3 for operator errors –9 for script/config errors –3 to change order of operations or repeat tests –2 for unexpected VCHP feed state 7 of the 29 are closed as of GD status sheet dated 7/30 No significant LAT flags that would hold completion of the CPT One of the commanding errors was a dropped command, always a concern

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 4 Problem w/ Configuration 3 ACD power up On 7/27/07, during power up in Configuration 3, the ACD 3.3V current was above the limit –Additional veto drivers on all FREEs were enabled (a benign state) –This is the default power up state of the FREE boards. During the power up sequence, FSW explicitly disables both veto drivers. Why were the veto drivers left enabled? –FSW power up sequence: 1.ACD FREE card is powered (both veto drivers enabled) 2.Delay one second 1 sec based on CPU clock ticks calibrated to PPS sent by SC The purpose of this delay is to wait for the 1 sec burst of low frequency clock ticks sent by the GASU to the FREE during power up initialization. The duration of this burst is set by the frequency of the LAT clock (40 million ticks of the LAT clock oscillator) 3.Look-at-me command is sent to FREE to set up the communications fabric 4.Register on FREE is written to disable both sets of veto drivers –Silence of the LAMs: if the LAM is sent to the FREE before the 1 sec burst from the GASU has ended, it is ignored by the FREE

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 5 Problem w/ Config 3 ACD power up (2) LRA was used to issue LAM to FREE boards and continue with CPT in configuration 3 while the problem was debugged offline Source of the problem was an ~880 ppm shift in the UDL PPS output period, possibly related to the sequence of commands issued to revert to normal operations at the end of the “unlocked” muon telescope run. –To “unlock” the GPS, GD switched the UDL into ground override mode If GD disabled the Viceroy while the UDL was still in manual override, then some bad samples of the Viceroy PPS period may be used to seed the input of the 100- second averaging computation prior to the deassertion of GPS_VALID After manual override is disabled, the UDL reverts to using the 100-second average (because the Viceroy is already inactive) and the average is skewed because of the bad samples. –The error is probably procedural: The Viceroy was shut down before disabling the ground override rather than after The ACD power up problem was duplicated on the Testbed by artificially decreasing PPS period FSW-967 created to increase delay between the power up and the LAM in FSW from 1.0 sec to 1.5 sec in order to take into account the maximum variations in the PPS clock and in the LAT clock period over the course of its lifetime –Pending approval by project CCB

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 6 Problem w/ Config 3 ACD power up (3) Evidence for 880 ppm shift in PPS: LAT counts and records the number of ticks of its 20 MHz clock between successive PPS pulses The PPS pulse is short by 17,580 ticks or ~880  s

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 7 NCR Summary Status Closure Plan DefinitionCount Work continuing QARCND or other issue transferred to a QAR9

GLAST LAT Project Aug 1, 2007 NCRs and Waivers 8 LAT Level Verification Status Progress this month –All 458 VPs are Final –410 of 411 VPs planned for execution have been approved by GSFC 1 VP conditionally approved pending release of the EMI Test Report 1 SRD VP (Background Rejection) in work by GSFC Status –VCRM version 27 released –All deferred GRB reqts will be sold post FSW B1.0 installation