SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.

Slides:



Advertisements
Similar presentations
R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
Advertisements

Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
ILC R&D at SCIPP: Progress Report De-scoped ($97.5K) Proposal Activities Radiation Hardness for BeamCal sensors (new; with SLAC) KPiX/Double Metal Performance.
Testbeams for Tracking Prototypes Two categories: TPC/Gaseous tracking – please chime in Solid-state (silicon  strip) tracking – will present some issues.
SUSY studies at UCSC Bruce Schumm UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
SCIPP R&D on the International Linear Collider Detector SCIPP Review May 18, 2006 Presenter: Bruce Schumm.
Thoughts About (Silicon) Tracking for the Linear Collider Detector(s) Bruce Schumm SCIPP & UC Santa Cruz SCIPP Seminar May 10, 2005.
The SCIPP LSTFE Time-Over- Threshold Electronics Readout Project SILC Meeting, Santander, Spain December, 2008 Bruce Schumm Santa Cruz Institute.
SCIPP R&D on the International Linear Collider Detector SCIPP Review November 29, 2005 Presenter: Bruce Schumm.
E cm up to 1 TeV, de- pending on site chosen Design luminosity of 2x10 34 cm -2 s -1 Beam spot: 550x5.7 nm Crossings every 337 ns for about 1  s; repeats.
SLEPTON MASS RECONSTRUCTION AND DETECTOR RESOLUTION Bruce Schumm University of California at Santa Cruz ALCPG Workshop, Snowmass Colorado August 14-28,
Thoughts on B-Field Uniformity for the SD Tracker SID Tracking Meeting October 22, 2004 Bruce Schumm UC Santa Cruz March 2001 Baseline Thanks to Harry.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
FORWARD SELECTRON PRODUCTION AND DETECTOR PERFORMANCE Bruce Schumm University of California at Santa Cruz SLAC LCWS05 Special Recognition: Troy Lau, UCSC.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
SCIPP R&D on Long Shaping- Time Electronics 4 th SiLC Meeting Barcelona, Spain (by remote connection) December Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-28, 2006 Bruce Schumm.
SIMULATION RESULTS FROM THE SANTA CRUZ LINEAR COLLIDER GROUP Bruce Schumm University of California at Santa Cruz 4 th SiLC Meeting, Barcelona December.
SCIPP R&D on Linear Collider Tracking – Hardware and Simulation DOE Site Visit June Bruce Schumm Santa Cruz Institute for Particle Physics.
SCIPP R&D on Long Shaping- Time Electronics ALCPG Workshop Vancouver, BC, Canada July 19-22, 2006 Bruce Schumm.
SCIPP R&D on Time-Over- Threshold Electronics and Long- Ladder Readout LCWS 07 DESY May 30 – June Bruce Schumm Santa Cruz Institute for Particle.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
SPiDeR  First beam test results of the FORTIS sensor FORTIS 4T MAPS Deep PWell Testbeam results CHERWELL Summary J.J. Velthuis.
Study of FPCCD Vertex Detector 12 Jul. th ACFA WS Y. Sugimoto KEK.
Silicon Microstrip R&D at SCIPP and the University of California at Santa Cruz Future Linear Colliders Spanish Network Universidad de Sevilla February.
ALCPG Simulation Status and Plans ECFA LC Workshop, Durham Sep. 2, 2004 Norman Graf (SLAC)
ALCPG Simulation Status and Plans ACFA LC Workshop, Taipei Nov. 10, 2004 Norman Graf (SLAC)
Fine Pixel CCD Option for the ILC Vertex Detector
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
SiD Tracking Simulation: Status and Plans Richard Partridge for the SiD Tracking Group Vancouver Linear Collider Workshop July 19-22, 2006.
The Gossamer Tracker: A Novel Concept for a LC Central Tracker Bruce Schumm SCIPP & UC Santa Cruz UC Davis Experimental Particle Physics Seminar June 3,
Silicon Sensors for Collider Physics from Physics Requirements to Vertex Tracking Detectors Marco Battaglia Lawrence Berkeley National Laboratory, University.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Tracking Group Summary Bruce `Lefty’ Schumm UC Santa Cruz Arlington Linear Collider Workshop January 9-11, 2003.
Tracking at the ILC: Why Silicon Tracking is Best, and How it Might Be Optimized Bruce Schumm SCIPP & UC Santa Cruz STD6 “AbeFest” September 11, 2006.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 8, 2006 Presenter: Bruce Schumm.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
VXDBasedReco TRACK RECONSTRUCTION PERFORMANCE STUDIES Bruce Schumm University of California at Santa Cruz ALCPG Workshop, Snowmass Colorado August 14-28,
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
ILC Instrumentation and Simulation R&D at SCIPP DOE Site Visit Thursday, June 18, 2009 Bruce Schumm Santa Cruz Institute for Particle Physics.
TPC for 4-th concept S.Popescu IFIN-HH, Bucharest.
Time-Over-Threshold Readout Long Ladder Readout Noise
Requirements and Specifications for Si Pixels Sensors
5% The CMS all silicon tracker simulation
The Silicon Track Trigger (STT) at DØ
The LHCb VErtex LOcator
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
The LHCb Front-end Electronics System Status and Future Development
International Tracking Testbeam Needs
Presentation transcript:

SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm

The Last SCIPP Slide on the SLD that You Will Ever See DIRECT MEASUREMENTS OF A(B) AND A(C) USING VERTEX/KAON CHARGE TAGS AT SLD Published in Phys.Rev.Lett.94:091801,2005 A c =   A b =   Best measurement of these parameters Technique leads the way to future measurements (GigaZ)

R&D Activity is increasing, with studies now on four fronts:  Physics and machine studies for e - e - running  Detector resolution standards from physics simulation  Reconstruction capabilities of all-silicon tracking  Hardware proof-of-principle of low-mass silicon tracking Current involvements (all very much part time) 3 senior physicists, 2 post-docs, 2 graduate students, 4 undergraduate thesis students, 1 Engineer, 1 technical staff, one bored spouse of a Silicon Valley engineer.

International Linear Collider: Activity on the e - e - Front Clem Heusch is the SCIPP participant in e - e - studies Leading international effort in the use and application of e - e - beams at the ILC Continuing series of workshops hosted by SCIPP; proceedings published in World Scientific Heusch is a member of ILC Subcommittee on International Collaboration.

Detector Resolution Standards from Selectron Production Participants: Senior Physicist Bruce Schumm Undergraduate Thesis Students Troy Lau *, Joseph Rose, Matthew Vegas, Eric Wallace Community Member (on hold before Grad School) Ayelet Lorberbaum * Recipient of two Undergraduate Research Awards; grad school at U. Michigan this fall.

Original Motivation To explore the effects of limited detector resolution on our ability to measure SUSY parameters in the forward (|cos(  )| >.8) region. SiD Tracker

selectrons LSP SPS 1 Spectroscopy: At E cm = 1Tev, selectrons and neutralino are light. Beam/Brehm: √s min =1 √s max =1000  =.29 s z =.11 (mm)

sample electron energy distribution M selectron = (SPS1A) Lower Endpoint Upper Endpoint Electron energy distribution with beam/bremm/ISR (.16%). No detector effects or beam energy spread.

SPS1A at 1 TeV Selectrons vs. cos(  ) Electrons vs. cos(  ) Roughly ½ of statistics above |cos(  )| of 0.8, but…

The spectrum is weighted towards higher energy at high |cos(  )|, so there’s more information in the forward region than one might expect.

Determine the selectron mass accuracy in both the central (0 < |cos  | < 1) and full (0 < |cos  | < 1) region

Detailed Simulation of SiD Tracking System (and SiD variants) Participants: Senior Physicist Bruce Schumm Graduate Students Christian Flacco, Luke Winstrom, Michael Young * * Supported primarily through department (TA) funds; work deemed important enough that SLAC is paying for ½ of his support this summer.

Two areas of work: Pulse Development Simulation Provides simulation of pulse development and amplification. Will soon be incorporated in international simulation framework (awaiting “hook” from Norman Graf at SLAC) SiD Tracking Capabilities Explore tracking performance of five-layer SiD tracker, as well as that of 8-layer variant Detailed Simulation of SiD Tracking System (and SiD variants), continued

Pulse Development Simulation Long Shaping-Time Limit: strip sees signal if and only if hole is col- lected onto strip (no electrostatic coupling to neighboring strips) Charge Deposition: Landau distribution (SSSimSide; Gerry Lynch LBNL) in ~20 independent layers through thickness of device Geometry: Variable strip pitch, sensor thickness, orientation (2 dimen- sions) and track impact parameter Lorentz Angle: 18 mrad per Tesla (holes), from measurements

Carrier Diffusion Hole diffusion distribution given by Offest t 0 reflects instantaneous expansion of hole cloud due to space-charge repulsion. Diffusion constant given by Reference: E. Belau et al., NIM 214, p253 (1983)  h = hole mobility

Electronics Simulation Detector Noise: From SPICE simulation, normalized to bench tests with GLAST electronics Analog Measurement: Employs time-over- threshold with variable clock speed; lookup table provides conversions back into analog pulse height (as for actual data) RMS Gaussian Fit Detector Resolution (units of 10  m) Will be incorporated into LCD simulation by Snow- mass

Pattern Recognition Capabilities of an All- Silicon Central Tracker Can one do pattern recognition with only five central tracking layers? Might more layers improve performance to an extent that justifies the extra material? SiD Tracker

Focussed on Snowmass workshop:  Incorporate realistic pulse-development simulation (reconstruction efficiency in jet core)  Explore and optimize “outside-in” code making using of calorimeter clusters (Von Toerne, Onoprienko, Kansas State)  Characterize missed tracks  Study momentum resolution of fully simulated tracks  Explore extrapolation into ECAL (energy flow) Simulation Study Goals

Senior Physicists Alex Grillo, Bruce Schumm Post-Doctoral Fellows Jurgen Kroseberg, Gavin Nesom Technical Staff Ned Spencer*, Max Wilder * Lead Engineer Hardware Development of Long Shaping-Time  strip Readout for the Linear Collider Detector

The Longest Ladders of all: The Gossamer Tracker Agilent 0.5  m CMOS process (qualified by GLAST) Min-i for 300  m Si is about 24,000 electrons Shaping (  s) Length (cm)Noise (e - ) Q: Can the entire half-length be read out as a single element?

Result: S/N for 167cm Ladder At shaping time of 3  s; 0.5  m process qualified by GLAST

Potential Advantages of the Gossamer Tracker Such a tracker may prove mechanically simpler, and offers the greatest possibility of competing with gaseous tracking at low p . We are awaiting the return of a prototype front-end chip, and designing the digital data-handling architecture.

RMS Gaussian Fit RMS Gaussian Fit Readout Threshold (Fraction of min-i) Trigger Threshold 167cm Ladder 132cm Ladder Resolution With and Without Second (Readout) Threshold at  shape =3  s

Design in 0.25  m complete; to be received early July

The Long Shaping-Time Front-End (LSTFE) project represents SCIPP’s transition to deep sub-micron (0.25  m) design. First attempt failed due to low-tech error (input pad connections), but we have now re-optimized for the cold RF technology (few-month turn-around). Full test and readout system developed in concert with PTSM (medical physics) system, awaiting arrival of prototype chip. Preparing to construct long microstrip ladder (1-2 meters). Have also moved forward into FPGA programming, which has allowed us to do digital (back-end) designs with minimal engineering support…

FIFO (Leading and trailing transitions) Low Comparator Leading-Edge-Enable Domain Proposed LSTFE Back-End Architecture Clock Period  = 400 nsec Event Time 8:1 Multi- plexing (  clock = 50 ns)

Master FIFO Per 128 Channel Chip: 1 Master FIFO reads out 32 local FIFO’s Store in Master FIFO essentially complete by end of ~1ms beam spill Controller FIFO Proposed LSTFE Back-End Architecture (cont’d)

By Snowmass, hope to have proposed digital architecture programmed into an FPGA, and have tested it with simulated data stream (Nesom, Kroseberg). Also beginning to think of data transmission; several hundred fibers (1 per ladder) operating in burst mode. Expertise on campus in Electrical Engineering department on intermittent use of opto-electronic devices (Ken Pedrotti; is an inter-departmental member of SCIPP. Expect another submission to refine design and increase channel count for ~fall 2006 testbeam run. Some Near-Term Goals for Hardware Development

ILC R&D SUMMARY For those with nearer-term physics project, ILC R&D provides a great avenue for advancing detection techniques and maintaining an institutional edge SCIPP is involved in many levels of studies aimed at defining and designing a tracker up to the task of exploring precision Linear Collider physics. While no one at SCIPP works on the Linear Collider as a primary commitment, we are doing critical-path work on detector R&D, and the work is an important part of our research program.