EDGE™ Project Status Update PYYNNN – Project Title Here DPM Student Presenter 1 (Dept) DPM Student Presenter 2 (Dept) DPM Student Presenter 3 (Dept) USE.

Slides:



Advertisements
Similar presentations
TRUMANSBURG CENTRAL SCHOOL DISTRICT SUPERINTENDENT’S ENTRY PLAN
Advertisements

An Introduction to professional services. The professional services The professional services support businesses of all sizes across the economy, providing.
What exactly is PYP exhibition? An overview for parents Fernway School January 9 th 7-8 PM.
Project Monitoring Evaluation and Assessment
British Nutrition Foundation Conference Update from Learning Teaching Scotland (LTS) Liz Nicoll – Development Officer Health & Wellbeing September 2010.
Aditya Manjrekar Industrial and Systems Engineering KGCOE, RIT.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Implementing the New Mathematics Integrated Resource Package (IRP) British Columbia Ministry of Education Webcast - April 5, 2007.
Eric Hettler Manuel Paris Ryan Miller Christian Moreno James Reepmeyer ME.
Objectives Wireless Command – Few Channels, High Bandwidth – Many Channels, Low Bandwidth Wireless Feedback – Sensor Data vs Real-time Video Reliability.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
CAP 252 Lecture Topic: Requirement Analysis Class Exercise: Use Cases.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
EDGE™ Project Background Presentation Open Architecture Land Vehicle Christopher Wakeley (Mechanical Engineering) DPM Student Presenter 2 (Dept) DPM Student.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Concept Level Project Plan P08428 – LED Lighting Technologies Courtney Walsh (ME)
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Michelle Bard (ME) Alexander Ship (ME) David Monahan (ME) Kristin Gagliardi (ME) October 12, 2009.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Inspiring Your Next Success! ® Company Confidential - Copyright 2008 Hitachi Consulting 1 Work Plan Development Or answering the question: “So... what.
EDGE™ Project Status Update P09121 – MAV Airframe P09122 – MAV Control System P09123 – MAV Platform Structure Aaron Nash (Mechanical Engineering) Erik.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Suggested Projects: Interface Summary: –Replacement for intended Project 1 –Retains some scope from original project: Data link development COTS.
Christopher Barrett (ME) Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems Primary Customer: ○ Currently.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Brand Engagement Study - Retail. Brand Engagement Studies To demonstrate the ability of internet advertising to drive engagement To measure the effects.
FAQs and resume & cover letter.  Get in groups of people standing in a circle.  The goal is simple; in your group, count to ten.  But…you may.
Community Input Discussions: Measuring the Progress of Young Children in Massachusetts August 2009.
IDENTIFY AND MEET A MARKET NEED
Deloitte Consulting SCOOPS Session September 2003.
© 2002 IBM Corporation CSC3023 BIT Final Year Project 1 Dr Barry McCollum 01 October 2012.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
School’s Cool in Kindergarten for the Kindergarten Teacher School’s Cool Makes a Difference!
1 Rev: 02/12/2007 MSE-415: B. Hawrylo MSE-415: Product Design Lecture #3 Chapter 4 Identifying Customer Needs.
The County Health Rankings & Roadmaps Take Action Cycle.
Life Skills Development in the 4-H Youth Development Program San Luis Obispo County November 1, 2003 Richard P. Enfield, 4-H Youth Development Advisor.
Reservoir Primary School Literacy Share Day
Title I Parent Meeting Boston Sept 1, Agenda 8:15-8:20 Welcome Sign in 8:20-8:25 Ice Breaker 8:25-8:40 Pilot School Innovation Zone 8:40-8:50Title.
Chapter 7 Applying UML and Patterns -Craig Larman
Needs Analysis. Needs analysis is concerned with establishing the true needs of the customer (VOC- voice of customer). This can be obtained from: –reports.
Systems Analysis and Design in a Changing World, 6th Edition
PROJECT STATUS UPDATE P10661-AERIAL IMAGING Dale Turley (Mechanical Engineering)
Eric Hettler Manuel Paris Ryan Miller Christian Moreno James Reepmeyer Project Status Update R Wireless Open-Source/Open-Architecture Command and.
© 2002 IBM Corporation CSC3023 BIT Final Year Project 1 Dr Barry McCollum 28 September 2015.
Charting Your Career Path Writing an Effective Resume Interviewing Strategies MCC.UE Spring 2012.
Primary Assessment and Target Tracker
Innovative Schools toolkit STRATEGIC WORKSHOP 2 Exploring good practice case studies.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Certificate IV in Project Management Assessment Outline Course Number Qualification Code BSB41507.
What exactly is PYP exhibition?. What? Culminating project in the final PYP year that allows students to apply learning from previous years An in-depth.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Special Education/Learning Support Title: The New Zealand Curriculum and the IEP Author: Rosemary Mirams address:
Public Consulting Group: Proposal Review and Planning Blue Ribbon Commission on Financing High-Quality Affordable Childcare, May 19, 2016.
Project Design SPDG Competition FY C. QUALITY OF PROJECT DESIGN (0-20 points)  Describe the extent to which the goals, objectives, and outcomes.
ACCESS for ELLs Score Changes
Chapter 8: Performance-Based Strategies
The Five Secrets of Project Scheduling A PMO Approach
Reporting Requirements K-10 Information for Schools
Concept Level Project Plan P08008 – ArcWorks Process Improvement
R09560 – Open Architecture, Open Source Aerial Imaging Systems
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Project Management Process Groups
Project Status Update P09023 – Air Muscle Artificial Limb Next Generation Jim Breunig (ME)
Project Status Update PYYNNN – Project Title Here
Final Status Update P09006 – Upper Extremity Exerciser
Final Project Plan P09004 – Eye Movement Tracking Device
Presentation transcript:

EDGE™ Project Status Update PYYNNN – Project Title Here DPM Student Presenter 1 (Dept) DPM Student Presenter 2 (Dept) DPM Student Presenter 3 (Dept) USE THIS TEMPLATE ONLY AS AN OUTLINE REPLACE IT WITH YOUR OWN MATERIAL AND YOUR OWN CUSTOM FORMAT

EDGE™ Project Status Update Project Name –Project Title Here Project Number –PYYNNN Project Family –Insert family name here Track –Insert track name here Start Term – planned academic quarter for MSD1 End Term – planned academic quarter for MSD2 Faculty Guide –Dr. First Last (Dept) Indicate whether this is your choice, or confirmed Faculty Consultant –Dr. First Last (Dept) Indicate whether this is your choice, or confirmed Faculty Consultant –Dr. First Last (Dept) Indicate whether this is your choice, or confirmed Primary Customer –Name, Organization, Title - Indicate whether this is your choice, or confirmed

EDGE™ Phase 0: Planning Mission Statement Product Description /Project Overview This product is a beverage container specifically designed for young school children in the USA, attending grades kindergarten through 3rd grade, and carrying beverages from their home to school in their backpacks and lunchboxes. Key Business Goals/Project Deliverables The primary business goals of this product are to use this product to provide a stable source of employment for our work force, thus contributing in a positive and sustainable way to our community in a rural area of upstate New York. increase the market share of our packaging company, which manufactures a wide range of containers and packaging in the food industry. increase market share of the beverage makers who purchase our containers, thus creating a strong affinity for the use of our packaging products throughout the beverage makers' market line. Primary Market /Project Opportunities The primary market for this beverage container are the parents of children in grades K-3 in the United States of America. Secondary Market /Project Opportunities Secondary markets for these beverage containers may be non-school uses of the containers, such as sporting events (youth soccer leagues, etc.) and for other age groups. However, the product design should be focused on school uses for grades K-3. Additional market areas may require significant redesign of the product. Stakeholders Stakeholders in the design of our product include the following: The ultimate consumers The staff and teachers affiliated with the school, such as Beverage Manufacturers and Bottlers / Wholesalers Beverage Retailers The Community in which our packaging plant resides The Communities in which our consumers reside

EDGE™ Phase 1: Concept Development Identify Customer Needs - Interviews Primary Customer(s) Quantify Indicate who you have already interviewed, and what you have learned. Indicate who you plan to interview, and when, where and how you will capture the resulting information. Other Stakeholder(s) Quantify Indicate who you have already interviewed, and what you have learned. Indicate who you plan to interview, and when, where and how you will capture the resulting information. Past Senior Design Team(s) Quantify Identify any and all senior design teams from the past or under way now that may have a connection to your project. What resources already exist that you can draw upon? What hardware, software, design, data, customer interviews, case studies, and other information already exist? What do you learn from that data. Note that this task is usually overlooked by many DPM students, and they end up re-doing a lot of work that has already been done. Take advantage of past knowledge – just make sure to cite your sources very thoroughly. List all visits completed, in process, and pending.

EDGE™ Roadmap Context Most senior design projects are one part of a larger family of related projects. Demonstrate where this particular project fits into the larger family of projects. If multiple DPM students are working on closely related projects, you may wish to consolidate multiple project updates into a single comprehensive presentation for the entire family of projects. Avoid the pitfall of having your project being isolated and not part of a larger picture

EDGE™ Phase 1: Concept Development Identify Customer Needs - Interpret Needs Statements: 1.Express the need in terms of WHY the customer would spend money on this product. 2.Express the need in terms of WHAT the product has to do for the customer, not in terms of how the product might do it. 3.Express the need as specifically as the raw data. 4.Use positive phrasing 5.Express the needs as attributes of the product Graphical Interpretation 1.Propose a first draft affinity diagram based on your raw data collected 2.Propose a first draft objective tree based on your interpretation of the data collected 3.Propose a first draft function tree based on your proposed functional approach to the problem Organize the Needs into a Hierarchy 1.Propose a first draft based on your data collected Establish the Relative Importance of the Needs 1.Propose a first draft based on your data collected Reflect on the Results and the Process 1.Propose a first draft based on your data collected

EDGE™ Affinity Diagram – Raw data from Customers and Stakeholders

EDGE™ Objective Tree – Why Does the Customer Need this Product? Develop a modular wireless C&C system Wireless Command Few channels, high bandwidthMany channels, low bandwidth Wireless Feedback Sensor data (low bandwidth)Streaming real-time video (high bandwidth) Use on a variety of vehicles Open sourceScalability Lightweight and simple when possibleMany channels when needed Long battery lifeSmall footprintSufficient range Reliability Battery lifeRangeMinimal data loss Biomed applications User-friendly interfaceShorter rangeLightweight (to be carried by a user)Feedback-intensiveSecure

EDGE™ Function Tree – What does this product need to do? This Product Needs to … F1F2 F3F4

EDGE™ HOQ Main Body VOC to VOE F1F2F3F4 O1139 O29 O39 O413

EDGE™ Preliminary Schedule Graphical Representation of Rough Schedule What will you be working on each week between now and the end of the quarter? Demonstrate that you are planning to attend significant presentations, demonstrations, and design reviews of related MSD projects already in progress

EDGE™ Future Plan Where do you go from here? Give us some idea of where you are headed from this point going forward….