NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
What should we propose to ATI? Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
NGAO Build to Cost Summary Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max & the NGAO Team SSC Meeting April 14, 2009.
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
Keck Observatory and The System: Astro2010 Activities Mike Bolte, Shri Kulkarni, Taft Armandroff Keck Strategic Planning Discussions September 18, 2009.
Update on the NASA/NOAA/DOE Collaboration on the Utilization of ROA/UAV/UAS for Global Climate Change and Weather Research Will Bolton Sandia National.
Implementation Timeline Third Quarter Update – January 2014.
Report to Professional Council June 4, 2009 By Carla Boone Planning Council: A New Way of Doing Business at COM.
LGS AO Readiness for 05B AOWG meeting February 4, 2004 Keck LGS AO team.
City Council October 21, 2013 Strategic Planning Retreat Next Steps.
Overview of New Funding Model May 17, 2013 Astana, Kazakhstan.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
School Finances for Finance Subcommittees School Councils.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Practical aspects Dr. Ir Matthijs Soede Senter/EG-Liaison “Practical Aspects of Preparation FP6 projects Poznan - 21 November 2002 Dr. Ir.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Information session first joint ERANID call (Task 5 DOW) Belgian Science Policy Office 30 September 2015.
National Science Foundation. Seeking Doctoral Dissertation Support from the National Science Foundation: Do’s and Don’ts Program Officer Political Science.
Midwest Big Data Hub Letters of Intent for NSF Edward Seidel Director, NCSA Founder Prof. of Physics, Prof of Astronomy On behalf of the Midwest.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Atlantic Innovation Fund Round VIII February 5, 2008.
1 Investing in America’s Future The National Science Foundation Strategic Plan for FY OPP Advisory Committee 10/26/06.
Mount Vernon City School District Comprehensive Team Planning for Improved Student Achievement Presentation by Maureen Gonzalez Deputy Superintendent.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
Information session first joint ERANID call Department of Health Eligibility Guidance for UK Researchers Policy Research Programme, Department of Health,
September 8, 2015 Update Housing Committee September 8, 2015 Neighborhood Revitalization Plan for Dallas.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Unit 8: Implementation, Part II Seminar Wednesday pm ET.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
City Commission Workshop Zoning Code Rewrite
Large Synoptic Survey Telescope
Center for Excellence in Applied Computational Science and Engineering
Concluding remarks E. Migneco
CIF FY17 Business Plan and Budget
Atmospheric and Geospace Sciences Division
Russell Center Small Research Grants Program
Back-End Payor Sub-Group
Presentation transcript:

NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team

2 NGAO Report Topics NSF MRI proposal Build-to-cost Risk reduction –Laser collaboration –MASS/DIMM Monthly progress reports at

3 NGAO MRI Proposal Title: “Development of an Improved Keck II Laser Launch Facility – Enhancing the Scientific Return of Keck LGS AO” Key Personnel: P. Wizinowich (PI), J. Chin (PM), T. Stalcup (SE) Science Personnel: M. Liu (PS), A. Ghez, C. Max Purpose: 1) Implement launch telescope for NGAO; 2) Improve Keck II LGS AO performance in near-term Amount: $1355k NSF & $580k (i.e., 30%) WMKO Period: Aug/09 – Sept/11

4 NGAO MRI Proposal Predicted Performance for T Dwarf Binary Case Factor of 2x improvement  6x in dynamical mass determination R = 16.2 NGS 31” off-axis 50  zenith angle 1% photometry

5 Build-to-Cost Potential cost saving ideas identified (16+ items) & initial $ estimates made –Evaluation continuing Keck Strategic Plan 2008 reviewed for science priorities impact On track to reduce estimate from ~$67M (without multi d-IFS) to $60M

6 Risk Reduction: Laser Collaboration for LGS AO Goal: Leverage community funds/interests to produce an affordable commercial laser & to complete laser preliminary designs Adkins & Wizinowich participated in ESO evaluation of 5 bids for laser preliminary designs (NDA in place) Unanimous recommendation to be submitted to ESO Finance Committee for approval on Feb. 17 –Likely to fund two 250k Euro preliminary designs U.S. consortium likely to provide a total of 250k Euros for additional risk reduction in collaboration with ESO –$300k AURA sub-award to WMKO (PI: Wizinowich) in place from NSF GMT & TMT funds –By Feb. 17: Initial risk reduction statement of work for discussion with vendors Intention is to share all preliminary design results –By Feb. 17: Draft MOU with ESO, GMT, TMT, AURA & WMKO

7 Risk Reduction: MASS/DIMM Collaboration Goal: Implement an atmospheric profiler in support of NGAO off-axis PSF calibration (without using NGAO funds) MOU for TMT donation of MASS/DIMM complete MOU with CFHT & UH nearly complete OMKM approval complete Requirements, validation plan, project plan, etc. in place CFHT providing PM & staff, with IfA & TMT support, to implement at weather tower site Wizinowich & Goodrich put collaboration in place –Lewis negotiated TMT donation –Goodrich attending bi-weekly meetings

8 Conclusion Good progress on build-to-cost, risk reduction activities & proposals (ATI & MRI) Looking forward to being able to focus on the preliminary design, & to ramping up the team, once the build-to-cost concept review is complete