Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,

Slides:



Advertisements
Similar presentations
Alexander Temnykh Cornell University, Ithaca NY, USA
Advertisements

Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Magnets for the ESRF upgrade phase II
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
SSRL EPU Magnetic Measurements Zachary Wolf March 15, 2013.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
From Beam Dynamics K. Kubo
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
SCU Next Phase Meeting July 8, 2014.
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Beam-Based Alignment Results
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Undulator Tuning Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Physics Requirements for Conventional Facilities
LCLS Undulator Magnetic Measurements
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko, Y. Levashov, Ed. Reese, R. Ruland, A. Weidemann

Zachary Wolf Undulator Tuning June 17, 2008 Outline Undulator quadrupole measurements and fiducialization Undulator tuning and fiducialization Problems Repairs Extend K Adjustment Range Schedule Reference undulator measurements

Zachary Wolf Undulator Tuning June 17, 2008 Undulator Quadrupoles Strength And Harmonics Rotating Coil System Fiducialization Vibrating Wire System

Zachary Wolf Undulator Tuning June 17, 2008 Integrated Gradient (normalized)

Zachary Wolf Undulator Tuning June 17, 2008 Harmonics n = 3, 4, 6, & 10

Zachary Wolf Undulator Tuning June 17, 2008 BBA center shift for +/- 1 amp around +/- 4.3 Amps

Zachary Wolf Undulator Tuning June 17, 2008 Quadrupole Measurements 25 Undulator Quads measured with the rotating coil. Final Magnet June 26 th. 17 Undulator quads fiducialized to their magnetic center. Final magnet June 30th. Tolerances Integrated gradient: no tolerance, measure transfer function, individual supplies Harmonics: no tolerance, small beam size, looking for big problems BBA center shift: ±3 microns, need to look at outliers, also change energy for BBA So far, all quadrupoles seem acceptable. Closer look at BBA outliers required.

Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning And Fiducialization Overview The tuning is going well Almost done with 33 (details to follow) Mounting feet standardization is progressing Problem with storage, need to re-fiducialize 15 undulators Repairs of un-tunable undulators have started Recent plan to increase K adjustment range The measurements look good Stable, low noise, … Hall probe, short coil, long coil measurements agree The reference undulator measurements are stable

Zachary Wolf Undulator Tuning June 17, 2008 Done (6) (in Bldg. 33) Ready for feet (5) (in MMF) To be re-fiducialized (15) (in Bldg. 750) To be tuned (2) To be repaired (8) At Argonne (2) Undulator Measurement Status (5/14/08) Undulator Measurement Status Update (6/17/08) 32 through rough tuning 31 through fine tuning 2 are repaired 2 are RFI (new shims)

Zachary Wolf Undulator Tuning June 17, 2008 Re-measure After Storage x-trajectory, y-trajectory, phase errors, all ok But The fiducialization changed by 200 microns in x

Zachary Wolf Undulator Tuning June 17, 2008 Bldg 750 Temperature 20 C ~11 C Temperature ~9 C

Zachary Wolf Undulator Tuning June 17, 2008 Storage Temperature Gap Change 1 micron average gap change Gap change during storage Field changes agree with gap changes CMM Hall probe

Zachary Wolf Undulator Tuning June 17, 2008 Storage Problem Summary The undulators in bldg 750 should be re-fiducialized. The trajectories and phases are ok. The average gap changed by about 1 micron. The magnetic axis shifted by about 200 microns in x. 200 microns → ∆K/K ≈ 1.8 × Tolerance ∆K/K = 1.5 × Bldg 750 re-measured undulators Bldg 33 “data point” in process.

Zachary Wolf Undulator Tuning June 17, 2008 Two areas to replace shims 130µm Ed Reese Repairs Required Before repair

Zachary Wolf Undulator Tuning June 17, µm Ed Reese After Repair

Zachary Wolf Undulator Tuning June 17, 2008 New: Extend K Adjustment Range Originally, only ±2.5 mm good field region could be achieved Originally, ±2.5 mm horizontal adjustment range required, but a larger range was desired New B x shims allow ±6 mm horizontal good field region Now we want to extend undulator horizontal adjustment range Need to solve beam pipe clearance problems

Zachary Wolf Undulator Tuning June 17, 2008 Interference with vacuum chamber X-trajectory shim Cut material off X-trajectory shims limit vacuum chamber “in”-motion to 2.5mm Undulators tuned for ±6 mm Shims to be modified to allow - 6mm motion and Undulator tuning to be checked

Zachary Wolf Undulator Tuning June 17, 2008 X trajectories

Zachary Wolf Undulator Tuning June 17, 2008 Interference with vacuum chamber. Continued Old New Fix, new triangles on old strongback

Zachary Wolf Undulator Tuning June 17, 2008 Y trajectories

Zachary Wolf Undulator Tuning June 17, 2008 X field integrals

Zachary Wolf Undulator Tuning June 17, 2008 New RFI Schedule General Plan (my view) 1) While we are waiting to install the undulators, we can re-fiducialize and fix the clearance problems according to this schedule. We start near the end and work backwards. 2) If commissioning is going well, we can install any remaining undulators “as-is”. a) The motion range will be restricted, but at the beginning where it is not as important. b) K may be slightly out of tolerance for the first few undulators. We can correct assuming bldg 750 undulators behave similarly. c) We can swap them and fix them after the machine is running. 3) This is in line with the Lehman committee’s desire to get the machine running without additional delays. * * Undulator commissioning starts # # Beam line commissioning starts

Zachary Wolf Undulator Tuning June 17, 2008 Reference undulator K is tuned to the same value each time. K is adjusted for temperature and X-position. (All errors included in the plot.) R.M.S. = 9  Probe re-calibrated K target = Problem with probe calibration* * Z. Wolf “Undulator tuning and fiducialization schedule”. FAC Meeting, April 2007

Zachary Wolf Undulator Tuning June 17, 2008 Conclusion Undulator quadrupole measurements are nearing completion. Production measurements of 33 undulators is nearly complete. New work has started. MMF throughput averaged 2 devices/month. Repairs of un-tunable undulators has started. Tuning accuracy is within the tolerances. The K adjustment range will be increased. Due to interference with the vacuum chamber in off-axis position, X and Y trajectory shims will be modified/replaced on all undulators. The undulators will be re-measured and re-fiducialized and have their shims replaced. Undulator Status 32 undulators went through rough tuning 31 undulators went through fine tuning 2 undulators are repaired 2 undulators RFI (with shims replaced) 1 undulator back from bldg 33, new temperature excursion test