A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.

Slides:



Advertisements
Similar presentations
7/16/03LC TB Summary1 LC TB Goals and Organization Detector groups have made significant progress Individual detector groups have been working on TB efforts.
Advertisements

The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Engaging Stakeholders 6 May 2015 Work Plan Symposium Geneva, Switzerland Kathy Fontaine IEEE.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Worldwide Study Organizing Committee Report from Worldwide Study on Physics and Detectors ICFA meeting, Beijing August 2004.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Jim Brau for WWS to ICFA at Uppsala, 3 July Report of WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford March Discussing.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Session 9 Communicating with Parents: Parent-Teacher Conferencing.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Seventh Annual Meeting of the WG: Objectives and Agenda Jennifer H. Madans U.S.A.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
The European Strategy for Particle Physics
Brief summary of discussion at LCWS2010 and draft short term plan
Introduction to the Workshop
Plan the implementation of change
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon

Words of Thanks  To the attendees, who made it on short notice  To the session organizers  To the local organizing committee Markiewicz, Seryi, Woods  Naomi Nagahashi

Purpose of MDI Machine DetectorPhysics Complicated Optimization with many parameters Need to expand knowledge beyond one particular box

Current MDI Goals Identify hard constraints Identify hard constraints Understand comparative advantage of parameter variations Understand comparative advantage of parameter variations Work towards complete conceptual design Work towards complete conceptual design Do not try to prejudge the final design Do not try to prejudge the final design

Strawman BDIR Need more than quick studies Must start designing something concrete to understand consequences of certain decisions Two angles needed to explore parameter range

Design Progress Significant progress in last six months Significant progress in last six months Real progress on strawman since KEK Real progress on strawman since KEK

Physics/Detector Communication Maintain contact with detector/physics groups Maintain contact with detector/physics groups  Important part of optimization process  Detailed studies often slow Communication at various levels Communication at various levels  Reports at detector concept meetings  LCWS  Directly with WG conveners  Regional subsystem meetings Propose specific questions, tasks

MDI Communication Real work is done locally Important to establish good inter-regional communication Workshops only go so far Strongly support some mailing list/forum/hypernews communication channel

Testbeams Some questions only answered with data Some questions only answered with data Long lead times - must identify early Long lead times - must identify early Limited resources and facilities Limited resources and facilities Try to coordinate globally Ex: ESA energy program, BPMs at ATF, Forward Detectors, …

Timeline LCWS March, Stanford BDIR Workshop (WG4) June, RHUL Snowmass August, Colorado “CDR” by end of the year? We must be ready for that possibility 1st ILC Meeting MDI Workshop BDIR Workshop Snowmass You Are Here LCWS

Goals from Snowmass Conceptual design largely complete Conceptual design largely complete Matrix of parameters and relative merits/impacts filled in Matrix of parameters and relative merits/impacts filled in Identify (few) remaining questions to answer by end of 2005 Identify (few) remaining questions to answer by end of 2005 Tie up loose ends before CDR Tie up loose ends before CDR

In Conclusion Good progress toward conceptual design Good progress toward conceptual design MDI needs to maintain good communication as designs (machine and detector) become more concrete MDI needs to maintain good communication as designs (machine and detector) become more concrete Lets get back to work… Lets get back to work…