“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.

Slides:



Advertisements
Similar presentations
The use of Procurement Agents
Advertisements

Dr. Jim Barnett Associate Vice President of Facilities and Interim C.E.O., Business Enterprises, Inc. B.E.I. Update to B.O.T.
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
DoI Procurement Overview Improvements to Process Cindy McDonald Director Contracts and Program Management Construction Industry Forum 30 May 2013.
Integrated Baseline Review What is it? Why should I want one? Joseph A. Jankoviak, PMP, PMI-RMP.
Alternative Project Delivery
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
RFP PROCESSES Contracts for Professional Services.
January – May 2013 Existing Curriculum and Space Needs Summary Facilities staff meets individually with all school principals, as well as Academics and.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Lutheran Church of the Good Shepherd Building Committee Update May 2014.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
PHASE 2 CONSTRUCTION PHASE I DESIGN SERVICES ISSUE DESIGN-BUILD CONTRACTS DIFFERENCES: SUBCONTRACTOR LISTING (POST AWARD) VALUE ENGINEERING (CHANGE ORDER.
WRA 453 Grant & Proposal Writing Fall 2005 Bill Hart-Davidson Session 5: P3 guidelines; analyzing RFP’s.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
Learning with Purpose CAP Steering Committee Energy Project ID Two Important Initiatives 4/28/2014.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
CHE 165 Plant Design Introduction. Greensheet Review  Target is Study –Reported Verbally and in Text –Consists of Various Components  Most are submitted.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
ISO 9001: 2000 Certified Audit Process What to do.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
1. Project Team  Susan Barry, Project Director  Brian Burger, Deputy Project Director  James Martin  Mike Landvik  Kevin Irving, FHWA 2.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master Safety in the Procurement Process Bill.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
The Owner’s Perspective
Project Management Processes for a Project
Construction Quality Management Metro Goldline Eastside Extension Los Angeles January 19, 2007 ASCE Construction Institute Conference.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Best Practices for Design Build Procurement
FY13 Waste Water Treatment Plant, PN75165, JBLM, WA W912DW-13-R-0001 Industry Day 27 Nov 2012.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
CIP2 DESIGN-BUILD PROJECT PRE-PROPOSAL CONFERENCE June 28, 2007.
Construction Management At Risk Process
OC Animal Care Services Design-Build RFQ Conference October 27, 2015.
Village of Woodridge, IL ERP System and Implementation Services Vendor Pre-Bid Meeting August 28, 2013.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Service reference ABU DHABI, United arab emirates IND 36 months
Developing and Issuing the RFP
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
PROJECT DELIVERY METHODS
Engineering & Architectural Services
The Intern
Before During After Follow-up Resolve Review Pre-review Familiarize
Back Ground Information
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Presented by (Abdisamad Abdullahi Abdulle)
(select this text and type the name of your development company)
(select this text and type the name of your development company)
(select this text and type the name of your development company)
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
PLAYER INDIVIDUAL DEVELOPMENT PLAN
Presentation transcript:

“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building w/Central Plant in Basement Completed: 7/01 Cost: $40 Million Grade: A+ Issues: Scope Changes Post Award

Parking Structure 6 2,470 Spaces on 6 Levels “PURE” DESIGN-BUILD Grade: A Issues: Site Conditions Completed: 11/01 Cost: $17.05 M

DESIGN-BUILD

EVALUATING TECHNICAL PROPOSALS Assigning Points Assessing Criteria Think Like a Contractor Tell all you Know – Preconstruction Meetings Get What you Want

“BRIDGING” DESIGN-BUILD Gateway Addition Team ID #001

“BRIDGING” DESIGN-BUILD Gateway Addition

Team ID #003

“BRIDGING” DESIGN-BUILD Gateway Addition Team ID #004

“BRIDGING” DESIGN-BUILD Gateway Addition Team ID #005

SUMMARY Pick Method that Fits Project Understand What it Takes Document Each Step – Audit Define Roles: Procurement Facilities Verify Performance Post -- Project