Presentation is loading. Please wait.

Presentation is loading. Please wait.

FY13 Waste Water Treatment Plant, PN75165, JBLM, WA W912DW-13-R-0001 Industry Day 27 Nov 2012.

Similar presentations


Presentation on theme: "FY13 Waste Water Treatment Plant, PN75165, JBLM, WA W912DW-13-R-0001 Industry Day 27 Nov 2012."— Presentation transcript:

1 FY13 Waste Water Treatment Plant, PN75165, JBLM, WA W912DW-13-R-0001 Industry Day 27 Nov 2012

2 2 Introduction This conference is for informational purposes only. Comments/clarifications made today will not necessarily change the upcoming solicitation. W912DW-13-R-0001

3 3 Solicitation General Information This RFP will be advertised as a Two Phase Design Build, Best Value Procurement. Only the Firms Shortlisted in the Phase 1 Process will be sent to the Phase 2 Solicitation and invited to attend the Preproposal Conference and Site Visit. W912DW-13-R-0001

4 4 Questions During the Upcoming Proposal Stage Questions during the solicitation phase 1 and 2 are handled through www. projnet.org Technical Questions: –www.projnet.orgwww.projnet.org For Any Other Administrative Questions, please contact Erik Lundstrom: –Email: Erik.A.Lundstrom@usace.army.milusace.army.mil –Phone: (206) 764-6698 Federal Acquisition Regulation: http://farsite.hill.af.mil/http://farsite.hill.af.mil/ W912DW-13-R-0001

5 5 Competition for this Solicitation is Unrestricted and open for all Business Firms. NAICS Code: 237110 Small Business Size Standard: A firm having an average annual gross revenue of $33.5 Million or less for the last three fiscal years. For any small business related questions, please contact Seattle District’s Small Business Specialist, Ms. Veronica Kammler, at: Phone 206-431-7100 –Email: veronica.a.kammler@usace.army.milveronica.a.kammler@usace.army.mil Solicitation General Information W912DW-13-R-0001

6 6 Solicitation General Information This project is a Design-Build Request for Proposal (RFP), see FAR part 36.3. –There is no public bid opening. Information, other than technical changes or administrative clarifications, will not be provided during the evaluation process. This is a Best Value procurement (refer to FAR part 15 and sections 00 22 10 and 00 22 20 of the upcoming solicitation). W912DW-13-R-0001

7 7 Solicitation General Information Design-Build Two-Phase Schedule –Phase 1 on fbo.gov = 30 days –Phase 1 Evaluation = approx. 45-60 days –Phase 2 sent to Prime Contractors = 45 days –Phase 2 Evaluation = approx 60-90 days W912DW-13-R-0001

8 8 Conclusion Questions? W912DW-13-R-0001


Download ppt "FY13 Waste Water Treatment Plant, PN75165, JBLM, WA W912DW-13-R-0001 Industry Day 27 Nov 2012."

Similar presentations


Ads by Google