Status of Trigger Rate Studies Analysis Group meeting 27 January 2003 D. Wren S. Ritz.

Slides:



Advertisements
Similar presentations
Low x workshop Helsinki 2007 Joël Feltesse 1 Inclusive F 2 at low x and F L measurement at HERA Joël Feltesse Desy/Hamburg/Saclay On behalf of the H1 and.
Advertisements

Status report on Light Simulator Claudia Cecchi Francesca Marcucci Monica Pepe Software meeting Udine January
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Performance of AMS-02 on the International Space Station DESY Theory Workshop, Hamburg Melanie Heil Supported by the Carl-Zeiss Foundation.
S. Ritz 1 Hardware Trigger Throttle Issues Context: the triggers Purpose of throttle on TKR trigger Earlier design using TKR geographic information The.
Update: Onboard Filter & Ground Software Integration N. Golpayegani S. Ritz D. Wren Analysis Group Meeting; 28 July 2003.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
Sources for the Data Challenge Toby Burnett, Theodore Hierath, Sean Robinson SLAC Workshop 15 July 2003.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
Status of Trigger Rate Studies Analysis Group meeting 3 March 2003 D. Wren S. Ritz.
David WrenDC1 Closeout, 13 February OnboardFilter Update Work done by: Navid Golpayegani J.J. Russell David Wren Data Challenge I Closeout Meeting,
GLAST LAT ProjectTrigger Scheduler, Engines, and Rates 6 Feb 2006 J. Eric Grove Naval Research Lab Washington DC Trigger Scheduler, Engines, and Rates.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
Analysis Meeting 31Oct 05T. Burnett1 Classification, etc. status at UW Implement “nested trees” Generate “boosted” trees for all of the Atwood categories.
Hardware Failure Impacts Exercises S. Ritz. Issues Recent results from design reliability analysis (system engineering, Thurston et al.) Probabilities.
GLAST LAT Project S. Ritz 1 GLAST Large Area Telescope: Adding Converter to the Blank TKR Planes? Bill Atwood, Tune Kamae, Steve Ritz 4 September 2002.
GLAST Science Support Center February 12, 2004 DC1 Closeout Detecting Gamma-Ray Bursts in the DC1 Data David Band (GSSC)
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
Onboard Filter Update Performance after updated cuts David Wren 26 January 2004.
Status of Trigger Rate Studies Analysis Group meeting 9 December 2002 D. Wren S. Ritz.
April 1, Beam measurement with -Update - David Jaffe & Pedro Ochoa 1)Reminder of proposed technique 2)Use of horn-off data 3)Use of horn2-off data?
GLAST LAT Project17 August, 2001 S. Ritz 0 GLAST Large Area Telescope: Status of System-level Performance Simulations UPDATE (to 26 July presentation)
GLAST background review dec Simulating rates: the big picture Incoming rate into the 6 m 2 sphere: is it right? Corresponding trigger rate: implies.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 S. Ritz Backgrounds and Trigger Rates 1 Backgrounds and Trigger Rates on Orbit S. Ritz with many contributions.
Analysis Meeting 14Nov 05T. Burnett1 Classification, etc. status at UW New application to apply trees to existing tuple Background rejection for the v7r2.
Trickle Injection Overview Background Injection is necessary to refill beam “buckets” which have lost charge. A particular bucket is targeted for each.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST Simulations Theodore E. Hierath Louisiana State University August 20, 2001.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 Back Ground Rejection Status for DC2 a la Ins. Miner Analysis.
Analysis meeting 11July05 - T. Burnett 1 Status of the Background Review DC2 prep meeting: Switch to CRflux package by Mizuno for charged particles, Earth.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Status of Onboard Filter & Ground Software Integration Work done by Navid Golpayegani Steve Ritz J.J. Russell David Wren SLAC Ground Software Workshop:
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
H->ZZ->4l Update Trying to re-do CSC note: MC Sample Trigger Eff. Electron Selection Eff. Muon Selection Eff.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Gamma-ray Large Area Space Telescope IEEE Nuclear Science Symposium Wyndham El Conquistador Resort, Puerto Rico October , 2005 The Gamma Ray Large.
V.L. Kashevarov. Crystal Collaboration Meeting, Mainz, September 2008 Photoproduction of    on protons ► Introduction ► Data analysis.
O After integration and test at SLAC and GSFC, BFEM was shipped to the National Scientific Balloon Facility (NSBF) at Palestine, Texas. The experiment.
T. Burnett1 GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 9, 2002 SAS Software: Sources Detector geometry model Simulation Event.
ESP & Psychic Solar Flare Models
Isotopic Abundance SCH 3U. Atomic Mass The mass of an atom (protons, neutrons, electrons) Relative Atomic Mass: An element’s atomic mass relative to the.
Aa GLAST Particle Astrophysics Collaboration Instrument Managed and Integrated at SLAC/Stanford University The Gamma-ray Large Area Space Telescope (GLAST)
RICH upgrade simulation: updates RICH upgrade-software meeting 1 S.Easo.
Geant4 for GLAST BFEM -Comparison with Distributions in BFEM Data – T. Mizuno, H. Mizushima, S. Ogata, Y. Fukazawa (Hiroshima/SLAC) M. Roterman, P. Valtersson.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
1 GLAST Italian meeting Francesco Longo & Carlotta Pittori Udine 11 marzo 2004 V. Cocco, A.Giuliani, P.Lipari, A. Pellizzoni, M.Prest, M.Tavani. E.Vallazza.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Comparison between BFEM data and G4 simulation October 18, 2001 Balloon Analysis VRVS meeting T. Mizuno, H. Mizushima, Y. Fukazawa, and T. Kamae
GLAST_BGmodel_ ppt Tsunefumi Mizuno 1 Status of the GLAST BG model February 6, 2008 CA-SO Workshop Tsunefumi Mizuno (Hiroshima Univ.)
X-IFU background Simone Lotti INAF-IAPS Roma.
Muon reco. efficiency status: from J/psi to Z T&P Giovanni Petrucciani (UCSD)
Throttle Studies David Wren Analysis Group Meeting 22 March 2004.
O After the integration and test at SLAC/GSFC, BFEM was shipped to National Scientific Balloon Facility (NSBF) at Palestine, Texas. The experiments was.
S. Ritz 1 Onboard Science Processing S. Ritz F-FIDT March 2002.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
I have 6 events (Nch>=100) on a background of ?
Some introduction Cosmics events can produce energetic jets and missing energy. They need to be discriminated from collision events with true MET and jets.
The ALICE Cosmic Ray Physics Program
Background Rejection Prep Work
Update on Muon Flux Underground Using Geant4 Simulation
Calibrating the CAL in flight: Galactic Cosmic Ray Calibration
CS580 Advanced Database Topics
The Surface Muon Source
Fun with DC1: GRB Triggers, Localizations, Etc.
Chemistry Unit Two, Day One.
Background sources update
CALET-CALによる ガンマ線観測初期解析
Update of G4 simulation -- Development of Cosmic-Ray generator --
ACD Analysis Status Work done by Taro Kotani. Much help from Heather. Advice from Ormes, Hartman, Moiseev, Norris, Ritz, Thompson… Main issues: Hermeticity.
Presentation transcript:

Status of Trigger Rate Studies Analysis Group meeting 27 January 2003 D. Wren S. Ritz

2 Moving from pdrApp to GlastRelease: Fluxes and Trigger Rates Purpose: we want to use GlastRelease for background studies –onboard filter development –revisit ground-based background rejection so the first step is to verify the implementation of the background fluxes. => compare with pdrApp Look at backgndmaxpdr (orbit max) and backgndavgpdr (orbit average) composite fluxes: –Compare Fluxes (GlastRelease vs. pdrApp) –Compare L1T rates (GlastRelease vs. pdrApp) Tools: –Use rootplot (within FluxSvc package) to plot fluxes –Use GlastRelease event tuples to get L1T trigger rates

3 Update from Dec 9 meeting Dec 9: Most fluxes look good. Tools Useful Now: Still true Dec 9: Orbit avg and orbit max CR proton fluxes broken (cremeavg and chimemax) Now: Chimemax fixed. Cremeavg broken, but problem found. Should be fixed this week Dec 9: Galactic electrons not implemented Now: Should be implemented this week Dec 9: Nested composite sources not working Now: Working

4 Backgndavgpdr flux plots Last meeting we had this (Gleam v4r1) Now we have this (GlastRelease v0r3) We want to see this (pdrApp) And still need galactic electrons Cremeavg (green) looks better. Nested composite sources now working (lavender). …but backgndavgpdr composite low above.5 GeV (red).

5 backgndavgpdr fluxes from rootplot Flux Type Integrated Flux (kHz/m^2) in GlastRelease Integrated Flux (kHz/m^2) in pdrApp backgndavgpdr 4.2 Breakdown: cremeavg0.94 albedo_proton_avg1.2 albedo_gamma0.92 albedo_electronpositron avg_total X albedo_electronpositron _total 1.1

6 Current Backgndavgpdr L1T Rates – cremeavg is low TotalCremeavgalbedo_p_avgalbedo_gammaelectronavgalbedo_e+e-avg GlastRelease Flux (kHz/m^2) NA1.1 L1T rate (Hz) NA803 L1T (fract) NA0.38 TKR rate (Hz) NA797 CAL-LO rate (Hz) NA10 CAL-LO and NOT TKR NA6 CAL-HI rate (Hz)10901NA0 CAL-HI and NOT TKR NA0 pdrApp* Flux (kHz/m^2) L1T rate (Hz) L1T (fract) TKR rate (Hz) CAL-LO rate (Hz) CAL-LO and NOT TKR CAL-HI rate (Hz) CAL-HI and NOT TKR *Known to be high due to old CAL-LO trigger

7 backgndmaxpdr flux plots Gleam and GlastRelease are similar Galactic electrons not implemented Otherwise, good agreement

8 backgndmaxpdr fluxes from rootplot Flux Type Integrated Flux (kHz/m^2) in GlastRelease/Gleam Integrated Flux (kHz/m^2) in pdrApp backgndmaxpdr 9.9 chimemax4.2 albedo_proton_max2.6 albedo_gamma0.92 electronmaxX0.043 albedo_electronpositron _total 2.2

9 Current Backgndmaxpdr L1T Rates – chimemax fixed Last Time (Gleam)Totalchimemaxalbedo_p_maxalbedo_gammaelectronmaxalbedo_e+e- Flux (kHz/m^2) NA2.2 L1T rate (Hz) NA1782 Now: GlastRelease L1T rate (Hz) NA1598 L1T (fract) NA0.14 TKR rate (Hz) NA1588 CAL-LO rate (Hz) NA17 CAL-LO and NOT TKR NA10 CAL-HI rate (Hz) NA0 CAL-HI and NOT TKR16 00NA0 pdrApp Flux (kHz/m^2) L1T rate (Hz) L1T (fract) TKR rate (Hz)11221 CAL-LO rate (Hz)5297 CAL-LO and NOT TKR1913 CAL-HI rate (Hz)84 CAL-HI and NOT TKR10

Summary Most of the flux components look OK. Tools are very useful. However, do not use GlastRelease for background studies: –Still a problem with orbit avg CR proton fluxes (cremeavg), and CR electron fluxes not yet implemented. Backgndavgpdr is impossibly low above 0.5 GeV in rootplots flux plot. Related to broken cremeavg? Will see in next few days Remaining fluxes to be fixed/implemented within days