Uli Schäfer DCS meeting Oct. 8th 1. Radiation tests 2002Jim Cook 2. CAN branch with Kvaser PCI/CAN cardFernando Varela 3. Readout chain ELMB-OPC-PVSSHelfried.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Control System for the ATLAS Pixel Detector
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Uli Schäfer DCS meeting Feb. 20th, 2001 Subdetector Reports : 1TGCS. Tarem, N.Lupu 2RPCStefano Veneziano 3 MDTHenk Boterenbrood 4 TRTZbyszek Hajduk 5 PixelGreg.
Uli Schäfer, Mainz Univ. / ATLAS L1 Calorimeter Trigger ATLAS L1 Calorimeter Trigger / DCS ATLAS L1 Calorimeter Trigger Overview Signals monitored by DCS.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Dave Mills CANbus: A brief introduction Incorporating: The Fujitsu status Dave Mills Queen Mary, University of London.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Uli Schäfer DCS / standard path CANopen ELMB Host adapter OPC server Ethernet Windows or Linux PC SCADA: PVSSII O O D Software and firmware for standard.
L. Granado Cardoso, F. Varela, N. Neufeld, C. Gaspar, C. Haen, CERN, Geneva, Switzerland D. Galli, INFN, Bologna, Italy ICALEPCS, October 2011.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Overview of the DCS Systems J. Varela, May 6th 2004 Electronics Week – DCS Review.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
C.Combaret, L.Mirabito Lab & beamtest DAQ with XDAQ tools.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
Control in ATLAS TDAQ Dietrich Liko on behalf of the ATLAS TDAQ Group.
J. Varela, LIP-Lisbon/CERN LEADE WG Meeting CERN, 29 March 2004 Requirements of CMS on the BST J. Varela LIP Lisbon / CERN LHC Experiment Accelerator Data.
The Detector Control Power System of the Monitored Drift Tubes of the ATLAS Experiment Theodoros Alexopoulos NTU Athens TWEPP08 September 17, 2008 Naxos,
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
EPICS EPICS Limitations Bob Dalesio Marty Kraimer.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
LHCb front-end electronics and its interface to the DAQ.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Radiation- and Magnet field- Tolerant Power Supply System
The LHCb Run Control System
Tools for the Automation of large distributed control systems
Presentation transcript:

Uli Schäfer DCS meeting Oct. 8th 1. Radiation tests 2002Jim Cook 2. CAN branch with Kvaser PCI/CAN cardFernando Varela 3. Readout chain ELMB-OPC-PVSSHelfried B. 4. Pixel PlansM. Imhäuser 5. Status CAN OPC serverSlava F. 6. DCS backend hierarchyFernando V. 7. Status DDC ( DCS  DAQ )Slava K. 8. Organisational issuesHelfried B.

Uli Schäfer Radiation tests 2002Jim Cook New microcontroller ATmega128L irradiated: Total ionising dose: 25% improvement Functional errors: factor 2 improvement Memory errors: factor 5 improvement Old co-processor not sufficiently rad-hard  New ELMB carries ATmega128L and no co- processor. New ELMB firmware will not require any co-processor  firmware should be more easily re-usable for our applications.

Uli Schäfer CAN branch with Kvaser PCI/CAN card Fernando New CAN card is selected : Kvaser Higher performance, lower cost 6 buses, 32 ELMBs each (12288 channels) read out in 30 s CAN card is not considered a bottleneck any more Recommendations: –do not use more than 32 nodes per CAN bus –all ATLAS use Kvaser card –some recommendations on cables, power supplies…

Uli Schäfer Readout chain ELMB-OPC-PVSS Helfried B. ELMB firmwaredefault settings, calibration readout (periodic, conditional on change,…) OPC serverconversion to physical units (temperatures…) conditional transmission data quality flagged PVSSfine calibration alarms, automatic actions visualisation, archiving interface to DAQ (DDC) Some issues: handling of invalid data and SEE, suppression of constant data in OPC server

Uli Schäfer Status CAN OPC serverSlava F. New version (2.5?) New Kvaser CAN card supported now 2-port and 4-port card Server supports Kvaser / NICAN concurrently OpenHost and CanHost utilities support both cards (programs to send and receive CANopen messages) Some bug fixes Future work: conversion to physical units via configuration file, describe ELMB nodes in c.f., some improvements on error handling and message formats (byte arrays)

Uli Schäfer DCS backend hierarchyFernando V. The DCS backend will comprise of the order of 100 PCs Not a single PVSS-II distributed application but different distributed applications 3 levels Back-End hierarchy: – Global operation(Windows) – Subdetector Control Station (SCS) – Subsystem Control Stations (Win or Linux) ( detailed description of services…) Subdetector description either geographical or functional DCS interfaces to external systems by a dedicated Information Service based on the Data Interchange Protocol (DIP) to be provided by JCOP Data and messages between DCS and DAQ may be exchanged at any level of the DCS hierarchy Commands will only be sent to the SCS level DCS states will be synchronized with the LHC machine states for Physics data taking Calibrations required the synchronization between DCS and DAQ DAQ will be informed of DCS states in real-time via the DDC (see next slide)

Uli Schäfer Status DDC ( DCS  DAQ )Slava K. Transfer of data , messages , commands  between DCS and DAQ Successfully operated in 2002 test beams Development going on Claim to support subdetector activities: Do we see any need for data exchange with DAQ ? (as yet we see our DCS subsystem as a protection of our own valuable hardware only…) OrganisationalHelfried Kvaser cards being purchased, (4-channel, 500€) 2  Mainz Subdetectors meet Helfried before Xmas to discuss requirements and subdetector DCS structure  TDAQ TDR DCS workshop near CERN, spring 2003