Updates: Misalignment, Statistics David Forrest (Happy new year)

Slides:



Advertisements
Similar presentations
Exponential Functions Logarithmic Functions
Advertisements

1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
1 Approaching the Problem of Statistics David Forrest University of Glasgow CM23 HIT, Harbin January 14th.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
1 Downstream PID update Rikard Sandström PID phone conference
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
1 PID Detectors & Emittance Resolution Chris Rogers Rutherford Appleton Laboratory MICE CM17.
1 Configuration Database David Forrest University of Glasgow MICO Meeting 13/10/2008
1 Statistics Toy Monte Carlo David Forrest University of Glasgow.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
Tracker Misalignment Study David Forrest CM23 HIT, Harbin January 14 th.
Emittance Calculation Chris Rogers, Imperial College/RAL Septemebr
Beam Parameter Study - preliminary findings Tim Carlisle.
1 st Study of Tracker Misalignments with G4MICE David Forrest University of Glasgow.
MICE input beam and weighting Dr Chris Rogers Analysis PC 05/09/2007.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
Progress on PID studies Rikard Sandström University of Geneva MICE Analysis meeting.
1 N. Davidson Calibration with low energy single pions Tau Working Group Meeting 23 rd July 2007.
1 Statistics David Forrest University of Glasgow.
1 Chris Rogers MICE Collaboration Meeting 11th Feb 2005 Tracking and Cooling performance of G4MICE.
Stats update Was asked to provide comparison between toy mc and g4mice at two points along z (middle of first and third absorbers) 10,000 events, step.
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
Analysis of MICE Chris Rogers 1 Imperial College/RAL Thursday 28 October, With thanks to John Cobb.
The graphing calculator can be a great checking tool or a fast way to answer a multiple choice question. Example – suppose you graphed the following and.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 Optics/Analysis Update Chris Rogers MICE Software pc 28 April 05.
Offline Software Summary 1M.Ellis - CM25 - 6th November 2009  Release Schedule  Simulation and Analysis Update  Detector software: u CKOV u EMR u KL.
The Initial Problem Chapter 1, Section 1.6 #71 x = 793 x needs to be isolated on the left. Therefore, 341 should be subtracted from both sides: x.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
Tracker Misalignment Study David Forrest University of Glasgow.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Teigh Berg ACM tech news: 12/30/11 Source: Reuters (12/28/11) URL: trains-security-idUSTRE7BR0C
Internal Assessment Processing Data (aspects 2 & 3 of DCP)
MICE input beam weighting Dr Chris Rogers Analysis PC 05/09/2007.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
Configuration Database David Forrest 15th January 2009 CM23, HIT, Harbin.
Writing a Report Questions to ask. Why am I here? Who is the reader and what do they need to know? Imagine an outside examiner with no knowledge of your.
Update Chris Rogers, Analysis PC, 13/07/06. State of the “Accelerator” Simulation Field model now fully implemented in revised MICE scheme Sanity checking.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
© Imperial College LondonPage 1 Tracking & Ecal Positional/Angular Resolution Hakan Yilmaz.
MICE Analysis Code Makeover Chris Rogers 14th September 2004.
1 Statistics David Forrest University of Glasgow May 5 th 2009.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Preliminary Slice Test Track Fitting S. Durkin Sept. 8, 2005 Analyze RunNum1007Evs0to49999.bin using /AnalysisUtilities look for tracks in two separate.
Multi-Step Equations This lesson will look at:
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
G4MICE’s DataQualityCheck application G4MICE’s DataQualityCheck application: Preliminary thoughts Mark Rayner 23 rd February 2010.
Fun With Thread Local Storage (part 3) Peter Ferrie Senior Anti-virus Researcher 2 July,
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
Status of MICE on the GRID  MICE VO u CEs  G4MICE Installation  Example test job  Station QA Analysis  Analysis jobs  File Storage  Documentation.
Error-Correcting Code
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Statistics Update David Forrest University of Glasgow.
1 Configuration Database David Forrest University of Glasgow RAL :: 31 May 2009.
Preliminery results from a 1 st study of misalignment and a fresh look at statistics David Forrest, University of Glasgow.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
This presentation will describe the state of each element in the beam line with regards to the current update being undertaken. Firstly, it will describe.
Mark Dorman – UCL/RAL – Calibration Workshop Talk Update on ND Strip-to-Strip Calibration Work Mark Dorman Calibration Workshop Fermilab, September 7-9.
I have 6 events (Nch>=100) on a background of ?
Database High-Level Overview
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Misalignment Study David Forrest University of Glasgow
Validating Magnets Using Beam
When I opened the XML (note elements only in a DTD), I selected as an XML list and I got the following. This was customer3a.xml and note it said it was.
Question 27.
Word of the Day List nd 9 Weeks.
Presentation transcript:

Updates: Misalignment, Statistics David Forrest (Happy new year)

Misalignment - The 10 pi question (20% cooling beyond whats expected) - sought to rectify by using Chris' Analysis code to insert a covariance matrix as the start of an optimal beam rather than use the Matcher here - can use this code to produce my beam after some initial problems (my geometry files got mangled somehow) - However not quite there yet with this solution (see next slide)

Misalignment Study - Have had some problems (local tech failures outside MICE) with grid storage and ganga job processing in last few weeks. Have helped to overcome these. - I mean to present a misalignment study comprised of examples of undeviated beams with plus and minus misalignments on the same graph as that unmisaligned beam. I mean to do this with the same seeds so that ignoring cuts, the effect of misalignment should be isolated from the effect of statistics. I think this is the only way you can hope to say anything sensible about it.

Statistics Am prioritising it like Misalignment, Database and then Statistics at the moment. Assume that error on fractional emittance goes with 1 over sqrt(N), where N is the number of events. Will aim to plot for K the constant of proportionality between the sigma on fractional emittance change and N. Should get K for a range of beams. Side note: Hope to present news of first successful reconstruction of some element of a MICE geometry in G4MICE from database, something that may be of interest to Analysis people as time goes on.

Appendix The oft delayed note on grid jobs is virtually done. If nothing else I will get this done on the plane. Just need to check the syntax, some of which has changed. Will be issued between 11 th and 22nd!