EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.

Slides:



Advertisements
Similar presentations
Teaching materials to accompany:
Advertisements

Teaching materials to accompany: Product Design and Development Chapter 11 Karl T. Ulrich and Steven D.Eppinger 2nd Edition, Irwin McGraw-Hill, 2000.
Advanced Energy Vehicle (AEV)
Software Project Management
Teaching materials to accompany:
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2008 Rochester Institute of Technology All rights reserved.
R. I. T Mechanical Engineering Engineering Design Brief Case Study: What is the Engineering Design Process and Why is it Critical? Rochester Institute.
Product Design L5- Ch4: Product Specifications Dr. Husam Arman 1.
chapter 7 Product McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved.
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2008 Rochester Institute of Technology All rights reserved.
Opportunity Identification
Product Design L6- Ch7: Concept selection
1 Human-Centered Design I Presented by: Craig Titus EPICS High Workshop – Summer 2010 Lecture: Human-Centered Design Presented By: Craig Titus.
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.
EDGE™ Functional Decomposition and Concept Generation - MSD I Workshop 3 prepared by Prof. Margaret Bailey (ME) Copyright © 2007 Rochester Institute of.
1 2-1 McGraw-Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Teaching materials to accompany:
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.
EDGE™ Functional Decomposition and Concept Generation prepared by Prof. Margaret Bailey (ME) Copyright © 2007 Rochester Institute of Technology All rights.
Development Processes and Product Planning
Systems Engineering Management
1Concept Selection Jonathan Weaver UDM ME Department.
Development Processes and Organizations
Teaching materials to accompany:
Teaching materials to accompany:
Development Processes and Organizations
Feasibility and Business Planning
Teaching materials to accompany:
Identifying Customer Needs
Teaching materials to accompany:
Teaching materials to accompany:
Product Specifications
 How to choose the best concept?  How to decide as a team?  How to document the process?
Decision Making Matrix
Concept Selection Product Design and Development Chapter 7 Karl T. Ulrich and Steven D. Eppinger.
1 Rev: 02/12/2007 MSE-415: B. Hawrylo Chapter 8 Concept Testing MSE-415: Product Design Lecture #5.
Concept Evaluation/Selection Dept. of Aerospace Engineering IIT Bombay AE 207 Introduction to Engineering Design.
Concept Evaluation and Selection… Integrated Product and Process Design ME En 475/476.
Product Design for Manufacturability and Automation
Software Engineering Management Lecture 1 The Software Process.
Student Growth in the Washington State Teacher Evaluation System Michelle Lewis Puget Sound ESD
First-Year Engineering Program Advanced Energy Vehicle Topics: AEV Design Concept Screening and Scoring.
Concept Selection Teaching materials to accompany: Product Design and Development Chapter 7 Karl T. Ulrich and Steven D. Eppinger 2nd Edition, Irwin McGraw-Hill,
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
R. I. T Mechanical Engineering March 4, 2013 Design Project Management Lecture 1: Introduction, projects, team behavior Rochester Institute of Technology.
Chapter 12 EIN 6392, Product Design summer 2012
Chapter 7 Concept Selection.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Fall 2015 ECEn 490 Lecture #8 1 Effective Presentations How to communicate effectively with your audience.
Product Specifications Teaching materials to accompany: Product Design and Development Chapter 5 Karl T. Ulrich and Steven D.Eppinger 2nd Edition, Irwin.
Fall Last Homework assignment −Complete the FSD. Due Today. Put on website and a copy to me. −Work on the Concept Generation portion of the.
Identifying Assessments
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Tata McGraw CHAPTER 4 Product and Service Design.
New Product Development Management NPDM 6 Mohsen SADEGHI Department of Graduate School of Management and Economics Sharif University of Technology.
Concept Generation Teaching materials to accompany: Product Design and Development Chapter 6 Karl T. Ulrich and Steven D. Eppinger 2nd Edition, Irwin McGraw-Hill,
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 9: Systems architecting: Principles (pt. 3) ISE 443 / ETM 543 Fall 2013.
Chapter 4 Gaining Strategic Value from Information
Concept Development & Selection
Concept Development & Selection
Product Specifications
MINGGU KE 9: PROSES DESAIN PRODUK BARU
PRODUCT SPECIFICATIONS chapter FOUR
CONCEPT SELECTION chapter SIX
Chapter 7 Concept Selection
Chapter 12 EIN 6392, Product Design Fall 2009
Product Design for Manufacturability and Automation
Chapter 2: Development process and organizations
Presentation transcript:

EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.

EDGE™ Today’s Workshop Overview 10am –11:30AM Interactive Exercise on Concept Development & Selection10am –11:30AM Interactive Exercise on Concept Development & Selection 11:30 – 1:00 PMConcept Development & Selection on Team Project11:30 – 1:00 PMConcept Development & Selection on Team Project 2:00 – 3:30Continue Selection Process:2:00 – 3:30Continue Selection Process: Concept Scoring, Customer Feedback 3:30 – 4 PMCreate Summary of Activities3:30 – 4 PMCreate Summary of Activities By 4:30 PMReview Team Concept Development and Selection Activities with GuideBy 4:30 PMReview Team Concept Development and Selection Activities with Guide

EDGE™ Session Overview Introduce Concept Development & Selection ProcessIntroduce Concept Development & Selection Process Explore Two-Stage MethodologyExplore Two-Stage Methodology Demonstrate Above Steps on ExampleDemonstrate Above Steps on Example Discuss Common Dysfunctions Associated with this PhaseDiscuss Common Dysfunctions Associated with this Phase Apply Concept Development & Selection Process to Team SD1 ProjectApply Concept Development & Selection Process to Team SD1 Project

EDGE™ Concept Development & Selection Session Learning Objectives 1.Understand concept selection matrix - commonly used decision tool in product development 2.Reinforce importance of concept selection within product development process 3.Explore the application of a selection matrix method for selecting & developing product concepts – can be applied to sub-systems as well.

EDGE™ Concept Selection Example: Reusable Syringe Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-1, Chapter 7, 3 rd Edition, Irwin McGraw-Hill

EDGE™ Concept Selection Example: Reusable Syringe Design an improved, reusable syringe with precise dosage control for outpatient use.Design an improved, reusable syringe with precise dosage control for outpatient use. –Current product was too costly and inaccurate Seven criteria identified based on customer needsSeven criteria identified based on customer needs –Ease of handling, use and manufacture –Readability of dose settings and accuracy –Durability and portability Seven overall product concepts proposed (Exhibit 7-3)Seven overall product concepts proposed (Exhibit 7-3)

EDGE™ Concept Development & Selection Process Perform Economic Analysis Benchmark Competitive Products Build and Test Models and Prototypes Identify Customer Needs Establish Target Specifications Generate Product Concepts Select Product Concept(s) Set Final Specifications Plan Downstream Development Mission Statement Test Product Concept(s) Development Plan Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-2, Chapter 7, 3 rd Edition, Irwin McGraw-Hill These activities can occur throughout the design process!

EDGE™ Concept Ratings Selection Criteria Winning Concept(s) Concept Development & Selection Process Goal: The goal is not to select the best concept but to develop the best concept by combining and/or refining Concepts Screening Stage Scoring Stage

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-4, Chapter 7, 3 rd Edition, Irwin McGraw-Hill

EDGE™ Examples of Concept Generation Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-3, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Concepts need to be well-defined PRIOR to concept evaluation! (neither of these concepts made the screening cut)

EDGE™ Concept Selection Process Prepare the Matrix Rate Concepts Rank Concepts Combine and Improve Select Best Concept Reflect on the Process Screening Stage Screening Stage Scoring Stage Scoring Stage Prepare the Matrix Rate Concepts Rank Concepts Combine and Improve Select Best Concept Reflect on the Process

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-4, Chapter 7, 3 rd Edition, Irwin McGraw-Hill

EDGE™ Screening Stage Prepare the Matrix – Pugh's METHODPrepare the Matrix – Pugh's METHOD –Criteria –Select Reference Concept Rate ConceptsRate Concepts –Scale (+ – 0) –Compare to Reference Concept Rank ConceptsRank Concepts Combine and ImproveCombine and Improve –Remove Bad Features –Combine Good Qualities Select Best ConceptsSelect Best Concepts –May Be More than One –Beware of Average Concepts Reflect on the ProcessReflect on the Process –Continuous Improvement Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-5, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Concepts which made the first cut BUT more refinement required before SCORING process

EDGE™ Identify “Winning” Concepts Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-3, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Concept A has highest net score and no “worse than” ratings

EDGE™ Combine Winning Concepts Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-3 and 6, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Concepts D & F were combined to eliminate “worse than” ratings

EDGE™ Refine Winning Concepts Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-3 and 6, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Concept G’s scored well but ease of handling was a problem, therefore revise!

EDGE™ Screening Stage for SD1 Project NOWNOW –Select a sub-system (or overall product if applicable) –Prepare the Matrix –Begin the following as time allows This afternoon:This afternoon: –Rate Concepts –Rank Concepts –Combine and Improve –Select Best Concept –Reflect on the Process

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-4, Chapter 7, 3 rd Edition, Irwin McGraw-Hill

EDGE™ Scoring Stage REFINE Pugh’s MatrixREFINE Pugh’s Matrix –Criteria –ADD Weightings Rate ConceptsRate Concepts –REFINE Scale (1 - 5) –Select “Average” Criteria for Reference –Compare to Reference Criteria Rank ConceptsRank Concepts –Sum Weighted Scores Combine and ImproveCombine and Improve –Remove Bad Features –Combine Good Qualities Select Best ConceptsSelect Best Concepts –May Be More than One Reflect on the ProcessReflect on the Process –Continuous Improvement Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-7, Chapter 7, 3 rd Edition, Irwin McGraw-Hill

EDGE™ Example: Concept Scoring Example: Concept Scoring Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-7, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Generated from Customer Needs – week 1 Need to revisit PUGH Matrix as your team’s knowledge base expands

EDGE™ Final Winning Concept - DF Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-6, Chapter 7, 3 rd Edition, Irwin McGraw-Hill Concept DF was selected as the winning concept HOWEVER: Do not simply select concept was highest rating – conduct a sensitivity study by varying weights and ratings and examine effect on winning concept rating. Does uncertainty about a particular value have a large impact on the winning concept? Team could have decided to go with top two (or more) concepts. Concepts could be prototyped and tested for customer feedback.

EDGE™ Tips for Concept Development & Selection When possible, use objective rather subjective criteriaWhen possible, use objective rather subjective criteria Useful to identify strengths of concepts that do not make it through screening/scoring stages – could these be incorporated on winning concept(s)?Useful to identify strengths of concepts that do not make it through screening/scoring stages – could these be incorporated on winning concept(s)? Include ease of manufacture, reduced liability, and/or cost as criteriaInclude ease of manufacture, reduced liability, and/or cost as criteria Use concept development & selection process throughout SD1 and SD2Use concept development & selection process throughout SD1 and SD2

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 7-4, Chapter 7, 3 rd Edition, Irwin McGraw-Hill

EDGE™ Test Product Concepts Perform Economic Analysis Benchmark Competitive Products Build and Test Models and Prototypes Identify Customer Needs Establish Target Specifications Generate Product Concepts Select Product Concept(s) Set Final Specifications Plan Downstream Development Mission Statement Test Product Concept(s) Development Plan Karl T. Ulrich and Steven D. Eppinger, 2004, Product Design and Development, Exhibit 8-2, Chapter 8, 3 rd Edition, Irwin McGraw-Hill Helps in further exploring concepts… Which concept should be pursued? How can the concept be improved to better meet customer needs? Should development continue? TOOL: Survey customer response, refer to Chapter 8 for more details

EDGE™ Practice Concept Development & Selection on SD1 Project Continue Team Screening Stage and start Scoring StageContinue Team Screening Stage and start Scoring Stage Prepare/Refine the Matrix Rate Concepts Rank Concepts Combine and Improve Select Best Concept Reflect on the Process Screening or Scoring Stages Screening or Scoring Stages Sample Excel Spreadsheet Available for PUGH

EDGE™ Rest of the Day…. Start with Concepts Associated with Critical Sub-function(s) Identified During Week 3Start with Concepts Associated with Critical Sub-function(s) Identified During Week 3 –Develop Pugh's Matrix for SCREENING Process Create Criteria, Select Reference Concept, Rate Concepts (Scale (+ – 0)), Compare to Reference Concepts, Rank Concepts,Create Criteria, Select Reference Concept, Rate Concepts (Scale (+ – 0)), Compare to Reference Concepts, Rank Concepts, Combine and Improve, Remove Bad Features, Combine Good Qualities, Select Best ConceptsCombine and Improve, Remove Bad Features, Combine Good Qualities, Select Best Concepts Refer to Exhibit 7-5Refer to Exhibit 7-5 –Refine Pugh's Matrix during SCORING Process Refine Criteria, ADD Weightings, Rate Concepts (Scale (1 - 5)), Select “Average” Criteria for Reference, Determine Sum Weighted ScoresRefine Criteria, ADD Weightings, Rate Concepts (Scale (1 - 5)), Select “Average” Criteria for Reference, Determine Sum Weighted Scores Combine and Improve, Remove Bad Features, Combine Good Qualities, Select Best ConceptsCombine and Improve, Remove Bad Features, Combine Good Qualities, Select Best Concepts Refer to Exhibit 7-7Refer to Exhibit 7-7 –Get customer feedback, if possible

EDGE™ Next Week Complete concept selection process (quickly)Complete concept selection process (quickly) Begin system level design: architecture, sub- system definition, interface definitionBegin system level design: architecture, sub- system definition, interface definition Schedule and prepare for Design Review ISchedule and prepare for Design Review I

EDGE™ Weeks 5 - 7: Design Review I 30% of SD1 Grade30% of SD1 Grade In-depth meeting(s) with Guide, Consultant(s), peers, customer(s), and appropriate expertsIn-depth meeting(s) with Guide, Consultant(s), peers, customer(s), and appropriate experts Minimize “presentation”, maximize value- added discussion (see Guidelines on EDGE)Minimize “presentation”, maximize value- added discussion (see Guidelines on EDGE)

EDGE™ Design Review I - Grading Rubric

EDGE™ Design Review I - Content Discuss concept selection & improvement processDiscuss concept selection & improvement process System-level design: architecture, subsystems, interfacesSystem-level design: architecture, subsystems, interfaces Identify high-risk technologies and perform enough modeling and/or simulation (computer-based or physical mock-up) to demonstrate that the project can be successfulIdentify high-risk technologies and perform enough modeling and/or simulation (computer-based or physical mock-up) to demonstrate that the project can be successful –may include features such as new technology, previously untested technology, long-lead time or prohibitively expensive components Additional specific requirements should be agreed on with GuideAdditional specific requirements should be agreed on with Guide TEAM Goal: get useful feedback from reviewersTEAM Goal: get useful feedback from reviewers