Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.

Slides:



Advertisements
Similar presentations
Bardia Baheri Rotary High Voltage Motor Physics project.
Advertisements

© Good Hifi 2007 Glue rings to the back A manual.
Chapter 1 My Dad’s Home I don’t remember this place, I thought. It isn’t home. Not my home. My home is far away, in New Zealand. With Mum. This is a.
Today’s report LIU Qian. We made labels for each fiber. The labels show the PMT’s number corresponding to the fiber. This lable means: east side # inside.
Module 4 Lesson 1.
Getting Started With Alice By Ruthie Tucker under the direction of Prof. Susan Rodger Duke University, July
Sandblasted, repainted fender brackets. Mudflaps and rubber buttons to attach them.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
OIL LEAK TECH TIP This test can only be done as described in this tech tip We will show you how to identify oil leaks in 3 different ways 1.Smoke 2.Bubbling.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
Warm-ups Find each product. 1. (x – 2)(2x + 7) 2. (3y + 4)(2y + 9) 3. (3n – 5)(n – 7) Factor each trinomial. 4. x 2 +4x – z z + 36.
Factoring Quadratic Expressions ax 2 + bx + c. 2x2x 3x3x +3 – 4 Setting the Stage Do you remember how to multiply these together? (Referred to as FOIL.
Earthquake Depths Lab. STEP 1 – trace the map (I photocopied mine and cut that out instead)
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.
Bad Fibers LIU Qian. Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into.
Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.
Second Grade English High Frequency Words
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
Printing From Your Black & White Film Enlarger to Projection Print Your Negative onto Paper 4-in-1 Printing Easel for your RC paper Timer for the enlarger.
Reported Speech Roll No Presented By:- Class: Ixth “A”
By: Jabor Al-kuwari 6A: Lesson 1: I have went into the workshop with the walls and the room on a top view. I took a ruler to measure the sizes of the walls.
In this lesson you will learn how to tell what time it is when
Ergonomic Fix Ergonomics team changed design of part to completely eliminate this hazard No change in cost of part & cost savings of labor alone is $25,000.
Classroom English Jeff Wang Jeff Wang Yueyang Radio and Television University.
My name is _____. I ride a bus to school
Multiplying Whole Numbers and Decimals Lesson 2-2.
I am ready to test!________ I am ready to test!________
3D Model of Recycling “Robot” By Begimai and Noura 9BB.
PHOBOS TOF Construction Status
How Garfield and Odie Saved Christmas. One Christmas Eve, Garfield was doing his daily routine, laying around and eating chocolates, when he discovered.
Once upon a time, there was a family of bunnies. There was one young bunny named Bobby, and his parents, Mr. and Mrs. Bunny.
Equal Additions I am learning to solve subtraction problems by equal additions that turn one of the numbers into a tidy number. Numbers like 10, 20, 30,
Improvements Needed Post “Safety Lab” Most students lost points from the “General Record-Keeping Procedures” section. Better titles are needed: – The title.
The Monkey and the Pig. Once upon a time in Japan, a man had a monkey. People paid to see the monkey dance.
TALKING ABOUT PLANS AND ACTIVITIES Study each of the dialogues below : A : What is all this paint for ? Are you going to paint your house ? B : No, we.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
OIL LEAK TECH TIP This test can only be done as described in this tech tip We will show you how to identify oil leaks in 3 different ways 1.Smoke 2.Bubbling.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Kelsey Rudinski. My name is Diamond Jackie. Jack for short. You are reading this because I am now famous. I traveled west in 1849 and robbed people of.
Mrs. Roman’s Middle School Survival Guide Homework Doing your homework in middle school is very important. You may have homework every night. Even though.
High Frequency Words August 31 - September 4 around be five help next
Who Will Buy?. Who will buy this wonderful morning? Such a sky you never did see. Who will tie it up with a ribbon, And put it in a box for me? So I can.
How to play chess? By Mervyn George. The Rules of the Game White always move first White always move first You should always play touch a piece move a.
Sight Words.
Testing of C-layer bottom hole counters A.Ito, J.Negret, B.Satyanarayana.
To view this in “presentation” mode, go to Slide Show  View Show (the toolbar at the top of the page) Use the “Enter” key to advance to the next slide.
Indicator: : Measure and mix dry and liquid materials in prescribed amounts, following reasonable safety precautions. Taken From:
CSP News at Noon Country Side Productions. Nick ~ Hello and welcome to CSP news at noon. Cameron ~ In news, first we have a fire that started around 3.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
How to Install a New Car Starter By Cole Johnston In this slideshow you will learn how to properly and safely install a new car starter.
Leilehua High School Library Orientation. Library Staff  Mrs. Lau  Mrs. Maruyama  Mrs. Rabe  Mrs. Yamamoto.
CALO News Pascal Perret LPC Clermont 22 January 2012.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
ECAL LED monitoring system upgrade status 04/09/20131.
WELCOME TO THE FIRST DAY OF SCHOOL! I’m so excited to have you in my class!
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
ESSENTIAL WORDS.
Plans for this week MWPC: wire stretching today
Earthquake Depths Lab.
Karate Spelling Challenge
Complex Knowledge: demonstrations of learning that go aboveand above and beyond what was explicitly taught. Knowledge: meeting the learning goals and.
Welcome to the Second DAY!
Presentation transcript:

Nov. 7 report LIU Qian

This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut layer 6 We have remove the white tape, now it is easier to tie the fibers on PMT.

But the inner TOF’s fiber must come out from there. The inner one is a little difficult to do. It took us about 5 mins to tie it. Start from here Rotate Out from here

The most difficult one is “outside 6”.

“outside 6” PMT is totally blocked by this. It took us about half an hour to install it!!! This one is “outside 6”

There are totally 8 PMTs are blocked. But we know how to do it now.

Tonight, we tested the 6 fibers installation. (There were something wrong with the TOF electronics, and were not fixed until night.) Pulse generator Readout from west side LED Box Fibers in tube

The 6 fibers’ installation is successful! Blue one is pulser generate as triger Yellow one is TOF signal, 900V.

Totally, we have cleaned 21 bundles. During the cleaning, we found that: 1. Fiber 42-D’s cap is stuck. We can not even see the white plastic tube. Then I tried to remove the cap, and rotated the cap very slowly, but the fiber head fell suddenly. (This picture is took before I rotated the cap) But the fiber is not broken: I glued the fiber head back, opened the cap and checked it with LED Box, the fiber is not broken. Anyway this fiber won’t be installed, I’ll use an extra fiber instead it.

2. There are some glue on some fibers’ head. We have to clean these fibers again. (I tried to take some picture from the microscope, but I failed. So no picture is shown)

Summary: 1.21 bundles fibers are cleaned bundles fibers are put in the protected tube. 3.6 fibers are installed successfully. We wasted almost whole daytime to wait the TOF electronics ready. And we have to waste another two hours tomorrow (8:00~10:00 am) since they will remove the rail. But we have only 3 days left. I’m worrying now. But now, my teammates and I have known how to install fibers (including the most difficult one); fiber installation test system is ready; the preparation is almost done. We’ll see.