Beam Position Monitors MICE CM Harbin January, 2009.

Slides:



Advertisements
Similar presentations
BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
Advertisements

Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
1Beam Line Review. 17th November Detector parameters Fermilab Beam line monitors built to replaced SWICS Scintillating fibre tracker – readout.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Belle II numbering x y z x y z. Electronics mapping (rawdata) row: carrier level, 0-3. column: daughter card slot, 0-3. channel: channel on ASIC, 0-7.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
Downstream transversal sizes Rikard Sandström University of Geneva MICE detector meeting.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
CMPB Alain Blondel 14 April STATUS OF MICE.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
ICD Energy Calibration Andy White January 16, 2002.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
Multipixel Geiger mode photo-sensors (MRS APD’s) Yury Kudenko ISS meeting, KEK, 25 January 2006 INR, Moscow.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Khaled Belkadhi (LLR-Ecole Polytechnique)1 DHCAL Test Beam Results using Full Train Reconstruction Khaled Belkadhi.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
FTOF Status Anton A. Izotov, Frascati
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Spectrometer Solenoids Step IV running
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Detector status and commissioning: LUCID
Luminosity Monitor Status
LHCf – CSN1 Trieste O. Adriani
ScECAL+AHCAL+TCMT Combined Beam FNAL
TC status & remaining tasks
Use of Beam Loss Monitor type detectors in CNGS muon station
Status of the Crystal Ball
Scintillator tile- SiPM systems R&D
Beam Halo Considerations for Back Angle Running
Presentation transcript:

Beam Position Monitors MICE CM Harbin January, 2009

Beam Monitors  Small (20 X 20 cm)  Large (45 X 45 cm)

Fiber Planes  Active detector is Kuraray scintillating fiber (blue)  Fiber planes are doublet structure like fiber tracker

Material Budget 4 X 0.9 X 0.7 mm polystyrene

Fiber Mapping Small: 64 ch – 3 fiber wide Large: 16 ch – 3 fiber wide 48 ch – 8 fiber wide

Fiber Connector

Small BPM Fiber Planes

Commissioning Status  The Electronic Noise that was seen has now been completely removed u Cable shielding  Both BPMs have been calibrated to some extent with a 60 Co source u However the activity was so low that we had some difficulty  Final calibration with beam was, unfortunately, not done due to the Target failure in December  We did get some beam data with the small BPM, however

Beam Data in Small BPM  Beam data from November run  Dip if Y profile we believe is now fixed after we did the threshold scan/set using the 60 Co source  Once we have beam again, we will continue the calibration (both threshold and PMT HV)  We have also asked for a stronger (100X) 60 Co source

Small BPM Beam Data II

Conclusions  Both the small and the large BPM are working well u No dead channels u Electronic noise rate is ZERO u PMT noise is low - <<1 hit/channel  The small BPM has taken beam data u At that time there was a dip in the response in the Y view s We believe that this is now fixed by adjusting thresholds  The large BPM has been calibrated with the 1  C 60 Co source u It has not seen beam yet  Look forward to doing final calibration with beam in May?  Will also do addition calibrations with 60 Co, if we can get a 100  C source