By Matthew Patterson. L ow E arth O rbit N anosatellite I ntegrated D istributed A lert S ystem.

Slides:



Advertisements
Similar presentations
Unit 3, Chapter 9, Lesson 9: Space Systems Engineering 1 The Systems-engineering Process Trading Requirements We use the requirements loopa necessary and.
Advertisements

Understanding the Systems Engineering Process
ISIS Turnkey Missions ISIS designs, manufactures, launches and operates affordable, capable, nanosatellites ISIS provides turnkey missions for institutional,
Michael Segalla and Cole Skinker Advisor: Bob Bruninga AIAA YPSE Conference November 7, 2014.
EE580 – Solar Cells Todd J. Kaiser
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Introduction to Space Systems and Spacecraft Design Space Systems Design Power Systems Design -I.
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
MAXIM Power Subsystem Diane Yun Vickie Moran NASA/GSFC Code (IMDC) 8/19/99.
Presented by Matthew Patterson. Mission Conceptualize a satellite to dramatically reduce time and cost Provide a Multi-Mission platform Provide a Unique.
NEW ARRIVAL POWER ELEKTRO MEGIC BOX POWER ELEKTRO ENGINEERING COMPANY (PVT) LIMITED.
Photovoltaic Solar Cells and Solar Energy Systems for Home Usages Mohammad Anisuzzaman.
Space Engineering Institute (SEI) Space Based Solar Power Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University.
1 Electrical Power System By Aziatun Burhan. 2 Overview Design goal requirements throughout mission operation: Energy source generates enough electrical.
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Life in the Atacama, Design Review, December 19, 2003 Carnegie Mellon Solar array design Life in the Atacama Design Review December 19, 2003 J. Teza Carnegie.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Noah Garcia-Galan *Some information in this presentation comes from outside sources.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Proposed Approach  Research available commercial satellite communications services  Explore viable battery technologies  Investigate GPS receiver functionality.
LSU 06/04/2007Electronics 51 Power Sources Electronics Unit – Lecture 5 Bench power supply Photovoltaic cells, i.e., solar panel Thermoelectric generator.
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
1 Formation Flying Shunsuke Hirayama Tsutomu Hasegawa Aziatun Burhan Masao Shimada Tomo Sugano Rachel Winters Matt Whitten Kyle Tholen Matt Mueller Shelby.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
KUMU A’O CUBESAT Amy Blas. Background 2 What is CubeSat?  10x10x10 centimeter cube  Launched in lower earth orbit (LEO)  The project started last.
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
Charging Dock & Power Control Sustainable Energy Systems for Education P The Portable High-Power Density Energy System project (P11401), which preceded.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
By: Christiano Daniel Abadi. Deliverables/Achievements in Spring 2000: 8 Systems Engineering Documents Overall and power budgets Gantt Chart for Preliminary.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Hanita Contribution Grenoble, Annex65 Kick-off Meeting Hanita Coatings - Dr Yoash Carmi Grenoble, September 2014.
By P.Pranavi Beyond Night Sky. 1957TILL DATE Beyond Night Sky.
Student Satellite Project Power Generation and Distribution 1 Power Generation and Distribution WINTER ’99 REVIEW Chieh-Kuen Woo Team Leader.
University Nanosat Competition Embry-Riddle Aeronautical University: SWESat Team Presented by: Stephanie Lengyel AZ Space Grant Symposium April 17 and.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
1 Laser Swarm EPS Final Design Solar panel hold down and release mechanism Solar panel deployment Pointing driver Bus regulation Battery Solar panels Summary.
Inphase III, Implementation is the main task to be done, starting from the converters designed and simulated in phase II and, going through tests of these.
EDSGN 100 SECTION 18 PROF. ANDY LAU (JS) 2 DECEMBER 9, 2010 No Grid Telecom Base Station Energy Storage System GE Transportation NAKURU.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 EPS—Design Lesson 20 Spring 2005.
INNOVATION BUS GROUP:INNOTHENTICTECH PHASE 1 REFURBISHED BUS THIS PRESENTATION CONCETRATES ON POWER SUPPLY AND LOADS ONLY.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino 1.
Power Systems Design Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Power Systems Design Definitions of energy and power Power generation.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
Amy Blas Hawaii Space Flight Laboratory University of Hawaii.
K UMU A ’ O C UBESAT Amy Blas March 7, W HAT IS C UBE S AT ? 10x10x10 centimeter cube Launched in lower earth orbit (LEO) Started last semester.
QTYUIOP THERMIONIC SPACE POWER THE EMERGING SOURCE OF SPACE POWER IN THE NEXT DECADE AUBURN UNIVERSITY AUGUST 17, 1999.
Wayfarer Ryan Stelzer Dr. David Gaylor April 16 th, 2016 Arizona Space Grant Symposium.
Length The distance between two points. The red line is 4 millimeters more than 3 centimeters long. 3.4 cm 34 mm.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Spacecraft Technology Structure
Electrical Basics Power & Ohm’s Law.
Photovoltaic and Battery Primer
Photovoltaic and Battery Primer
Preliminary Platform Design for KuaFu-A
Spacecraft Power Systems
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
Power Electronics Research at Seoul National University
Photovoltaic (PV) Systems
Matthew Prevallet 4/26/16 Arizona/NASA Space Grant Symposium
Leonidas.
Presentation transcript:

By Matthew Patterson

L ow E arth O rbit N anosatellite I ntegrated D istributed A lert S ystem

Why focus on Nanosats? –The cost and time to design, develop and complete an entire mission for typical large satellites is enormous. –Microsatellites and Nanosatellites allow quicker mission overturn. –Risk for missions are reduced –Provide a means to test new scientific technologies –Because we have the ability to complete an entire mission from concept design to launch –The cost and time to design, develop and complete an entire mission for typical large satellites is enormous. –Microsatellites and Nanosatellites allow quicker mission overturn. –Risk for missions are reduced –Provide a means to test new scientific technologies –Because we have the ability to complete an entire mission from concept design to launch

The LEONIDAS Team Project Director-Dr. Luke Flynn Principal Investigator- Lloyd French Project Director-Dr. Luke Flynn Principal Investigator- Lloyd French Aukai Kent – Payloads Dennis Dugay - Communications Matt Patterson - Power Zachary Lee-Ho - Systems Engineer Jennie Castillo – Orbits Kaipo Kent – Thermal Lynette Shiroma - Attitude & Control Minh Evans – Command & Data Handling Mike Menendez - Structure and Mechanical Devices

What have we accomplished? Learned the basic concepts in mission design and development Developed a mission concept report for the LEONIDAS BUS Prepared proposal for Air Force Office of Scientific Research University Nanosatellite Competition Presented our mission design to Jet Propulsion Laboratory and Ames Learned the basic concepts in mission design and development Developed a mission concept report for the LEONIDAS BUS Prepared proposal for Air Force Office of Scientific Research University Nanosatellite Competition Presented our mission design to Jet Propulsion Laboratory and Ames

Mission Objectives –We will send a microsatellite into a LEO, sun-synchronous, polar orbit –The microsatellite will serve as a platform for demonstrating scientific technologies –Data attained through the operations of the scientific technology payloads will be transmitted to the ground station –The development, manufacturing and launching of the satellite will serve as an educational tool for aiding the development of students at the University of Hawaii at Manoa –We will send a microsatellite into a LEO, sun-synchronous, polar orbit –The microsatellite will serve as a platform for demonstrating scientific technologies –Data attained through the operations of the scientific technology payloads will be transmitted to the ground station –The development, manufacturing and launching of the satellite will serve as an educational tool for aiding the development of students at the University of Hawaii at Manoa

Plug and Play Bus

Mission Requirements Satellite must accurately point and orient itself to take a picture of Hawaii Satellite shall be robust and reliable –This will be accomplished through: Minimizing the use of mechanical devices The use of COTS components and interfaces Operation of payloads or communication with ground station will be accomplished within the 14 minute viewing window of each orbit. Cost of components must not exceed ~ $500k –Cost estimation does not reflect the cost for structure and sublimation thrusters All scientific demonstrations will be performed within the projected mission lifetime of six months The shall be sufficient amount of battery power to operate the satellite for a duration of 12 hours, in the event the photovoltaics should fail. Satellite must accurately point and orient itself to take a picture of Hawaii Satellite shall be robust and reliable –This will be accomplished through: Minimizing the use of mechanical devices The use of COTS components and interfaces Operation of payloads or communication with ground station will be accomplished within the 14 minute viewing window of each orbit. Cost of components must not exceed ~ $500k –Cost estimation does not reflect the cost for structure and sublimation thrusters All scientific demonstrations will be performed within the projected mission lifetime of six months The shall be sufficient amount of battery power to operate the satellite for a duration of 12 hours, in the event the photovoltaics should fail.

Power Regulation and Distribution

Power Management and Distribution Objective: –To provide, store, distribute, and control the satellites power at Beginning of Life (BOL) and End of Life (EOL). Key Requirements: –To provide a continuous source of power to loads and subsystems through out the mission life (6 months – 1 year). –Support and distribute different voltages (3, 5, +-12, 28V) to variety of loads. –Provide enough power to support peak electrical load and provide enough power at total loss of solar cells for 12 hrs. –Protect against failures in the System. –Fit volume and weight budget: 20x27x11[cm 3 ], 4.1 kg Objective: –To provide, store, distribute, and control the satellites power at Beginning of Life (BOL) and End of Life (EOL). Key Requirements: –To provide a continuous source of power to loads and subsystems through out the mission life (6 months – 1 year). –Support and distribute different voltages (3, 5, +-12, 28V) to variety of loads. –Provide enough power to support peak electrical load and provide enough power at total loss of solar cells for 12 hrs. –Protect against failures in the System. –Fit volume and weight budget: 20x27x11[cm 3 ], 4.1 kg

Sun Earth Space Batteries Shunts PV PRUPDU TT&C C&DH ACS Thermal Payloads

PV: Ultra Triple Junction Cells GaInP/GaAs/Ge (Gallium Indium diphosphate/Gallium Arsenide/Germanium) Bare Cells –Weight = mg –Dimensions =.5 x.22 (m) –Thickness = ~ mm Operating Temperature range = (0˚C – 75 ˚C) –For every degree off, degrades by.5% UTJ (Ultra Triple Junction) Solar Cell –BOL average efficiency = 28.3% –EOL average efficiency = 24.3% –Degrades.8% per year BOL W/m 2 (average solar illumination intensity) = W/m 2 –Power of Sat : 386 W/m 2 x.114 m 2 = 44 W per panel –Peak Power output of solar panels (ideal 3 panels) = W EOL (5 year lifetime) = W/m 2 –Power of Sat = 37.9 W per panel –Peak Power output of solar panels = W Bare Cells –Weight = mg –Dimensions =.5 x.22 (m) –Thickness = ~ mm Operating Temperature range = (0˚C – 75 ˚C) –For every degree off, degrades by.5% UTJ (Ultra Triple Junction) Solar Cell –BOL average efficiency = 28.3% –EOL average efficiency = 24.3% –Degrades.8% per year BOL W/m 2 (average solar illumination intensity) = W/m 2 –Power of Sat : 386 W/m 2 x.114 m 2 = 44 W per panel –Peak Power output of solar panels (ideal 3 panels) = W EOL (5 year lifetime) = W/m 2 –Power of Sat = 37.9 W per panel –Peak Power output of solar panels = W

Rechargeable Lithium-ion Battery Characteristics –Height =.065 m –Width =.060 m –Thickness =.0196 m –Weight =.153 kg –Energy = 26 Wh –Life = 500 cycles –Charge Temp range = (-20˚C – 75 ˚C) –Charge rate = 2 to A # of batteries = ? –In order to meet last for 12 hrs at total failure of Solar Cells # of batteries needed to operate = 16 Characteristics –Height =.065 m –Width =.060 m –Thickness =.0196 m –Weight =.153 kg –Energy = 26 Wh –Life = 500 cycles –Charge Temp range = (-20˚C – 75 ˚C) –Charge rate = 2 to A # of batteries = ? –In order to meet last for 12 hrs at total failure of Solar Cells # of batteries needed to operate = 16

Power Regulation Unit HESC 104 High Efficiency and Smart Charging Vehicle Power Supply Characteristics –Length = m –Width = m –Height = m –Weight =.186 kg –Temp range = (-40˚C – 85 ˚C) –Charge Current = 0 to 4 A –Charge Voltage = 9.5 to 19.5 V –Input Voltage = 6 to 40 V Provides for 3, 5, +-12 V Characteristics –Length = m –Width = m –Height = m –Weight =.186 kg –Temp range = (-40˚C – 85 ˚C) –Charge Current = 0 to 4 A –Charge Voltage = 9.5 to 19.5 V –Input Voltage = 6 to 40 V Provides for 3, 5, +-12 V

Analysis of Requirements Given: –W Bol, avg = W –W Eol, avg = W Need: –W peak, bus = 76 W x 30% = 99 W –W ellipse, bus = 40 W x 30% = 52 W Weight < 4.1 kg.186 kg (PRU) mg (Bare Cells) kg x 10 (batteries) kg +casing for solar cells, extra batteries, more PRU’s if needed, wires, resistors) < 4.1 kg Given: –W Bol, avg = W –W Eol, avg = W Need: –W peak, bus = 76 W x 30% = 99 W –W ellipse, bus = 40 W x 30% = 52 W Weight < 4.1 kg.186 kg (PRU) mg (Bare Cells) kg x 10 (batteries) kg +casing for solar cells, extra batteries, more PRU’s if needed, wires, resistors) < 4.1 kg Volume: < 20x27x11 cm –PRU = 9.5 x 9.0 x 1.5 cm –Battery = 6.5 x 6.0 x 1.96 cm Plenty of room because the batteries may be in their own side compartment. Temperature, to satisfy all = (0˚C – 75 ˚C) Life –Ideally we can last for 2 yrs. If everything doesn’t degrade faster than expected and still needing the same power. Volume: < 20x27x11 cm –PRU = 9.5 x 9.0 x 1.5 cm –Battery = 6.5 x 6.0 x 1.96 cm Plenty of room because the batteries may be in their own side compartment. Temperature, to satisfy all = (0˚C – 75 ˚C) Life –Ideally we can last for 2 yrs. If everything doesn’t degrade faster than expected and still needing the same power.

What’s left? Everything!!!! Cost Integrating –My parts –Sats parts Case for solar panels meeting mass budget Team analysis on subsystems needs More calculations!!! Everything!!!! Cost Integrating –My parts –Sats parts Case for solar panels meeting mass budget Team analysis on subsystems needs More calculations!!!

Gantt Chart SeptOctNovDecJanFebMar AFOSRDone JPL PDR Done JPL CDR POWER SeptOctNovDecJanFebMar Find ItemDone Cost Waiting on companies Integrating Research Team Chart My Chart

Thank You!! Till the next time!!! Happy Thanksgiving Everyone!!! Till the next time!!! Happy Thanksgiving Everyone!!!