Shipyard Layout. Big Bigger Biggest Manufacturing Processes.

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
GB Patent No Intnl Patent Pending - Peter deBoeck © Slick System of Plug-in Electrical Accessories The new concept in electrical wiring devices.
Johnson Street Bridge Replacement Project Technical Briefing April 8, 2015.
Welcome to Finger Lakes Conveyors Located on Route 414, in Waterloo, New York Introduction Shop Tour Shop Tour Welding Assembly Machining Engineering.
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
Company Profiles and Introduction
Phase V Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
ME 495 EV Team 1: Alex and Eric ME 495 EV: Electric Pontiac Fiero Project.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Ship Building Process Su-jin Kim Manufacturing Process
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
Manufacturing Engineering Objectives:  Create product structure charts, BOM’s and routing sheets  Determine appropriate manufacturing process  Evaluate.
Jigs and Fixtures Increased Consistency and Efficiency.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Development of Weir-Wall Contour-Matching PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington April 2015.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Process Planning is the Key to the design and Manufacturing of all Products.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Lesson Two Ship Design. Contents Design essentials Design Procedure advances factors concepts requirements Detailed operation.
Welcome to Odyssey Industrial Systems. 2 Odyssey Today 18,000 Square feet of leased space in two buildings Outsourcing powder coating today; in-house.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Welding Career Opportunities ExPERIENTIAL LEARNING TECHNOLOGY Welding Career Opportunities Overview.
TOPIC 4: SHIPYARD PRACTICES.
Financial Elements 1. Firm’s Main Objective is Value Creation for Shareholders and Other Stakeholders.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Melfast is a distributor of fasteners and hardware who offers a wide range of hardware items and materials including fasteners,
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
S A Griffiths CM42 June 2015 Electrical & Control.
435B Transport Container Fabrication Challenges and Solutions
Bollinger Shipyards.
The 4th Annual Colorado Robot Challenge
Gas Schedules
Francois and Lau EATM 17 July 2012
Metal Fabrication.
Complementary ISTC Projects #3888, 3889p
Mechanics: (Tim).
FFAG Magnets and Girders Meeting
Far Detector Activities Late 2017 – Early 2018
CAD Trainings LEGOOO!!!!.
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
Team 11 Adam Fisher Presented by: Mitchell Quetant Nathan Hammond
Your Coast –to-Coast Converter Connection
SALMAWY UNITED GROUP CONSULTANT
Increased Consistency and Efficiency
Consulting Captains, LLC
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
STRUCTURAL TIMBER FRAMING
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Ferrol Shipyard Total area : m² Dock equipment : m.
Sheet Metal Modernization ManTech Project No. S2702
SC1R Cold Box PDR Assembly Sequence
Lindoe Offshore Renewables Center
Technical Drawings.
Presentation transcript:

Shipyard Layout

Big

Bigger

Biggest

Manufacturing Processes

Design Phase for 49’ BUSL Project  25 boats in 3 years  Concept was already proven and prototyped  Production drawings were created  LLTM was purchased

Pre-Fabrication  Build Mocks, Jigs, and Fixtures.  Cut out Plate

Pre- Fabrication  Cut out Plate  Assemble Bulkheads

Build Shell  On Mock  Inverted Construction

 Weld pre-fabricated components to shell.  Install piping Structural Outfit

Blast/ Paint/ Righten  Boat shell is blasted and painted before being flipped over.  No more welding from this point on.

Rough outs/ Install Deckhouse  Install Aluminum Pilothouse.  Install Pilothouse equipment.

Install Machinery  Bolt on machinery into foundations.  No connections, yet.

Machinery Connection  Connect all machinery.  Avoids people climbing over each other to install and hook-up.  Critical alignments can be done once.

Electrical Installations  Only Electricians and Electronics Technicians on the Boat at this time.

Final Paint

Launch  Final Machinery test on dock  Drop in water for sea trials  Deliver quality CG asset on time and under budget!