Tracking with capillaries – Neutron & GRA radiography 1.Fist test with 2 targets is made in December 2.Analysis in progress 3.Test on monochromatic neutron.

Slides:



Advertisements
Similar presentations
Follow-Up Keep your Class on Track and Still Prepare them for the High-Stakes Test.
Advertisements

Installing Permanent Traffic Counters Warm Springs Reservation 2004.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Numbers
Biagio Rossi – PhD Student LHEP, University of Bern Biagio Rossi – PhD Student LHEP, University of Bern 1. Report on stautus of Analysis of capillary target.
Biagio Rossi – PhD Student LHEP, University of Bern Biagio Rossi – PhD Student LHEP, University of Bern 1.Analysis of capillary target 2.Report on LN-TPC.
3 rd International Platform on Integrating Arab e-infrastructure in a Global Environment e-AGE 2013 National Center for Nuclear Science and Technology.
Beth-El Machinery Ltd.. Departments in BE Machinery Process Department Packaging Department.
Johann Zmeskal, Stefan Meyer Institute for subatomic Physics Vienna, Austria INPC 2010, Vancouver JointGEM Project Status Report 3 rd JointGEM Meeting.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
Study of Sampling Fractions Shin-Shan Yu, A P, Hans Wenzel, October 18, 2006.
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Identify and describe the particles that make an atom. The size of an atom can be compared to the size of _______________________.
MICE Target Development Lara Howlett University of Sheffield.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Practice CS Project Management Amy McCarty Education Services.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Our Planet. We live on the Planet Earth. Our planet is our home and I want to see if clean and beautiful. Ecology of our planet will be much better in.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Chesapeake Bay Watershed Implementation Plans: Why, What, and When Katherine Antos U.S. EPA Chesapeake Bay Program Office MACo Winter Conference January.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
FLUID POWER CONTROL ME604C. Extent of the Subject: FLUID POWER & CONTROL Some beautiful examples: 1...\video\Edited\Excavetor working.mp4..\video\Edited\Excavetor.
X-Ray Beam Position Monitors An Introduction Wilfried Schildkamp.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
March 19, March 19, 2016March 19, 2016March 19, 2016 Azusa, CA Sheldon X. Liang Ph. D. Software Engineering in CS at APU Azusa Pacific University,
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
LRS Progress Report to the Profiling Working Group March 27, 2007.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
L.Vitale INFN and Univ. Trieste
Chris Booth Sheffield 29th March 2006
Matters arising RADWG - 3 July 2009
N_TOF CERN Enrico Chiaveri Spokesperson of n_TOF Collaboration
Pressure monitoring system for the CMS muon chambers
JEDI polarimetry – Developments at SMART|EDM_Lab
Work progress in Turin x the MVD
The report on the IBR-2 modernization
What did you see on this video?
E-165 (FLASH) Status 8:00am 6/12/2004.
Large Area Endplate Prototype for the LC TPC
TK Upgrade report.
10/month is the present production rate 2 FTE + sporadic contributions
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Assembly order PCB design
Tracking new discoveries using file history
Annual Conference March 22-23, 2018 Sacramento
Preliminary CSC Trigger Results from September Testbeam
Name That Atom! Use your knowledge of atoms to find the name of each of the following atoms. Use a Periodic Table!
THANK YOU!.
Drawing Bohr Models.
Thank you.
Thank you.
Chemistry, Part II.
DO NOW Take the guided notes from my desk, cut them out and glue them onto a clean RIGHT PAGE in your notebook. When you are finished respond to the.
Picture 1 10 protons 10 neutrons = an electron.
Test beam with Pixel modules
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
Upcoming CALICE meetings
Presentation transcript:

Tracking with capillaries – Neutron & GRA radiography 1.Fist test with 2 targets is made in December 2.Analysis in progress 3.Test on monochromatic neutron beam at PTB – March? 4.Target 3 produced, assembled, and cut (thanks to Simon and Hans)

Tracking with capillaries – target cut with diamond saw. water

Tracking with capillaries – target cut with diamond saw. water

Tracking with capillaries – target with it’s mechanics

Tracking with capillaries – EBCCD readout chain

Tracking with capillaries – filling system

Tracking with capillaries – Neutron & GRA radiography ToDo: 1.Cleaning and filling of target 3 2.If good - test with Pu239 and Cs137 3.Second target mechanics– for Soreq 4.Assembling and testing target for Soreq 5.Send target to Soreq 6.Prepare test beam at PTB (software, DAQ electronics, EBCCD)