AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 4: February 8 th 2007 Project Aquarius Power Engineering Habitat.

Slides:



Advertisements
Similar presentations
AAE450 Project Aquarius Breanne Wooten 1 Breanne Wooten Week 10*: March 22 th, 2007 Human Factors/Integration/APM Mars Taxi Emergency Airbag Update Final.
Advertisements

AAE450 Senior Spacecraft Design Poliskie - 1 T.J. Poliskie Week 5: February 15, 2007 Propulsion Earth Taxi, Mars Taxi Group Zero Boil-Off Cryogenic Propulsion.
AAE 450 Spring 2008 Justin M. Rhodes Avionics – Telecommunications Analysis Code Integration and Automation Webmaster Sample Design and Failure.
AAE450 Spring 2009 X 0 Power System Solar - Battery Solar arrays Tony Cofer- Power System.
AAE450 Senior Spacecraft Design Jummie Garba Week 9: March 22 st, 2007 Propulsion Group Electrical Propulsion System 1 & 2 Update on EP ships.
AAE450 Senior Spacecraft Design Catherine Frey Week 2: January 25 th, 2007 Propulsion Team Leader Liquid Propellant Tank Sizing.
AAE450 Senior Spacecraft Design Project Aquarius Rogge - 1 Courtney Rogge Week 8: March 8 th, 2007 Power Group TV Nuclear Power System – with Shielding!
AAE450 Senior Spacecraft Design Catherine Frey Week 8: March 8 th, 2007 Propulsion Group, Transfer Vehicle Group, Mars Launch Vehicle Group, aM/aE/dM/dE.
AAE450 Senior Spacecraft Design 3/1/2007 Ryan 1 Ryan Scott Week 7: March 1st, 2007 Power Group Leader TC, TV, dE, aM, dM, aE, CS1-2, CSM *This Week* Power.
AAE450 Senior Spacecraft Design 2/15/2007 Scott 1 Ryan Scott Week 5: February 15th, 2007 Power Group Leader TC, TV, dE, aM, dM, aM, CS1, CS2, CS3 *WITH.
AAE450 Senior Spacecraft Design Courtney Rogge Week 2: January 25 th, 2007 Power Nuclear Power Capabilities.
Lunar Power Peaks Rajeev Shrestha ASTE 527. Rajeev ShresthaDec 15, 2008Lunar Power Peaks Power requirements SystemBuild-Up Phase (kW) Fully Operational.
AAE450 Senior Spacecraft Design Steve Kassab Week 1: January 18 th, 2007 Power Team RTGs, Fuel Cells ISPP.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 11: April 5 th 2007 Project Aquarius Final Presentation Storyboard.
AAE450 Senior Spacecraft Design Project Aquarius Rogge - 1 Courtney Rogge Week 10: March 29 th, 2007 Power Group Earth Taxi, Mars Taxi, Electric Propulsion.
AAE450 Senior Spacecraft Design Catherine Frey Week 4: February 8 th, 2007 Propulsion Group, Transfer Vehicle Group Transfer Vehicle Combustion Chamber.
AAE450 Senior Spacecraft Design Dan Maguire Week 2: January 25 th, 2007 Structures Group Group Leader, Ares 1, Earth Taxi, Mars Taxi, Depart Mars, Arrive.
AAE450 Project Aquarius Breanne Wooten 1 Breanne Wooten Week 8: March 8 th, 2007 Human Factors/Integration/APM Taxi Capsule Crew Compartment Final Update.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 10: March 27 th 2007 Project Aquarius Power Engineering Group Surface.
AAE450 Senior Spacecraft Design Atul Kumar Presentation Week 3: February 1 st, 2007 Aerodynamics Team Re-Entry vehicle analysis - Lifting body 1.
AAE450 Project Aquarius Breanne Wooten 1 Breanne Wooten Week 6: February 22 th, 2007 Human Factors/Integration/APM Human Limitations Update/Mars Taxi Escape.
AAE450 Senior Spacecraft Design Kate Mitchell - 1 Kate Mitchell Week 6: February 22 nd, 2007 Human Factors – Group Lead HAB & TV Vehicle Groups This Week:
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
AAE450 Senior Spacecraft Design Chris Bush Week 5: February 15 th, 2007 D&C Group High Thrust Trajectories ET, dE, aM.
AAE450 Senior Spacecraft Design Rick Hutchings Week 2: January 25 th, 2007 Thermal Control Thermal Control Systems for TV.
AAE450 Senior Spacecraft Design Kate Mitchell - 1 Kate Mitchell Week 8*: March 1 st, 2007 Human Factors – Group Lead HAB & TV Vehicle Groups This Week:
AAE450 Senior Spacecraft Design Project Aquarius Kirk Akaydin Week 3: Feb. 1 st, 2007 Project Manager Cost/Schedule/Risk Analysis This Week: Cost Scheduling.
AAE450 Senior Spacecraft Design Project Aquarius Kirk Akaydin Kirk Akaydin Week 5: Feb. 15 th, 2007 Project Manager Cost/Schedule/Risk Analysis This Week:
Nuclear Power Fission and Radioisotope Presented to: Propulsion and Power Panel Aeronautics and Space Engineering Board National Research Council by Joseph.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
AAE450 Spring 2009 Kelly Leffel 3/0509 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control Kelly Leffel Structures and.
AAE450 Senior Spacecraft Design Kate Mitchell - 1 Kate Mitchell Week 4: February 8 th, 2007 Human Factors – Group Lead HAB, TV, Integration Group This.
ARTEMIS Advanced Rover Technology for Exploration on the Moon using In Situ utilization Jesse Hecht Sean Fierman Cedrick Ngalande.
AAE450 Senior Spacecraft Design Project Aquarius Mike Kowalkowski Week 2: January 25 th, 2007 Project Aquarius Power Engineering Habitat, Battery, and.
AAE450 Senior Spacecraft Design Matthew Fox Week 4: February 8th, 2007 Structures Group, Integration Group Transfer Vehicle Truss CAD Transfer Vehicle,
AAE450 Senior Spacecraft Design Rick Hutchings Week 10: March 29 th, 2007 Thermal Control Final Presentation Slides 1 st Draft Hutchings, 1.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
AAE450 Senior Spacecraft Design Anderson (1) Brandon Anderson Week 7: March 1st, 2007 Structures Group EP Vehicle, TC Landing Gear.
1. 2 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
AAE450 Spring 2009 Lunar Lander Power Systems Thursday March 12 th Adham Fakhry Power Group Lunar Lander Descent Night Thermal.
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
AAE450 Senior Spacecraft Design Ryan Scott Week 3: February 1st, 2007 Power Group Leader TC, TV, dE, aM, dM, aM, CS1, CS2, CS3.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
AAE450 Senior Spacecraft Design Rick Hutchings Week 8: March 8 th, 2007 Thermal Control Insulation and COM Sat Thermal Control.
AAE450 Senior Spacecraft Design Project Aquarius Rogge - 1 Courtney Rogge Week 6: February 22 nd, 2007 Power Group Nuclear Power Capabilities TV Nuclear.
AAE450 Senior Spacecraft Design Ryan Scott Week 1: January 18 th, 2007 Power Group Leader Solar Panels / Transfer Vehicle / Capsule.
AAE450 Senior Spacecraft Design Matthew Guyon Week 5: February 15 th, 2007 Thermal Control/Team Leader Mars Rover Thermal Control System/ Ablative Thermal.
AAE450 Senior Spacecraft Design Breanne Wooten Week 2: January 25 th, 2007 Human Factors/APM Human Limitations/Taxi Capsule.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 2\22\2007 Mike Kowalkowski Week 6: February 22 nd 2007 Project Aquarius Power Engineering.
AAE450 Senior Spacecraft Design Maguire,1 Dan Maguire Week 4: February 8th, 2007 Structures Group Group Leader, Ares 1, Earth Taxi, Mars Taxi, Depart Mars,
AAE450 Senior Spacecraft Design Project Aquarius Jonathan Kubiak Jonathan Kubiak Week 5: February 15th, 2007 Human Factors: Manned Rover, Martian.
AAE450 Senior Spacecraft Design Nathan Payne March 29 th, 2007 Final Presentation.
AAE450 Senior Spacecraft Design Mark Cunningham Mark Cunningham Week 10: March 29 th, 2007 Communications Team Final Presentation Slides – First Draft.
AAE450 Senior Spacecraft Design Atul Kumar Week 1: January 18 th, 2007 Aerodynamics Team Entry vehicle analysis 1.
A&AE 450 – Senior Design Un-pressurized Surface Vehicles, Local Science Issues and Robotic Exploration February 13, 2000 Christopher Burnside.
AAE450 Senior Spacecraft Design Mark Cunningham Week 6: February 22 nd, 2007 Communications Team, Comm. SATs CAD, TV/ET/MT Groups Communication Satellites.
Near-Term Mars Colonization -A DevelopSpace Project- June 15 th, 2008.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 8: March 8 th 2007 Project Aquarius Power Engineering Group Surface.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Power Systems Design Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Power Systems Design Definitions of energy and power Power generation.
AAE450 Senior Spacecraft Design Kate Mitchell Week 2: January 25 th, 2007 Human Factors – Team Lead Habitat (HAB), Crew Transfer Vehicle (CTV) This Week:
AAE450 Senior Spacecraft Design Matthew Fox Week 2: January 25 th, 2007 Structures Group Material Selection / CAD Transfer Vehicle, Mars Crawler, Construction.
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
AAE450 Senior Spacecraft Design Jonathan Kubiak Week 1: January 18 th, 2007 Human Factors.
June 3, 2008 Slide 1 Lunar/Mars Surface Power Architecture Analysis Follow-up Chase Cooper August 7, 2008.
Callisto Mission LaRC Option
2016 RASC-AL Final Presentation
Deputy, Washington Operations
Team A, Power Group Presentation
Presentation transcript:

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 4: February 8 th 2007 Project Aquarius Power Engineering Habitat & Rover Power Sizing

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 2 Mars Surface Layout Conceptual Design –Effective regulated power delivery system with minimal radiation exposure: manned –Partially regulated power to ISPP plants Assumptions –400 m minimum human distance from reactor 1 –Human line of sight maintained (Kirk Akaydin) –Distribution efficiency ~ 89% P / M / V – Mars Surface –Power: 1.05 MWe capacity –Mass: 7 mt –Volume: 16 m^3 All rovers are fuel cell dependent and autonomous. EPS2 Backup ISPP 2 H 2 &O 2 HAB 1 HAB 2 Aux. Power Supply CRYO System 10MWe deliverable 1.05 MWe received 150 kWe required 750 kWe required 15 kWe required

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 3 Rover Power Requirements Mars Rover (Manned) Power System: –Mass: 1000 kg –Volume: 1.7 m^3 –Peak Power: 48 kWe –Idle Power: 10 kWe –See attached MATLAB code to size power for all vehicles –Total mass: 5 mt.9 mt – Human Factors 2.5 mt – Structures.6 mt – Towing / Storage 1 mt – Fuel Cells & Battery Backup Capabilities and Sizing: –Max level velocity: 40 km/hr –Max range: 50 km 1-way (25 km reserve) –Max incline: 30 o –Max speed at incline: 3 km/hr –Time at incline: 10 minutes –12 hour autonomous operation –Utilizes in-situ fueling station

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 4 Backup Slides Week 4 Readiness Level

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 5 Mars Surface Power Budget Power budget - Surface –75 kWe per HAB 25 kWe life support systems –(Courtesy: Kate Mitchell) 35 kWe ground control systems, communications, 25% margin for science operations –750 kWe total ISPP (Courtesy: Steve Kassab) –15 kWe CRYO / excess Launch pad, no bleed cryo system –2 hour HAB Li-Ion Backup PMAD losses –8.3% power budget (Courtesy: Larson & Pranke) Resistance losses –2% power budget (Courtesy: Larson & Pranke) –Next step includes assessment of power distribution losses as a function of distance

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 6 Mars Surface M / V Calculations Primary System: HAB –PMAD & Nuclear PMAD mass ~ 11.1 kg/kW e 1 Wiring ~ 0.5 kg/m 1 System requires 150 kWe Secondary System: HAB –Direct fuel cell system PEM fuel cells are capable of running in reverse. In the case that both nuclear power systems are offline, the ISPP production facility can begin generating power to sustain the HAB indefinitely. Primary System ISPP –Electrolysis Partially regulated 1 10,000 mt propellant produced in 2 years According to Steve Kassab, requirement is 750 kWe between the two plants over that time period. –Assume 90% efficiency CRYO storage tanks budgeted 15 kWe. Need more information to finalize.

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 7 Mars Rover Power Assumptions Directed Fuel Cell –Specific Energy: 1 kg/(kW-h) fuel 2 –Densities LOX 692 kg/m^3 2 LH kg/m^3 2 –Fuel Cell Machinery 4 kg / kW –(Courtesy: Kassab) 1.5 W e /cm^3 density 3 –Tank Mass LH2 2.4 kg/kg H 2 LOX.25 kg/kg O 2 Level power 90% efficiency –Power = m*g mars *c f *v 4 Graded power 90% efficiency –Power = v*(m*g mars *c f *cos(theta) + m*g mars *sin(theta)) 4 See attached code for calculations. –½ credit to Steve Kassab for helping create fuel cell code. Top 50 km/hr –~1650 kg system

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 8 Calculations Calc. Theory from Human Spaceflight: Mission Analysis and Design, Larson & Pranke pgs – MATLAB code to come shortly

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 9 Power Systems Trade Study ISPP vs. Solar Panel Backup System 5 –Referenced Ryan Scott’s solar panel code 6 –ISPP fuel cells use fuel already in the ground at Mars that has been electrolyzed by a nuclear reactor that is already budgeted into the mission. Turning that system around in the event of an emergency saves weight compared to solar panels. –Solar panels require additional weight and a lot of volume. Power: 150 kWe – Martian Surface Weight: 2.5 mt Volume: 486 m^3; Area: 3827 m^2

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski EP Systems Available 7

AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 11 Cited References 1 Larson, Wiley J. and Linda K. Pranke. Human Spaceflight, Mission Analysis and Design. Ch. 13 – “Designing, Sizing, and Integrating a Surface Base.” McGraw Hill. 2 Larson, Wiley J. and Linda K. Pranke. Human Spaceflight, Mission Analysis and Design. Ch. 14 – “Planetary Surface Vehicles.” 3 “PEM Fuel Cell Cost Status.” Carlson, Eric, et al. November Available online. Nov17/Carlson_Eric_392.PDF Nov17/Carlson_Eric_392.PDF 4 “Power – Physics.” Wikipedia. Available online Landis, Geoffrey. “Photovoltaic Power Options for Mars.” October Available Online Scott, Ryan. Arraysize.m. February 8, Attached. 7 Landau, Dr. Damon. “Strategies for the Sustained Human Exploration of Mars.” Dec