EMMA 24 th February 2009 ALICE Stakeholder Meeting.

Slides:



Advertisements
Similar presentations
EMMA LAYOUT Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.
Advertisements

EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Accelerators 2006 Roger Barlow 1: Wakefields 2: The NS-FFAG.
EMMA Overview Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
EMMA/BASROC/CONFORM etc: FFAG developments at the Cockcroft Institute Cockcroft SAC - 26 November 2007 Roger Barlow.
Accelerator Science Roger Barlow EPSRC Visit 6 th December 2007.
Welcome! BASROC/CONFORM Open Day Daresbury May 11 th 2009 Roger Barlow, Manchester University and the Cockcroft Institute.
EMMA: the first NS-FFAG Roger Barlow. What is an FFAG? Like a synchrotron Strong Focussing (‘Alternating Gradient’) Dipole field increases with particle.
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
Bruno Muratori STFC, Daresbury Laboratory Commissioning EMMA 02/07/09 PRISM workshop – Imperial College.
EMMA Design and Construction Bruno Muratori STFC, Daresbury Laboratory 21/01/09.
NON-SCALING FFAGs: questions needing answers Andy Wolski The Cockcroft Institute, and the University of Liverpool Department of Physics. BASROC-CONFORM.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University *BNL, CERN, CI, FNAL, JAI, LPSC Grenoble, STFC, TRIUMF.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
JAI-Diamond Joint Seminar 07/06/20071 Development of Non-Scaling FFAG : EMMA & PAMELA Takeichiro Yokoi J. Adams Institute Oxford University.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Electron Model of Linear-Field FFAG for Muon Acceleration What does it look like? – much like the KEK ATF (36 F0D0 arc cells) but without its straight.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Contents Overview of 150 MeV FFAG Accelerator
Magnet Design & Construction for EMMA
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
1 ALICE and EMMA Yuri Saveliev … and many others at DL and beyond ASTeC, STFC Daresbury Laboratory IOP Particle Accelerators and Beams Annual Conference.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
FFAG Nonscaling FFAGs for Hadron Therapy C. Johnstone, Fermilab FFAG08 Sept 1-5, 2008 University of Manchester Manchester, U.K. Fermilab.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
EMMA, BASROC, Hadron Therapy and ADSRs Roger Barlow STFC Cockcroft Review Feb 11 th 2009.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
ApEx needs for CeC PoP Experiment December 11, 2015.
EMMA Lessons Learnt Susan Smith Daresbury Laboratory.
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Particle Physics Group Meeting January 4 th – 5 th 2010 Commissioning EMMA, the Worlds First Non Scaling Fixed Field – Alternating Gradient Accelerator.
ELENA installation progress F. Butin / ELENA collaboration.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Report Technical Director Storage-Ring-Installation Completed
EMMA Design and Construction
Beam Commissioning Adam Bartnik.
Status of HESR 18th March Gießen Dieter Prasuhn.
Nonscaling FFAG design and EMMA experiment
J-PARC main ring lattice An overview
Large Booster and Collider Ring
Status of the Front End Test Stand April 2007.
Isochronous, FFAG Rings with Insertions for Rapid Muon or Electron Acceleration G H Rees, RAL.
Topical Workshop on Injection and Injection systems (TWIIS)
Muon Acceleration in a Neutrino Factory
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Presentation transcript:

EMMA 24 th February 2009 ALICE Stakeholder Meeting

ALICE Stakeholder meeting - Feb 2009 IOT Racks EMMA Layout

ALICE Stakeholder meeting - Feb 2009 EMMA Infrastructure upgrade in progress in ALICE Accelerator Hall

ALICE Stakeholder meeting - Feb 2009 Injection Line Assembly in progress in S Block

ALICE Stakeholder meeting - Feb 2009 Integration IOT Rack ALICE Diagnostics Beamline RF Distribution

ALICE Stakeholder meeting - Feb 2009 Aims & Objectives of EMMA Project World’s first NS-FFAG (non-scaling Fixed Field Alternating Gradient) accelerator FFAG: Field fixed in time but varies across pipe Nonscaling: Dipole field scales with momentum but focussing quadrupole fields do not – –Optics changes during acceleration –Betatron Tune changes during acceleration –Resonances unavoidable –But rapid acceleration means this is not fatal. (We hope)

ALICE Stakeholder meeting - Feb 2009 CONFORM CONFORM ( COnstruction of a Nonscaling FFag for Oncology, Research, and Medicine ) Total funds £6.9m over 4 year project lifecycle from RCUK Basic Technology from 1 st April 2007 Led by University of Manchester and The Cockcroft Institute including RAL, JAI, and others. Also FNAL, Brookhaven, Grenoble –EMMA design and construction –PAMELA design study for hadron therap machine –Applications study for other applications BASROC (British Accelerator Science and Radiation Oncology Consortium) umbrella group of academic, medical and industry specialists in accelerator and medical technology with the aim of promoting the use of accelerators in science, industry and medicine. –

ALICE Stakeholder meeting - Feb 2009 EMMA Basic Parameters Energy range10 – 20 MeV LatticeF/D Doublet Circumference16.6 m No of cells42 Normalised transverse acceptance3π mm-mrad Frequency (nominal)1.3 GHz No of RF cavities19 Average beam current13 μA Repetition rate1, 5, 10, 20 Hz Bunch charge16-32 pC single bunch

ALICE Stakeholder meeting - Feb 2009 Requirements Full aperture injection and extraction at all energies 10 – 20 MeV Many lattice re-tunings (vary ratio of dipole to quadrupole fields) Vary frequency, amplitude and phase of RF cavities Non-accelerated operation to map closed orbits and tunes vs momentum Map longitudinal and transverse acceptances with probe beam To be heavily instrumented with beam diagnostics, etc.

ALICE Stakeholder meeting - Feb 2009 Ring Magnets Requirements / Solution Adjust dipole & quadrupole components independently - Mount magnets on independent radial linear slides Fields identical in every cell despite kickers and septum - Field clamps at cell entrance face of QD & exit face of QF. Adjusted at the factory Very large good field region for range of closed orbits - Optimised pole profile implemented Due to extreme compactness of lattice, D & F magnets Are in very close proximity. Consequence: field computation and measurement with both magnets in place has been essential. Results from the prototype measurements have been implemented in the lattice simulations Are short compared with aperture. Consequence: integrated strength is dominated by end-field contributions All magnets scheduled to be delivered from TESLA by 10 th April 2009

ALICE Stakeholder meeting - Feb 2009 RF Cavities 20 (19 + spare) production cavity construction in progress – give fast acceleration 4 of 5 batches delivered to DL 5 th batch – scans awaiting approval by DL

ALICE Stakeholder meeting - Feb 2009 Injection/Extraction Septum Design In house design of septum and vacuum chamber in progress Wire eroding of lamination stacks is in progress. Delivery scheduled for Feb – Mar 2009 Manufacture Misc. septum components Apr – May 2009 Magnet measurements scheduled for Jun 2009 Plan view of septum in vacuum chamber Section view of septum in vacuum chamber ISO view of septum with vacuum chamber removed

ALICE Stakeholder meeting - Feb 2009 Kicker Magnet Design Ferrite CDM5005 C core (Ceramic Magnetics, New Jersey) 100 mm Kicker component manufacture by Brite Precision, Newbury Ferrite blocks manufactured by Ceramic Magnetics, New Jersey Prototype kicker magnet complete. Four production devices to follow subject to successful testing Delivery to APP in early March to be used as the test load for the kicker power supplies

ALICE Stakeholder meeting - Feb 2009 Standard Ring Vacuum Chamber BPM Block Contract placed for BPM pickups with Testbourne. Delivered November 2008 Contract placed with VG Scienta for the vacuum chambers. Manufacture in progress – Batch Delivery – March 2009 Clean vacuum testing & RGA cleanliness tests at the factory before delivery to Daresbury Particle processing at Daresbury

ALICE Stakeholder meeting - Feb 2009 RF Distribution Contact placed with Q-Par Angus in Oct Manufacture and testing in progress Delivery due end of March 2009

ALICE Stakeholder meeting - Feb 2009 RF Source Inductive Output Tube VIL kW Transmitter Contact placed with CPI in Sep Full testing at CPI before delivery Delivery due end of March 2009 Commissioning at Daresbury in late April – early May

ALICE Stakeholder meeting - Feb 2009 INJECTION LINE ALICE to EMMA New Dipoles x 2 (33°) & BPMs at dipole entrance Position measurement New Dipole 30° & BPMs at dipole entrance Position measurement BPM Position measurement Wall Current Monitor New Quadrupoles x 13 Ion Pump Vacuum valve Tomography Section Screens x 3 (emittance measurement) SRS Quadrupoles x 3 Screen & Vert. Slit Beam Direction SRS Quadrupoles x 2 Screen Vacuum valve Screen Emittance measurement Combined H and V Steering Magnet x 4 EMMA Ring ALICE Match the probe beam to the requirements of EMMA Measure the properties of the probe beam Vertical Steering Magnet x 2 Beam Dump New Dipole 30°

ALICE Stakeholder meeting - Feb 2009 DIAGNOSTICS BEAMLINE LAYOUT Spectrometer dipole entrance Screen Faraday Cup E-O Monitor Screen x 3 Tomography Section Wall Current Monitor BPM & Valve SRS Quadrupoles x 6 New Quadrupoles x 4 ALICE New Dipole (43°) & BPMs at dipole entrance Current measurement Longitudinal profile Position measurement New Quadrupoles x 4 Screen & Vert. Slit Emittance measurement Extracted momentum Screen Location for Transverse Deflecting Cavity (NOT IN BUDGET) Combined Horizontal and Vertical Steering Magnets x 4 Vertical Steering Magnet x 2

ALICE Stakeholder meeting - Feb 2009 Timescale for Installation ALICE shutdown25 Oct - 21 Nov 2008Complete Diamond drilling of ALICE wall, cable tray installation EMMA off line build of modules in S blockNov Jul months ALICE shutdown (In progress now)23 nd Feb - 29 th Mar weeks EMMA Cable pull (90%) through external labyrinth, ALICE Dipole installation, Injection line girders through equipment access doorway EMMA installation in Accelerator HallMar - Aug months ALICE shutdown (dates to be confirmed) 8 th Jun - 13 th Jul weeks EMMA Cable pull through external labyrinth (10%), Controls cable pull through the control room labyrinth, Ring girder installation through equipment access doorway (except Injection & Extraction girders) Injection line complete ready for commissioning with electrons19 th Jul 2009 Test IOTMay 2009 Install RF waveguide distributionAug 2009 Commission RF Sep 2009 EMMA Injection & extraction septum girder available for installation through equipment access doorway end of Aug 2009 ALICE shutdown (dates to be confirmed)15 th Sep - 15 th Oct weeks Test systems in Accelerator HallSep - Oct months Ring and phase 1 diagnostic beamline complete31 st Oct 2009 Commission with electrons starting1 st Nov 2009

ALICE Stakeholder meeting - Feb 2009 Summary Design phase and Procurement is well advanced with major contracts placed Major components started to arrive in November 2008, off-line build is in progress Access to ALICE accelerator Hall required for installation work Shutdowns required to ALICE to open the cable route labyrinth We aim to have the ALICE to EMMA Injection line ready for commissioning with electrons by 19 th July 2009 We aim to be ready for commissioning the EMMA ring with electrons by 1 st November 2009