Costing the Target Ajit Kurup May 17, 2011. Page 2 Costing the Target Ajit Kurup Costing of the target for the RDR needs to be done using the CERN costing.

Slides:



Advertisements
Similar presentations
Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1Information Technologies.
Advertisements

New Drug Capacity Calculator Instruction Manual An Excel-based tool for estimating the resource required to deliver newly approved chemotherapy drugs.
1 CA202 Spreadsheet Application Combining Data from Multiple Sources Lecture # 6.
Project Costing Tool EUROnu Annual Meeting – 3rd June 2010 Jurgen De Jonghe / Benoît Daudin – CERN, GS-AIS-PM.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
Lecture Microsoft Access and Relational Database Basics.
Introduction to Access. What is Access? Database tool Creates a database Good data query (lookup and analysis) ability Good entry forms Good reports Multi-user.
1 ISO – Metadata Next Generation International consensus being built on structured metadata within a broader Geomatics Standard under ISO Technical.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
Database Software Application
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Ogden Air Logistics Center. Purpose of Excel2FV Many agencies produce point lists of different data (target lists, force locations, etc.) in either Excel.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
VA Pain Coach (VPC) Mobile Applications (Apps) Phase Two (MAP2)
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
Introduction to the Nevada SharePoint Site
Summer Term 2010 D.Garey OCR Nationals Level 3 Unit 3 – Problem Solving AO3 Collect data and store it using a spreadsheet.
The Project – Spreadsheet Design. The following is the high mark band for the spreadsheet design: The candidate has Analysed a given data set and designed.
Introduction to database systems
Summary Data Modeling SDLC What is Data Modeling Application Audience and Services Entities Attributes Relationships Entity Relationship Diagrams Conceptual,Logical.
Tracking Studies of Phase Rotation Using a Scaling FFAG Ajit Kurup FFAG07 12 th – 17 th April 2007.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
Computer Science 101 Database Concepts. Database Collection of related data Models real world “universe” Reflects changes Specific purposes and audience.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Ajit Kurup, Imperial College London P. Bonnal, B. Daudin, J. De Jonghe, CERN An Accelerator Design Tool for the International Design Study for the Neutrino.
SRDR Quarterly Training Brown Evidence-based Practice Center Brown University June 20 th, :00pm-2:00pm Entering Data Retrospectively into SRDR The.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
CIS 250 Advanced Computer Applications Introduction to Access.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
The IDS Website Ajit Kurup IDS Meeting 17 th January 2008.
Elliott Links Edward M. Kwang President. Elliott Notes, Attributes & Links Notes & Attributes –Expand Elliott database without modification –They are.
An approach for Framework Construction and Instantiation Using Pattern Languages Rosana Teresinha Vaccare Braga Paulo Cesar Masiero ICMC-USP: Institute.
McGraw-Hill/Irwin The Interactive Computing Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Working with Data Lists.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
Senior Design Spring 2015 Lindsay Sullivan Emily Simonelli Taniya Singh United Illuminating in Orange, CT 2/12/2015 2/12/2014 Copyright © 2014 – Advanced.
1 Global Design Effort John Carwardine: [date] Cost Estimate data management John Carwardine Feb 8, 2008.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
(BDS) Lattice Integration Process at ILC Benno List DESY –IPP– BDS Lattice Webex Meeting B. List, (BDS) Lattice Integration at ILC 1.
Phase 2 Water Portfolios The Journey Continues....
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
EURISOL, PSI, June 2006E.Wildner, CERN1 Data Bases for Parameter Lists N. Emelianenko, CERN AT-MAS E. Wildner, CERN AT-MAS Presentation is based on a presentation.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
IST 220 – Intro to Databases
Design Process.
Oracle Subledger Accounting
Configuration Management and Layout Database ELENA Project
Principles of report writing
أ.إسراء الطريقي أ. هاله الشملان , 102 تقن , المعمل الخامس
AO3 Collect data and store it using a spreadsheet
Summary Data Modeling SDLC What is Data Modeling
CAD DESK PRIMAVERA PRESENTATION.
Pivot tables and charts
Engineering Portfolio
Engineering Portfolio
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
Presentation transcript:

Costing the Target Ajit Kurup May 17, 2011

Page 2 Costing the Target Ajit Kurup Costing of the target for the RDR needs to be done using the CERN costing tool. –The tool was originally designed to cost CLIC but is being used for EUROnu. The tool is mainly for accounting and reporting, so we need to provide it with the right information! –Broken down into 3 project phases with associated costs and man-power. Costing workshop on 25 th May at CERN –Plan is to discuss Project Breakdown Structures (PBSs). Introduction

Page 3 Costing the Target Ajit Kurup CERN Costing Tool It’s an Oracle database with a web interface. An Excel spread sheet input has been developed to facilitate data entry. I’m developing another tool to store the engineering design and calculations and it will interface to the tool. CERN Tool links to the CERN document sever (EDMS) to store things like invoices, engineering drawings, etc, to document how costs are derived. Project has 3 phases Industrialisation Procurement Reception (i.e. commissioning) Each phase has a start date, duration, costs and manpower

Page 4 Costing the Target Ajit Kurup Spread Sheet I’d like to use this spread sheet to store the information needed for the costing and also a way of specifying the current design of the target. It was primarily designed with beamlines in mind but I think it is also suitable for the target. Will have a separate sheet for the liquid, solid and powder options. Example shows the muon linac. Rows and columns are grouped to provide different levels of detail. Current view shows the lattice design.

Page 5 Costing the Target Ajit Kurup Spread Sheet Additional details gives project start date, duration, link to EDMS, etc

Page 6 Costing the Target Ajit Kurup Spread Sheet Sections in red correspond to costs and manpower for the different phases of the project. A VBA macro is used to generate the input for the costing tool.

Page 7 Costing the Target Ajit Kurup I’d like to know how you think the target should be broken down? –What information is required for each of these parts? –My naïve idea of a first level breakdown is something like Proton beam transfer line Target delivery system Capture Solenoid Shielding (including containment and maintenance access details ) We have limited engineering effort, so we should try to base costs on similar built parts where possible. Are there any problems with using the spread sheet to store this information? So …