European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration 26-27 October 2006 Calibration of.

Slides:



Advertisements
Similar presentations
European Space Astronomy Centre (ESAC) Villafranca del Castillo, MADRID (SPAIN) Aurélien Stébé DALToolKit Ingestor & Server September 2006, Moscow DALToolKit.
Advertisements

XMM EPIC MOS Jenny Carter EPIC Calibration Mallorca, 5 th -7 th Nov x3 binning pattern experiment Richard (Tao) Song, Jenny.
Comparison of XMM-Newton EPIC, Chandra ACIS-S3, ASCA SIS and GIS, and ROSAT PSPC results for G , 1ES , and MS A “Man on the street”
XMM EPIC MOS Andy Read EPIC Calibration Meeting Mallorca, Spain 01/02/05 What can we do with Pattern 31s? - Central pixel (red) has.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
RGS spectroscopy of the Crab nebula Jelle S. Kaastra Cor de Vries, Elisa Costantini, Jan-Willem den Herder SRON.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 ESAC Crab: the standard X-ray candle with all (modern) X-ray satellites M.G.F. Kirsch.
Spectral Study of CAL87 Ken Ebisawa (JAXA/ISAS) Dai Takei (Rikkyo University) Thomas Rauch (University of Tuebinen) 1Spectral Study of CAL87.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain Andy Pollock XMM-Newton SOC High-Resolution X-rays from Hot Stars Physics and Dynamics.
XMM EPIC MOS Steve Sembay ESAC 04/10/05 Implementation of the MOS spatial/temporal DRM: Does it work ? Zeta Puppis: Checking the line.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain Andy Pollock XMM-Newton SOC RGS calibration Calibration of the XMM-Newton RGS Andy.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton 1 M.Stuhlinger, March 2010 Status of XMM-Newton cross-calibration using SASv10.0 Madrid, 24. March 2010.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
The problem with double event patterns (M. Brusa, K. Dennerl – MPE) EPIC CAL/OPS meeting - MPE.
Energy Calibration using SNRs: preliminary results Andrea Tiengo INAF, IASF-Milano Mallorca, 6 November 2007 EPIC Calibration Meeting.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
XMM EPIC SOC Richard Saxton Background, Operations & Calibration (BOC) meeting Mallorca, 30/03/09-01/04/09 The Timing Mode PSF Richard Saxton, Maria Diaz.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Tuebingen 03/02/03-06/02/03 MOS Cooling Results and Current Response Both MOS Cameras.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
Mallorca EPIC Cal Meeting - February 2005 Darren Baskill: XMM project: MOS monitoring.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
XMM-Newton 1 A.Garcia, ESAC Spectral effects of PSF core excisting Madrid, 24. March 2009.
An XMM-ESAS Update Steve Snowden NASA/Goddard Space Flight Center EPIC Operations and Calibration Meeting - BGWG Palermo - 11 March 2007.
High-Resolution X-ray Spectroscopy of AGN Warm Absorbers Rebecca Smith MSSL, UCL with G. Branduardi-Raymont and M. Page.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 Properties of double event patterns.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Chandra X-Ray Observatory CXC Paul Plucinsky February A Comparison of Spectral Fit Results of E0102 from the Chandra and XMM CCDs Paul Plucinsky.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal October Comparison of RGS Model for 1E to the HETG data 2.BI CCD CTI Correction.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
XMM EPIC MOS Steve Sembay Mallorca 02/02/05 Temporal and spatial variability of the MOS RMF 1.Introduction and brief history of the.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
NASSP Masters 5003F - Computational Astronomy Lecture 19 EPIC background Event lists and selection The RGA Calibration quantities Exposure calculations.
Conclusions We established the characteristics of the Fe K line emission in these sources. In 7 observations, we did not detect the source significantly.
The IACHEC Matteo Guainazzi XMM-Newton Science Operations Centre ESAC-ESA.
European Space Astronomy Centre Villanueva de la Cañada, Madrid, Spain A.M.T. Pollock XMM-Newton SOC Statistics for high-energy astrophysics Some statistics.
A multi-colour survey of NGC253 with XMM-Newton Robin Barnard, Lindsey Shaw Greening & Ulrich Kolb The Open University.
The cooling-flow problem
Extreme soft X-ray emission from the broad-line quasar REJ R.L.C. Starling 1*, E.M. Puchnarewicz 1, K.O. Mason 1 & E. Romero- Colmenero 2 1 Mullard.
Chandra X-Ray Observatory CXC Paul Plucinsky IACHEC March Thermal SNR Working Group: Summary Report Paul Plucinsky on behalf of the IACHEC Thermal.
European Space Astronomy Centre (ESAC) Villafranca del Castillo, MADRID (SPAIN) Aurélien Stébé DALToolKit Ingestor & Server January 2008, VODay, Sofia.
Metal abundance evolution in distant galaxy clusters observed by XMM-Newton Alessandro Baldi Astronomy Dept. - University of Bologna INAF - OABO In collaboration.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
EPIC Calibration Meeting, Madrid Experience with combined Fe 55 /Vela SNR calibration K. Dennerl, 2010 March 23 Experience with combined Fe 55 / Vela SNR.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Feedback between circumnuclear gas and AGN: implications.
The X-ray Universe September 2005, El Escorial, Madrid, Spain Extended Sources in the XMM-Newton slew survey V. Lazaro a, R. Saxton a, A.M.Read.
The X-ray Universe September 2005, El Escorial, Madrid, Spain Extended Sources in the XMM-Newton slew survey V. Lazaro a, R. Saxton a, A.M.Read.
Experience with combined Fe55 / Tycho SNR calibration
The soft N132D to study the gain of the EPIC-pn camera
The RGS view of Markarian 421 Lights Shadows And
Gerard Fitzpatrick Tutor: Andy Pollock Trainee Project 2009
EPIC Calibration & Operations Meeting
Presentation transcript:

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Calibration of the XMM-Newton RGS after SASv7.0.0 European Space Astronomy Centre Mallorca October 2006 SRON Utrecht &

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Broad RGS themes  Review of RGS with SAS v7.0.0 and its CCFs  Schedule for new CCFs :  RGS pile-up  The WHIM story  Operational plans : single-node readout and “multiple-pointing”

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 New RGS CCFs with SAS v7.0.0  RGS QUANTUMEF  RGS CTI  RGS COOLPIX  RGS EXAFS  RGS ADUCONV  RGS EFFAREACORR  RGS background templates

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RGS EFFAREACORR with SAS v7.0.0 Randall Smith, GSFC

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RGS EFFAREACORR with SAS v7.0.0 Randall Smith, GSFC  new fudged RGS%_EFFAREACORR_0004

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Why RGS1_TEMPLATEBCKGND_003.CCF & RGS2_TEMPLATEBCKGND_003.CCF consistent use of rgsspectrum v2.6 new BACKSCAL per channel, not per CCD node new QUALITY per channel  more low BACKSCAL values  more 'bad' QUALITY channels XSPEC takes no account of background QUALITY  outliers in the background-subtracted spectrum  replace BACKSCAL(QUALITY=1) with node median(BACKSCAL(QUALITY=0)) SAS v7.0.0 PI extraction regions  90% & 95% 100% cross-dispersion  64 extensions such as X100_P095_1_8.00 SASv7.0.0 release of RGS background templates Charo

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RGS with SAS v7.0.0  How do you judge ?  We have reached the stage for quantitative statistical tests C-statistic  RGS physical test harness SNR 1ES is constant HR1099 spectrum is bremsstrahlung continuum (and weak lines) Procyon spectrum is lines (and weak continuum) Crab

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RGS A(t) from SNR observations CVI Lyα OVIII Lyα

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 SNR 1ES with RGS SASv6.5 CVI Lyα Ǻ OVIII Lyα Ǻ

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 SNR 1ES in SAS v6.5.0

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 SNR 1ES in SAS v7.0.0 do it better with rgsregions…

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RGS vs EPIC statistics  A(t)

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006  Pup with SAS v7.0.0  A(t) Jenny Carter, Leicester

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 No change in O-absorption in Mkn421

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RXJ Vela PWN C-layer increase of about 20 nm/year Prospects for an improved RGS effective area : RGS_EFFAREACORR = exp(-CT)*Polynomial(!T)

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RGS A( ) from HR1099 continuum

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 XCal from Procyon lines

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Procyon with SAS v7.0.0  A( )

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Spatial variations in the Crab Circle has r=50” Mori et al., Chandra

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Curved Crab spectrum red : sum of individual Chandra spectra pixels purple: 2-8 keV range fit to red curve blue: Kuiper et al. orange: Mori’s fit to total spectrum

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 RS Oph RGS pile-up

European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Miscellaneous  The WHIM story Everyone friends now (RGS was right)  Operational plans single-node readout a few remaining details “multiple-pointing” for AO7  implementation plan with deadline (Muñoz & Metcalfe)