Ion trap system RETRAP 1. the journey 2. the pictures 3. the platform 4. the plans Danyal Winters.

Slides:



Advertisements
Similar presentations
A PRACTICE GUIDE How to use the bike racks on the Metro bus! A PRACTICE GUIDE Courtesy of North Seattle Community College.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
STI Test Facility: Photos Taken in Test Area and Two Labs: 18 May 2006.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
End of 2007 SPECTRAP’ is being built in London to trap Ca+ ions with real imaging capabilities Early RF operation expected Jan 2008 Penning operation Feb/Mar.
SPECTRAP - GSI progress report and status overview.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
Basketball Problem #2 SOLUTION B. Given: The Classroom Owen 241 Find: The number of basketballs required to fill this classroom.
DIMENSION BST 1200 RAPID PROTOTYPE PRINTER University Of Idaho  Dimension BST 1200 is an additive fabrication printer  Uses:  Inexpensive pre-production.
M. Vogel for the SPECTRAP collaboration PRECISION SPECTROSCOPY ON HIGHLY CHARGED IONS.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
M. Vogel SPECTRAP status. Manuel VogelGSI X SPECTRAP.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Testing the Penning trap (operated as a Paul trap)
Status of the SPECTRAP project HITRAP meeting 27 September 2007 by Danyal Winters.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
SPEC(troscopy) -Trap Outline of talk Introduction – motivation for two cross continent traps Imperial College Group – areas of interest and expertise SPECTRAP/SPECTRAP’
Relocation of Daresbury MEIS to Huddersfield University
Some practical aspects of Retrap The ion traps and electronics operate near 4 K in the cold bore of Retrap. The pressure outside the heat shields is generally.
Zoran Andjelkovic Johannes Gutenberg – Mainz University GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
A seminar on “AUTOMATED GUIDED VEHICLES”
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Collinear laser spectroscopy of 42g,mSc
1. PURPOSE This procedure gives the essential requirements for proper equipment preparation and packaging. materials and supplies to insure delivery in.
Zoran Andjelkovic Johannes Gutenberg Universität Mainz GSI Darmstadt Laser Spectroscopy of Highly Charged Ions and Exotic Radioactive Nuclei (Helmholtz.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
CHAMPS Technology Srl World Leader Manufacturer of INSPECTION MACHINES.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
City of n Tigard Respect and Care | Do the Right Thing | Get it Done Presented to Tigard City Council April 26, 2011 Small Capital Construction Projects.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Forklift pick set-up interfacing with a MCHP
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
Storage Activities Nov Preparation for transportation of Turbines 2.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
1 1. General Information 1) Space (1) Land Space : 80Kft2 (2) Building Area : 75Kft2 ← 2 story-building(Partially 3 floors) 2) Construction Lead Time :
ELENA installation progress F. Butin / ELENA collaboration.
Precision Tests of Fundamental Interactions with Ion Trap Experiments
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
ELENA electron cooler and SEM grids status
April Pro Star Well Servicing uses a heated C-can as a tool room / storage compartment for well work parts such as tbg collars, x-over’s etc. This.
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
FERRO Warehouse under Model 4A
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
New Observations from the Hyperfine Structure of 49,51K
Value of contract: Length of contract: Contract start date:
Magnet, Support and Infrastructure
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
April 12, 2018.
SOLID Collaboration Meeting
& HITRAP machine status HITRAP
Presentation transcript:

Ion trap system RETRAP 1. the journey 2. the pictures 3. the platform 4. the plans Danyal Winters

1. the journey

GSI mbH, April 23, 2007,...

2. the pictures – electronic racks

Beamline Superconducting Magnet RETRAP magnet and beamline

... removing the beamline...

... inspecting the RETRAP frame...

... lifting the setup...

... meanwhile...

... a safe landing...

... removing the electronics racks...

... großer Gabelstapler(fahrer)...

... unloading empty wooden crates...

... loading filled wooden crates...

... there was room for more...

... but does this one (still) fit in?

... no, it doesn't 

??? It's in? But... how ???

... by human intervention!

a smiling face is a joy forever!

"there is no substitute for cubic inches"

3. the platform

HITRAP – Step 1 platform construction is delayed (~2 months) RETRAP frame storage room Laser lab stairs free path

HITRAP – Step 2

HITRAP – Step 3

HITRAP – Step 4

4. the plans arrival of RETRAP at GSI: Monday 23 April 2007 temporal storage in front of the ESR platform construction (finished June 2007) installation directly at HITRAP (on RETRAP platform) tests with MAXEBIS & Cooler trap  RETRAP tests at the HITRAP facility in 2007/ Pb +, 2 P 1/2  2 P 3/2 ( I =1/2, ~710 nm)  magnetic moment measurements of ground state hyperfine splittings in Pb 81+ (~1020 nm), 209 Bi 82+ (~244 nm) and 209 Bi 80+ (~1555 nm) time