Ion trap system RETRAP 1. the journey 2. the pictures 3. the platform 4. the plans Danyal Winters
1. the journey
GSI mbH, April 23, 2007,...
2. the pictures – electronic racks
Beamline Superconducting Magnet RETRAP magnet and beamline
... removing the beamline...
... inspecting the RETRAP frame...
... lifting the setup...
... meanwhile...
... a safe landing...
... removing the electronics racks...
... großer Gabelstapler(fahrer)...
... unloading empty wooden crates...
... loading filled wooden crates...
... there was room for more...
... but does this one (still) fit in?
... no, it doesn't
??? It's in? But... how ???
... by human intervention!
a smiling face is a joy forever!
"there is no substitute for cubic inches"
3. the platform
HITRAP – Step 1 platform construction is delayed (~2 months) RETRAP frame storage room Laser lab stairs free path
HITRAP – Step 2
HITRAP – Step 3
HITRAP – Step 4
4. the plans arrival of RETRAP at GSI: Monday 23 April 2007 temporal storage in front of the ESR platform construction (finished June 2007) installation directly at HITRAP (on RETRAP platform) tests with MAXEBIS & Cooler trap RETRAP tests at the HITRAP facility in 2007/ Pb +, 2 P 1/2 2 P 3/2 ( I =1/2, ~710 nm) magnetic moment measurements of ground state hyperfine splittings in Pb 81+ (~1020 nm), 209 Bi 82+ (~244 nm) and 209 Bi 80+ (~1555 nm) time