HISPEC/DESPEC meeting GSI, 21/02/2006 10 30 -16 1. Introduction: what happened recently (B.Rubio) 2. Beam quality: energy buncher (C.Brandau) 3. Layout.

Slides:



Advertisements
Similar presentations
Advanced GAmma Tracking Array
Advertisements

Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
From Cave C to R3B: Time Schedule 2008 Experiments with upgraded setup: proton arm, Si detectors, QFS detection system 2009 Implementation of new readout.
Hong Kong Project management theory Project Management What do you know about management theory?
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Workshop on Physics on Nuclei at Extremes, Tokyo Institute of Technology, Institute for Nuclear Research and Nuclear Energy Bulgarian Academy.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
Wednesday, May 9 th 2007Torsten Beck Fast Pulse Shape Analysis for AGATA-Germanium- Detectors Torsten BeckWednesday, 9. Mai 2007 Student seminar Wednesday,
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
National Treasury 11 March Overview of Presentation  The Constitution and oversight  PFMA requirements for tabling of annual reports  Proposed.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
New sources – administrative registers Genovefa RUŽIĆ.
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
DESPEC A Algora IFIC (Valencia) for the Ge array working group.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
FAIR (Facility for Antiproton and Ion Research) (Darmstadt, Germany) low-energy cave MeV/u fragmentation/fission ~1GeV/u fragment separator 350m.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
DHHS COE Meeting Agenda February 16, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update Group Exercise.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Proposal Preparation. Documents for June PAC  Full Proposal  Starting point is LOI + updates in EOI  Project Definition Report  Cost estimate  Excel-based.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Component D: Activity D.3: Surveys Department EU Twinning Project.
Real Property Policy Update Planning and Development Committee August 4, 2015.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Paul Henry with thanks to co-reviewers: Wolfgang Hees, Karin Rathsman, Peter Rådahl, Mats Lindroos Review of TDR Chapter 7 “Conventional Facilities”
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
Itzhak Tserruya Weizmann Institute of Science
Finance Training Preparing for the Audit
Concluding remarks E. Migneco
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Software Configuration Management
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
(Procurement, testing of magnets)
4th FRC meeting, Antti Onnela, CERN-PH-DT
IHEP group Shashlyk activity towards TDR
Status of the AGATA installation at GANIL
The DBD: Outline and Scope
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Conduction of a simulation considering cascading effects
Accelerator Safety Workshop SLAC
Presentation transcript:

HISPEC/DESPEC meeting GSI, 21/02/ Introduction: what happened recently (B.Rubio) 2. Beam quality: energy buncher (C.Brandau) 3. Layout of the cave (Ch.Scheidenberger) 4. New MoU 5. Electronics and data acquisition (J.Nyberg, I.Lazarus) 6. Individual detectors (2 slides/3-5 minutes each) 7. Any other business 8. Next meeting After : here! Products identification after the secondary target and beam tracking (D.Ackermann, D.Rudolph, I.Mukha, M.Gorska) Tomorrow: 9-12:30 theory seminar room DESPEC Ge meeting (A.Jungclaus) HISPEC/DESPEC simulation group (A.Algora)

Contract(s) Development Contract(s) Negotiations Closing PAC's PAC CORE STI Signing of MoU Phase I – Governed by MoU Phase II Governed by Contracts The ISC-FAIR International Working Groups MoU Technical Proposals / TR's LoI's (2100 authors) TDR's Evaluation by Advisory Committees by Mid March 05 Cost Review by CORE group by summer 05 Project Definition in 2005

By late autumn 2005 an updated Technical Design Report of the FAIR project needs to be prepared within given resource boundaries. To this end, the STI chair together with the FAIR project management have set-up Cost Review ( CORE ) groups, with the intent to help experiment collaborations and the accelerator teams to establish a cost book of components and to scrutinize the layout of each section of the accelerator facility, the detectors and experimental stations to fit into the financial framework of the FAIR Project. Recommendations of the STI Working Group on FAIR

CORE meeting 31June 2005 There are four comments, which apply to almost all the experiments: 1. The cost for fire safety of electronic racks should be included 2. All cost sums should be rounded to full kEuro. 3. Please make a statement, in case you have received offers fully corresponding to your requirements, which contradict our estimates. 4. The discussions on manpower at the CORE meeting were somewhat confusing. A clear statement is needed on: - what is the manpower available now - what is the amount of manpower missing Wulfrin Wartel to spokespersons HISPEC/DESPEC specific comments -The cost for the complete push-pull mechanism has to be included i.e. rails including installation, hydraulic pistons, cable chains The cost for installation, scaffolding, jigs and fixtures for detector assembly and maintenance as well as survey and long cabling (1.5 Euro/m/cable) and cable trays has to be added - The cost for local safety installations has to be added -Cost for a slow control system have to be included -The production cost for the Si(Li) and Ge detectors can only be maintained if the support from Juelich is guaranteed.

Answer to CORE comments

HISPEC/DESPEC Specific comments Part of the basic research program as defined by the CDR Part of the core experimental facility of FAIR yes  A better structure and organisation for the development of the technically challenging instrumentation for slowed down beams must be presented.  The effective manpower situation of HISPEC/DESPEC has to be clarified. STI to HISPEC/DESPEC spokespersons By late autumn 2005 an updated Technical Design Report of the FAIR project needs to be prepared, within given resource boundaries. To this end, the STI chair together with the FAIR project management have set-up Cost Review ( CORE ) groups, with the intent to help experiment collaborations and the accelerator teams to establish a cost book of components and to scrutinize the layout of each section of the accelerator facility, the detectors and experimental stations to fit into the financial framework of the FAIR Project. The experiment is approved, on the basis of the LOI and the TP, to work towards the TDR. The approval of the low energy part depends on the resolution of the open issues.

These estimations will be part of the FAIR COST book

v/c~0.5; multiplicity: 1-5 RISING AGATA demonstrator ( 1π ) + RISING (today) ~2010 Efficiency : 3% 10.5% (~15%) + ~3% FWHM: 20 keV 7.6 keV ~40 keV target-detector distance: 15 cm Much increased sensitivity compared to RISING Possibility of angular distribution and polarisation measurements, Coincidence measurements, g-factors (transient field method) Determination of source position (?) (target vs. degrader) Gamma-ray detection: AGATA

We would like to ask you to send us until December 15, 2005 the electronic file (word or Latex) of your collaborations Technical Report. This gives you about 2 months to re-edit the text, make necessary corrections and -if you see fit- to include the best drawings you have by now. In addition we would like to get from you separately a short executive summary (including key figures and the key science questions you are trying to answer) which we can use/include for forming the executive summary of FAIR, as the first Volume of the FAIR Report. Horst Wenninger Hans H. Gutbrod chair of FAIR STI FAIR coordinator Dear spokesperson, ….

The new technical report includes the reviewed cost, tracking and the possible alternative for the Ge array for DESPEC (Tigris type detectors)