Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.

Slides:



Advertisements
Similar presentations
Today’s report LIU Qian. We made labels for each fiber. The labels show the PMT’s number corresponding to the fiber. This lable means: east side # inside.
Advertisements

SPLICING AND ITS APPLICATIONS -SPLICES JOIN TOGETHER THE ENDS OF TWO OPTICAL FIBERS IN A CONNECTION THAT IS INTENDED TO STAY CONNECTED CONNECTORSSPLICES.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.
Bad Fibers LIU Qian. Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into.
Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.
SIMULINK Dr. Samir Al-Amer. SIMULINK SIMULINK is a power simulation program that comes with MATLAB Used to simulate wide range of dynamical systems To.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Recent results Marc & Qian. Outline 3D uniformity scan End cap TOF counter test result Report of moving laser box.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
TOF Monitor System Status F. Harris U. of Hawaii June 13, 2006.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
1 Direct burial cable, up to 24 individual fibers, reinforced.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
PCAL Strips light transmission properties April 25, 2011April 26, 20111April 27,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Update of Prototype AT-TPC May 6, 2010 Weekly meeting Daisuke Suzuki, NSCL.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Leaning Tower Of Pong.
TOTEM Electronics Status
Service channels between Tracker and PP1
Ultracorr® Installation Process
Service channels between Tracker and PP1
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Integration issues at IHEP
Radiation-safe area for electronics, or laser or
The time-of-flight reconstruction & calibration
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Surface area in lungs.
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Study of Event Reconstruction for Saturated Pulse
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Commissioning of the CMS Hadron Forward Calorimeters Phase 1 Upgrade
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

Integration & Information Marc and Qian

USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter

USTC/UH Connected and running.

IHEP fiber installation tool.

Fiber tool with fiber

Fiber installation practice

Cabling practice: we will first install fiber, then cable, fiber will be glued to PMT tube, and then joined to PMT cables.

Preparation for installing TOF barrel and MDC. (2 or 3 days from today)

Faulty calorimeter cabling, must be redone before end yoke can close.

Barrel fibers will be temporarily taped to this surface during initial testing.

Current position of laser rack.

The final possition for the laser rack, next year.

Spacing between racks = 110 cm, laser box = 92 cm (just fits).

NO Place to stand!!! We will use a table between racks for alligning the laser.

Possible temporary location for testing laser box and fibers (using a clean bench).