Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
Progress on the MICE Cooling Channel Solenoid Magnet System
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.
MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
MICE Collaboration meeting at Columbia University, New York 12 – 14 June 2003 How Liquid Hydrogen behaves thermally in a Convective Absorber by Wing Lau,
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
MICE AFC Work Group meeting February 13, 2004 Introducing the Coat Hanger technique --- the Global reference system Wing Lau.
Μ-beam Absorber 1Absorber 2Absorber 3RF 1RF 2 Vacuum LH2 Warm window Windows in MICE: Option 1 (as currently designed) ISIS Safety officer’s comment: If.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
MICE Collaboration Meeting 17 CERN 21 – 25 Feb 2007 Summary on Magnet & MICE Integration talks By Oxford University.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Mucool Test Area Cryostat & cooling-loop design Christine Darve Fermilab/Beams Division/ Cryogenic Department/ Engineering and Design Group MuCool / MICE.
Liquid-hydrogen absorber: Shigeru Ishimoto KEK Contents (1)Introduction (2)MICE absorber design (3)Prototype absorber test at KEK (4)MICE absorber instrumentation.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
MICE – MUON Interface meeting at Mission Inn, Riverside, California January , 2004 MICE Cooling Channel Integration Issues Wing Lau – Oxford & Steve.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Integration of the Spectrometer Solenoid Magnets
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
MICE Meeting at RAL, Oct-23, 2005
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
MICE Coupling Coil Update
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus Coil Module between Oxford/RAL, KEK and NIU/IIT. AFC Engineering Group meeting on 26 th January 2004 by Wing Lau, Oxford

NIU / IIT will supply the following:- The Absorber windows, the Safety windows; the Large end plates. It should provide the following interface information to:- the Absorber Body supplier:- Absorber Window and flange dimension Others? the Focus Coil Module supplier:- PCD, size and number of the threaded holes for the Safety Window and the Large End Flange Surface finish at the seated area of the mechanical seal Others? Should the Window supplier require any design information from both the Absorber and the Focus Coil Module suppliers, such request should be made before the end of February 2004 to allow the re-baseline drawings to be completed before the MICE Collaboration meeting at CERN at the end of March 2004

KEK will supply the follow:- Absorber Body; Liquid Hydrogen and Gas Helium feed pipes to and out of the Absorber body to the Focus Coil Vacuum Vessel inlet entrance nozzle; Anchoring arrangement for the Absorber body; LH2 Spillage bucket; As a minimum, it should provide the following information to:- The Window supplier:- PCD, size and number of holes for the Absorber Window attachment Surface finish at the seat area of the mechanical seal; Mechanical seal and bolting requirement to guarantee leak-tightness; Window flange geometry required to allow the routing and attachment of the LH2 and GHe feed pipes; Others? The Focus Coil supplier:- Anchoring details for Absorber body and the LH2 spillage bucket; Any fixing arrangement for the LH2 and GHe feed pipes; Sealing arrangement between the feed inlet pipes and the entrance nozzle to the top of the Warm Vessel. Others? Should the Absorber supplier require any design information from both the Window and the Focus Coil Module suppliers, such request should be made before the end of February 2004 to allow the re-baseline drawings to be completed before the MICE Collaboration meeting at CERN at the end of March 2004

Oxford / RAL will supply the follow:- The Focus Coil Modules except those in the KEK and NIU/IIT’s scope of supply; Support structure for the Focus Coil Modules As a minimum, it should provide the following information to:- The Window supplier:- Space envelope and dimension of the Focus Coil Warm bore tube and its Safety Window attachment ring; Space envelop and dimension of the Large End Flange attachment ring; Others? The Absorber supplier:- Space envelope and dimension of the Focus Coil Warm bore tube; Space envelope and dimension of the Large End Flange attachment ring; Space envelop for the LH2 & GHe feed pipes between the Large End Flange and the Cryostat; Size and location of the Warm Vessel top entrance nozzle; Space envelop for the LH2 spillage bucket; Any fixing constraint for the LH2 and GHe feed pipes; Others? The Coupling Coil and Detector Module suppliers Solution on the connection between modules Common agreement on the structural support design for the modules Others Should the Absorber supplier require any design information from the other suppliers, such request should be made before the end of February 2004 to allow the re-baseline drawings to be completed before the MICE Collaboration meeting at CERN at the end of March 2004

Drawing showing the scope of supply on each of the 3 package supplies on the Focus Coil Module is on the next page. As for the Instrumentation and monitor control, this will need to fit into the existing space envelop and any additional space requirement should be negotiated with the package suppliers as and when needed.

Definition of supply scope between Oxford/RAL, NIU/IIT and KEK Colour code:- Oxford / RAL supply is in black; KEK supply is in blue; NIU / IIT supply is in red Pink indicates interface areas

Interface Colour Codes With Focus Coil Module supplier, i.e. Oxford / RAL With Absorber supplier, i.e. KEK With Window supplier, i.e. NIU / IIT With Coupling Coil and / or Detector module suppliers Parts marked in Pink colour are interface parts