Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Slides:



Advertisements
Similar presentations
Presented by Daniel E. DuBois. Lessons Learned Developers – dont fall in love with your projects What do I mean ?
Advertisements

POTOMAC WIND ENERGY Presents: Small Wind Turbines for residential and business use. May 2008.
S T A T E O F C A L I F O R N I A The Department of General Services Grid Neutral Schools Division of the State Architect, Department of General Services,
North Carolina Northeast State of the Region February 25, 2011.
Wind Energy Update October 6, OG&E’s Commitment to Wind Energy (2007) Make Oklahoma a national leader in renewable energy Mission Accomplished!
Rensselaerville Wind Study Committee Public Information & Citizen Feedback Session May 5, 2009 Public Information & Citizen Feedback Session May 5, 2009.
Wind Power. Approximately 2% of the solar power that reaches the earth’s surface is converted into wind. Approximately 2% of the solar power that reaches.
Creating a Renewable Energy Opportunity Plan for Southwest Wisconsin Legal Considerations Michael Allen October 21 st 2011.
Wind Turbine Lease Education Program Ron Haugen Project Director North Dakota State University Extension Service 6/11/2015 Extension Risk Management Education.
Solar Energy Resources Kurt M. Jones Chaffee/Park County Director CESIT-Solar Team Leader.
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
Welcome to the NJ Wind Working Group Kickoff Meeting at Rowan University Friday 6 October 2006.
Energizing Michigan Energizing Michigan WIND ENERGY EDUCATIONAL PROGRAM FOR FARMERS AND LANDOWNERS Professor Stephen B. Harsh Department of Agricultural.
WIND ENERGY CAMI GHANBARABBASI, KRISTEN RUNDSTEIN AND RACHEL STEINER.
© Copyright 2013, First Solar, Inc. Moapa Southern Paiute and Aiya Solar Projects.
North Carolina Report Wind Powering America All States Summit May 22, 2003.
Wind Energy Stakeholder Debate In-Class Activity.
Wind Energy 101 Brian Antonich Windustry Program Analyst Great Lakes Regional Wind Institute Webinar #1 – Windy Landowner Education September 13 th, 2007.
Small Farm Profitability: Is Wind Energy the Answer? 1
Etowah County Alabama. Etowah County has been selected to be the first site in Alabama for a wind energy farm. Pioneer Green Energy is the developer The.
Welcome to the Fall Training Session for St. Lawrence County Municipal Planning Boards and Zoning Boards of Appeal.
1 Virginia’s Building Science Outreach Programs Bobby Grisso, Ph.D., P.E. Biological Systems Engineering Virginia Tech Martha A. Walker, Ph.D. Community.
Lands’ End Wind Project Kristine McCormick Michelle Shively Greg Brown Tim Pierie.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Western NC Wind Capacity ASU Energy Center after all exclusion zones: 3,150 MW in west (8% of NC electricity from 2100 turbines) ASU Energy center identified.
Wind power. Why is installing wind turbines attractive? make a statement that wind energy is an attractive and environmentally sensible option for a town.
Factors Affecting Wind Power Development in North Carolina Dr. Dennis Grady Director, Appalachian State University Energy.
 It is mechanism for producing electric power.  Wind power plants are installed in windy places.
Capacity Factor Summary 1. Note: Figure only includes the 20 countries with the most installed wind capacity at the end of 2007 Wind as a Percentage of.
Wind Power Jon Konen April 7, 2008 CBE 555 Presentation.
Fossil Gulch Wind Park Presented By Jeff Duff Vice President, Airstreams LLC Welcome.
Westray Community Securing sustainability Sam Harcus.
Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel

Provided by: Training Module: Energy Improvement Loans CDFI Deal Examples This training contains general information only and Deloitte is not, by means.
Lands End Sustainability Project: Wind Turbine Michelle Shively Greg Brown Tim Pierie Kristine McCormick.
Transmission interconnect into the existing ‘Durbin-Monterey’ 69kV line 
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
W IND E NERGY C HALLENGES. W IND ENERGY HAS MANY BENEFITS Oil independence Locally produced (jobs) No air pollution (or CO2) Uses no water Renewable Lower.
Harnessing the Wind – we’re #1!
Wind Energy. Why Renewable Energy? o Clean, zero emissions o NOx, SO2, CO, CO2 o Air quality, water quality o Climate Change o Reduce fossil fuel dependence.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
Town of Orleans Wind Energy Project Berkshire Renewable Energy Summit June, 2005 Kevin Galligan
Harnessing the Wind – we’re #1!  Current largest wind farm: Horse Hollow Wind Energy Center Current largest wind farm: Horse Hollow Wind Energy Center.
Article #3 New York Windmills
I NTRODUCTION TO W IND E NERGY. Outline How is wind created? Where is the wind? How do we measure the wind? How does a wind turbine work? What are the.
Colorado Harvesting Energy Network Jonathan Moore Director, Renewable Energy Development
Overview Wind Energy is currently the fastest renewable power source within our reach. Through this form of energy, the wind’s kinetic force is transformed.
WIND ENERGY. Permission Thank you Dr. Cochrane for the Permission to use this topic.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
 Welcome!  Please get your interactive notebook and read the board!
North Carolina Report Wind Powering America All States Summit May 22, 2003.
Power Plant Construction and QA/QC Section 8.3 – Wind Energy Technology Engineering Technology Division.
Every state in the nation benefits from wind energy.
Lands’ End Wind Project Kristine McCormick Michelle Shively Greg Brown Tim Pierie.
Impacts of Wind Development on the Economy of Beaver County Presented By Scott Albrecht. County Administrator.
North Coast Wind Farm Tolano Environmental Consulting.
Big Oil: Exploring the Alternatives By: Teresa Potter, OKAGE Teacher Consultant.
Windpower Washtenaw Testing the Wind Resource in Washtenaw County BOC Working Session ( )
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
Wind Energy in the U.S. and Pennsylvania. 5/13 Questions of the day: 1. Where do we get our Energy in PA? 1. Where do we get our Energy in PA? 2. What.
Wind Energy Basics The Kidwind Project
Evaluation of global wind power Cristina L. Archer Stanford University 5 October 2005 San Jose State University.
Wind Energy in Iowa Lori McDaniel
Four Corners Wind Resource Center Webinar
Ideal Locations for Wind Power Generation in Washington State
2nd Annual Mason Energy Symposium Energy-Water Nexus Land-Based Wind
Woot! Hey! Solar quiz today!
Wind Power.
Presentation transcript:

Wind energy team

Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy network

What is the potential of wind? The U.S. Department of Energy has announced a goal of obtaining 6% of U.S. electricity from wind by 2020 Wind power could provide 20% of U.S. electricity needs by 2030

Colorado is 11 th best state for wind resource

8 th in nation for installed wind projects

Overview of wind

Is my site windy enough? Evaluating resource is first and most important step –Anemometer loan program data – P/ALP_Sites.htmwww.engr.colostate.edu/AL P/ALP_Sites.htm –Wind map

Turbine siting important Tower height Trees/other objects need to be at least 300 feet away

Scale of wind Small wind: for home owners, small businesses to offset electrical usage Big wind – leasing land to a wind developer can provide farmers/ranchers with steady income –95% of land still useable –Need at least 60 acres per megawatt

Emerging – Community wind Municipalities, large organizations own their own turbines –Local jobs, local benefits Only example in CO right now is of Lamar and Springfield “piggybacking” onto large wind farm –Presence of large farm allowed these towns to buy five 1.5 MW turbines NECO wind in Sedgwick, Philips, and Logan Counties will soon construct 400 MW Farm

Potential issues Zoning –Varies by county, municipality Wildlife Noise Viewshed Transmission (big wind only) Difficult to find good information, independent testing

To learn more: –Come to agent training in spring (TBA) February? Eastern Plains? –In-depth resources on website –New fact sheets Small wind - finished Big wind -under review Understanding wind resources -under development

Upcoming from team Working on national wind curriculum with 8 other states –Wind webinars –more fact sheets on eXtension Small wind turbine to be installed outside Gilpin Extension Office