Drift Chambers at DESY and CERN Mike Green, Fabrizio Salvatore, Michele Faucci Giannelli.

Slides:



Advertisements
Similar presentations
Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
Advertisements

1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
TRACK DICTIONARY (UPDATE) RESOLUTION, EFFICIENCY AND L – R AMBIGUITY SOLUTION Claudio Chiri MEG meeting, 21 Jan 2004.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
Anne-Marie Magnan Imperial College London Tuesday, December18th 2007 Calice Software Review -- DESY -- A.-M. Magnan (IC London) 1 Tracking and ECAL reconstruction.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
Status of Tracking at DESY Paul Dauncey, Michele Faucci Giannelli, Mike Green, Hakan Yilmaz, Anne Marie Magnan, George Mavromanolakis, Fabrizio Salvatore.
Drift velocity and tracking Michele Faucci Giannelli, Mike Green, Fabrizio Salvatore.
March 6th, 2006CALICE meeting, UCL1 Position and angular resolution studies with ECAL TB prototype Introduction Linear fit method Results with 1, 2, 3,
Preliminary analysis of ZHH events (2) Michele Faucci Giannelli, Mike Green, Fabrizio Salvatore Royal Holloway, University of London UK CALICE UK-SOFTWARE.
Physics analysis using ZHH channel Imperial CALICE-UK Meeting 23 January 2007 Michele Faucci Giannelli Mike Green Fabrizio Salvatore.
© Imperial College LondonPage 1 Preliminary Studies of the Tracking Resolution at DESY Hakan Yilmaz.
Calculating the Beam Position at the Ecal for DESY Run (Independent of Tracking) Hakan Yilmaz.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
ZHH channel: software and detector performances for ILC Michele Faucci Giannelli Fabrizio Salvatore Mike Green, Tao Wu.
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Inside the new Mokka release Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
MC Study on B°  J/  ° With J/      °     Jianchun Wang Syracuse University BTeV meeting 03/04/01.
Michele Faucci Giannelli, Mike Green, Veronique Boisvert, Fabrizio Salvatore, Tao Wu LCWS 08, Chicago, 18 November 2008 Sensitivity to the Higgs self-coupling.
1 Calice UK s/w meeting RHUL 24/1/06D.R. Ward David Ward Have previously reported on comparison of Feb’05 DESY data with Geant4 Monte Carlos. Issues with.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
MdcPatRec Tracking Status Zhang Yao, Zhang Xueyao Shandong University.
Non-identified Two Particle Correlations from Run I Understanding drift chamber tracking – Tracker and candidatory – Two particle efficiencies/ghosts A.
Edwin Chng. Contents Decay Solenoid Electron Peak Muon Peak Slab Hits Appendix Slide 2.
26 Jan, MEG Software Status Framework for MEG MC, Unification of LargePrototype/beam test, Schedule and DC reconstruction MEG Software Group.
1 Gabriella Cataldi (INFN Lecce) Michela Biglietti (Universita’ di Napoli-Federico II) and the HLT.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Simulation and Analysis of VTX03 and Upgrades to LASS Ryan Page.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
Status and Plans of the Vienna ILD Software Group (a short update) Winfried Mitaroff ILD Software Web Meeting 26 May 2010.
Update on the Hall C Monte Carlo simulation for 12 GeV Mark Jones.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
© Imperial College LondonPage 1 Tracking & Ecal Positional/Angular Resolution Hakan Yilmaz.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
TB model improvements in Mokka and status of MC production Fabrizio Salvatore Royal Holloway University of London.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
1 MDC Track Finding at BESIII Zang Shilei BES Annual Meeting (Jun 1, 2005) ______________________________________ -Outline- 
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
9 Sep 2008Paul Dauncey1 Tracking software status Paul Dauncey.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
11 Sep 2007Tracking - Paul Dauncey1 Tracking Code Paul Dauncey, Imperial College London.
Michele Faucci Giannelli
Tracking System at CERN 06 and 07 test beams
DESY drift chambers efficiency and track reconstruction
longitudinal shower profile
Bi-Weekly Meeting 2004/09/08 Susumu Oda
ZHH: Linear collider Benchmark
LHCb Alignment Strategy
Michele Faucci Giannelli
Calibration of DT-MTCC data
ZHH Analysis preliminary results on different detector models
Missing digits game.
Test Beam models in Mokka
Beam properties for run
Presentation transcript:

Drift Chambers at DESY and CERN Mike Green, Fabrizio Salvatore, Michele Faucci Giannelli

23/01/07Royal Holloway Group2 Work done so far DESY: –Digitization for MC –Efficiency –Drift velocity –Resolution study New: –Update of digitization and track reconstruction –New resolution

23/01/07Royal Holloway Group3 Update in processors Paul and Hakan discovered a bug in the code, the ordering of the chamber was correct but when reconstructing there was a swap between DC1 and DC2. Now is correct.  2 now is well defined as: where x are the measurement and y the fitted points

23/01/07Royal Holloway Group4 New Resolution Now 1.61 mm it was 1.63, previous result confirmed

23/01/07Royal Holloway Group5 Next step of analysis CERN setup: software 90% ready, need a procedure to calculate the “drift velocity”. MC studies: –Single chamber resolution. –Calculate resolution at ECAL CERN. Release of all new processors in CVS repository (anyone know how to do that?). Study of  2 for real data analysis, add a 3 point fit for DESY in case of bad points. Beam spread issue, further study.