Rocky Mountain Power 2011 Clinic Dynamic Line Rating System Zhao Qi University of Utah.

Slides:



Advertisements
Similar presentations
BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment.
Advertisements

Fig. 4-1, p Fig. 4-2, p. 109 Fig. 4-3, p. 110.
Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
A wrench is used to attempt to turn a bolt. The bolt has a radius of 1cm and the wrench is 30cm long. Draw the extended force diagram for the bolt/wrench.
Identifying opportunities to improve the efficiency of power transmission through existing Overhead Power Lines Konstantinos Kopsidas Supergen - AMPerES.
Lecture 3: Take-off Performance
Circular Motion Newton’s Second Law and circular motion
P.464. Table 13-1, p.465 Fig. 13-1, p.466 Fig. 13-2, p.467.
Fig. 11-1, p p. 360 Fig. 11-2, p. 361 Fig. 11-3, p. 361.
Forces in Beams and Cables
THE WASHINGTON MONUMENT (1884) The purpose of this study is to show how this structure supports its own weight and wind load, by calculating its efficiency.
Table 6-1, p Fig. 6-1, p. 162 p. 163 Fig. 6-2, p. 164.
Rocky Mountain Power 2011 Clinic Project Dynamic Line Rating Preliminary Design Review Project Advisor: Dr. Thomas Schmid Clinic Team Members: Skyler Kershner,
1 OVERVIEW Validate the Measurement Measure Conductor Temperature Time Line Budget Conclusion.
ULg : Pr. J.L. Lilien WISMIG meeting, Arlington, USA, May 2008 New trends on real time measurement on power lines : application to ampacity, aeolian vibrations.
Project Advisor: Dr. Thomas Schmid
CHAPTER 6 Statistical Analysis of Experimental Data
Rocky Mountain Power 2011 Clinic Project Dynamic Line Rating Preliminary Design Review Project Advisor: Dr. Thomas Schmid Clinic Team Members: Skyler Kershner,
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Lecture7 Development of Transmission Line Models Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Change of state: Melting & Heating Curves Ice to Steam.
Aspects of Relevance in Offshore Wind Farm Reliability Assessment Nicola Barberis Negra 2 nd PhD Seminar on Wind Energy in Europe Risø.
Oregon Public Utility Commission Safety and Reliability Section Jerry Murray, Manager Bob Sipler, Utility Analyst What is an “Attachment”? … that’s easy!
Oncor Electric Delivery Company LLC Smart Grid Demonstration Project – Dynamic Line Rating (DLR) June 25, 2010 Justin Johnson ERCOT Reliability Operations.
2015 IEEE Rural Electric Power Conference Asheville, North Carolina.
1 Oncor Electric Delivery Proposed Changes To The 2012 National Electrical Safety Code.
All rights reserved Surge Arrester.
WORK AND ENERGY 1. Work Work as you know it means to do something that takes physical or mental effort But in physics is has a very different meaning.
Part 2 Graphs of Motion. Part 2 Graphs of Motion.
EXAMPLE 2 Graph an exponential function Graph the function y = 2 x. Identify its domain and range. SOLUTION STEP 1 Make a table by choosing a few values.
Physics 111 Practice Problem Statements 12 Static Equilibrium SJ 8th Ed.: Chap 12.1 – 12.3 Contents 13-5, 13-7, 13-17*, 13-19*, 13-20, 13-23, 13-25, 13-28*,
2015 IEEE REPC Engineering Analysis of
Mechanics Topic 2.2 Forces and Dynamics. Forces and Free-body Diagrams To a physicist a force is recognised by the effect or effects that it produces.
September 2005 Pr. J.L. Lilien CABLE DYNAMICS 2005 Charleston SC(USA) OVERHEAD POWER LINES REAL TIME MONITORING : A FUTURE TREND ? August 2003: Black-Out.
PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.
Session 15 – 16 SHEET PILE STRUCTURES
1 Chapter 6: Motion in a Plane. 2 Position and Velocity in 2-D Displacement Velocity Average velocity Instantaneous velocity Instantaneous acceleration.
Circular Motion; Gravitation
Torque Rotational Dynamics. There are 3 types of motion Translational Rotational Vibrational.
Notes: Tuesday Oct. 8, 2012 Topic: Dynamic Equilibrium and Vectors EQ: How can we describe the rope example from yesterday using drawings?
EXAMPLE 4 Using a Sine Ratio Ski Jump
CTC 422 Design of Steel Structures Introduction. Steel as a Building Material Advantages High strength / weight ratio Properties are homogeneous and predictable.
Intro. to the Smith Chart Transmission Line Applications.
Lesson Measuring and Calculating Electricity. Interest Approach § Have you or your parents ever been using several appliances in the kitchen and had a.
Newton’s first and second laws Lecture 2 Pre-reading : KJF §4.3 and 4.4.
Section 9.3 Partial Rates of Change – Partial Derivatives.
Electra 2015 Overhead power line design tool Create digital terrain model Design power line layout Draw poles in layout or profile Inspect and label.
Garage Door Design Analysis
ATM OCN 100 Summer ATM OCN Summer 2000 LECTURE 5 AIR TEMPERATURE: A Fundamental Weather Element u A. BACKGROUND u B. THERMOMETRY u C. CLIMATOLOGY.
Chapter # 8 Mechanical Design of Overhead Lines.
Mechanical Design of Transmission Lines PREPARED BY: SHAH RAHIL( ) SONAL SHRIVASTAVA( ) Guided by: DR.NILESH CHOTHANI.
Brain Teaser Nico purchased a camera, a ruler, and an ice cream bar for $53. He paid $52 more for the camera than the ice cream bar, and the ruler cost.
REDA Production Systems
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Preliminary Survey 1. The alignment of the line route is carried out by survey using a theodolite. 2. The following positions are fixed during this survey.
Piston Engine Propulsion Ignition. Ignition in a piston engine requires: Spark plugs Magneto Condensers Distributor Contact breakers electronic systems.
Shaping operations are generally divided into three groups based upon how the parent metal flows or deforms during the shaping process ,namely Bending.
Components Pumps.
Differential Equations
Max Ice™ Overhead Conductors
Structural Analysis 7th Edition in SI Units
The influence of wind load on a suspended fiber optic cable
Vectors and Scalars.
EQ: What effect do transformations have on summary statistics?
Transformer Loading Considerations
A.C. DISTRIBUTOR CALCULATIONS
15 – Transformations of Functions Calculator Required
Dominion Energy South Carolina: Solar Equipment Requirements
Presentation transcript:

Rocky Mountain Power 2011 Clinic Dynamic Line Rating System Zhao Qi University of Utah

2 Outline Background Proposed solution Actual Design Problems Budget Timeline

3 Background All-Inclusive Measurement line temperature, environment temperature, Solar Absorption Accuracy Low-Power Draw

4 D – Vertical sag S – Horizontal length of the span W – Unit weight of the conductor T r – Resultant conductor tension T h – Horizontal component of tension Fig. 1 Parabolic Sag Curve Sag-Tension Calculations Fig. 1

5 Ice and Wind Loading Radial Ice Wind Pressure Wind & Ice Combined

6 Ice and Wind Loading Table. 1 Definitions of Ice and Wind Load for NESC Loading Areas

7 Ice and Wind Loading Fig. 2 Ice and Wind Load Areas of the United States

8 Ice and Wind Loading Ice loading Wind loading For structures below 60 feet: For structures exceed 60 feet: Resultant ice and wind loading

9 Actual Design Conditions The length of conductors DO NOT remain constant a) High temperature b) Stretching because of tension Vibration of conductors due to wind a) Wind speed b) Pole height c) Span length d) Tension

10 Budget QtyDescriptionCostTotal 1Transformer$0 2Cable$0 2Transformer Pad$20$40 4Various lugs, clamps, connectors $20$80 1Circuit breaker$300 3Locking plug$42$126 1Tension meter$1000 Total:$1566

11 Timeline

12 Conclusion Background / proposed solution Actual Design Problems - Ice and wind loading - length of conductor - Aeolian vibration Budget Timeline

13 Questions? Contact information: Zhao Qi ECE department, University of Utah References: [1]- “Overhead Conductor Manual”, 2 nd Edition, Southwire Company, 2007 [2]- IEEE “Guide to the Installation of Overhead Transmission Line Conductor”, 2004 [3]- IEEE “Guide on Conductor Self-Damping Measurements”, 1978 [4]- “Sag and Tension”, Sep. 20, [online]. Available: