Construction Management Training by Building Site Simulation B. de Vries, S. Verhagen, A.J Jessurun
What is the BMSC Training Center Construction Management User Interaction Full Scale Model
BMSC
Construction Management Changes More emphasis on planning instead of controlling More pre-active instead of re- active construction management
Construction Management Training Not adequate for the new type of construction manager On the building site Dependent on the project and on the trainer Difficult to measure acquired knowledge and expertise
BMSC system architecture Course System Building site Simulation
Course System: Project data Project Score Rule Exercises Transition Type Activity
Transitions Transition types (7) : Project independent Activities (100) : Project dependent If All(Activity) = Fulfilled then Transition = OK If Activity(i) = Fulfilled then Activity(j,k,..)=OK Scores : Ranges
Course System: Trainee data Score Rule TraineeSession Log Record
System Requirements Minimal data entry effort Maximal data reliability Maximal data accuracy Minimal trainer’s interference
BMSC course system Building site Site office Control room
BMSC floor plan
User interaction Communication console (PC) VR model on parabolic screen Actors: role play of truck driver, etc.
Student interface
Teacher interface Log record of trainees’ actions Scenario for actors Television monitors
Training evaluation Building as ‘would have been’ Transition types > Activities Evaluation aspects: Time, Cost, Quality, Organization, Information > Scores Construction knowledge > Expert Management knowledge > Expert
First Experiences Pro High level of realism Intense courses Toolkit is very generic Con Communication console in no substitute for phone Unforeseen actions are missing
Pictures & Panorama
To Conclude