Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.

Slides:



Advertisements
Similar presentations
Overview Dependent demand Dependent demand Master production schedule Master production schedule Bill of materials Bill of materials MRP MRP Time-phased.
Advertisements

Operations Management
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
MRP and Dependent Inventory Models. Inventory Process stage Demand Type Number & Value Other Raw Material WIP Finished Goods Independent Dependent A Items.
Principles of Operations Management
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Operations Management
4. Production and Material Planning
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
MRP, MRP II, and ERP.
Material Requirements Planning
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Material Requirements Planning (MRP) and ERP
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Materials Requirements Planning
Operations Management Material Requirements Planning
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 22 1.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Material Requirements Planning
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
1 Operations Management MRP Lecture 22 (Chapter 14)
14 - 1© 2014 Pearson Education Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer and Render Operations Management,
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
Resource Planning Chapter 14. Step Stool Assembly.
Material Requirements Planning (MRP) and ERP
Materials Requirements Planning
Manufacturing Systems Engineering
1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP Chapter 14 – Material Requirements Planning (MRP) and ERP © 2006 Prentice.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
Operations Management
Material Requirements Planning (MRP) and ERP
LSM733-PRODUCTION OPERATIONS MANAGEMENT
Operations Management Aggregate Scheduling Chapter 13
Operations Management
Chapter 16 Materials Requirements Planning
Management Science 2 Material Requirements Planning (MRP)
Material Requirements Planning (MRP) and ERP
Operations Management
Production Management
Operations Management
Operations Management
Operations Management
Operations Management
Presentation transcript:

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Outline  GLOBAL COMPANY PROFILE: COLLINS INDUSTRIES  DEPENDENT INVENTORY MODEL REQUIREMENTS  Master Production Schedule  Bills of Materials  Accurate Inventory records  Purchase Orders Outstanding  Lead Times for Each Component  MRP STRUCTURE

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Outline - Continued  MRP MANAGEMENT  MRP Dynamics  MRP and JIT  LOT-SIZING TECHNIQUES  EXTENSIONS IN MRP  Closed-Loop MRP  Capacity Planning  Material Requirements Planning II (MRP II)  MRP IN SERVICES

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Outline - Continued  DISTRIBUTION RESOURCE PLANNING (DRP)  ENTERPRISE RESOURCE PLANNING (ERP)  Advantages and Disadvantages of ERP System  ERP in the Service Sector

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Learning Objectives When you complete this chapter, you should be able to : Identify or Define :  Planning bills and kits  Phantom bills  Low-level coding  Lot sizing

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Learning Objectives - Continued When you complete this chapter, you should be able to : Describe or Explain:  Material requirements planning  Distribution requirements planning  Enterprise resource planning  How ERP works  Advantages and disadvantages of ERP systems

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance designs  18,000 different inventory items  6,000 manufactured parts  12,000 purchased parts  MRP: IBM’s MAPICS

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Collins Industries  Collins requires:  Material plan must meet both the requirements of the master schedule and the capabilities of the production facility  Plan must be executed as designed  Effective “time-phased” deliveries, consignments, and constant review of purchase methods  Maintenance of record integrity

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Requirements for Effective Use of Dependent Demand Inventory Models Effective use of dependent demand inventory models requires that the operations manager know the:  master production schedule (what is to be made and when)  specifications or bills-of-material (amount of materials and parts required to make the product)  inventory availability  purchase orders outstanding (what is on order)  lead times (time it takes to get various components)

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Inputs to the Aggregate Production Plan Aggregate Production Plan Marketing Customer Demand Engineering Design Completion Management Return on Investment Capital Human Resources Manpower Planning Procurement Supplier Performance Finance Cash Flow Production Capacity Inventory

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J The Planning Process Change master production schedule? Execute material plans Execute capacity plans Detail capacity plan Material requirements plan Master production schedule Aggregate production plan Change requirements? Change capacity? Realistic No Yes Change production plan? Is capacity plan being met? Is execution meeting the plan?

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Aggregate Production Plan 1,2001,500 Aggregate Production Plan (shows the total quantity of amplifiers watt amplifier watt amplifier watt amplifier Master Production Schedule (Shows the specific type and quantity of amplifier to be produced Weeks FebruaryJanuaryMonths

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Typical Focus of the Master Production Schedule Make to Order (Process Focus) Assemble to Order or Forecast (Repetitive) Stock to Forecast (Product Focus) Schedule finished product Steel, Beer, Bread Light bulbs, Paper Print shop Machine shop Fine dining restaurant Examples: Number of end items Number of inputs Typical focus of the master production schedule Schedule orders Schedule modules Motorcycles, autos, TVs, fast-food restaurant

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J  List of components & quantities needed to make product  Provides product structure (tree)  Parents: Items above given level  Children: Items below given level  Shows low-level coding  A part gets the lowest level code in item structure.  Top level is 0; next level is 1 etc. Bill-of-Material

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Product Structure for “Awesome” A

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Ex: Calculate the Part Requirements For an order size of 50 A items:  #Part B=2(#A)=(2)(50)=100  #Part C=3(#A)=(3)(50)=150  #Part E=2(#B)+2(#C)=(2)(100)+2(150)=500  #Part F=2(#C)=(2)(150)=300  #Part D=2(#B)+2(#F)=(2)(100)+2(300)=800  #Part G=1(#F)=300

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Issues in MRP: Accurate Inventory Records  Good inventory management is an absolute necessity for an MRP system to work, i.e., one needs to know what is in stock.  If the firm has not yet received at least 99% record accuracy, then MRP will not work.

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Issues in MRP: Purchase Orders Outstanding  When purchase orders are executed, records of those orders and their scheduled delivery dates must be available to production personnel.

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Issues in MRP: Lead Times  The time required to acquire an item is the lead time  Lead time of a manufactured item consists of move, setup, assembly or run times.  Lead time of a purchased item includes the time between order release and its retreival.

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Time-Phased Product Structure for Awesome Speakers weeks F 2 weeks E A 1 week C G 2 weeks D 1 week E 2 weeks Start production of D D 1 week B 2 weeks to produce Must have D and E completed here so production can begin on B

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J  Manufacturing computer information system  Determines quantity & timing of dependent demand items © 1995 Corel Corp. Material Requirements Planning (MRP)

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J  Computer system  Mainly discrete products  Accurate bill-of-material  Accurate inventory status  99% inventory accuracy  Stable lead times © T/Maker Co. MRP Requirements

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J  Increased customer satisfaction due to meeting delivery schedules  Faster response to market changes  Improved labor & equipment utilization  Better inventory planning & scheduling  Reduced inventory levels without reduced customer service MRP Benefits

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Structure of the MRP System Master Production Schedule BOM Lead Times (Item Master File) Inventory Data Purchasing data MRP planning programs (computer and software) MRP by Period Report MRP by date report Planned order report Purchase advice Exception report

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Time-Phased Product Structure for Awesome Speakers weeks F 2 weeks E A 1 week C G 2 weeks D 1 week E 2 weeks Start production of D D 1 week B 2 weeks to produce Must have D and E completed here so production can begin on B

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Gross Material Requirements Plan for 50 “Awesome A” Speaker Kits

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Net Material Requirements Plan Item Onhand A10 B15 C20 D10 E10 F 5 G 0

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Net Requirements Plan

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Net Requirements Plan

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Derivation of Master Schedule Therefore, these are the gross requirements for B Periods Master schedule for S sold directly A C B Lead time = 4 for A Master schedule for A S B C Lead time = 6 for S Master schedule for S = = Periods Gross requirements: B

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J MRP Dynamics  Supports “replanning”  Problem with system “nervousness”  “Time fence” - allows a segment of the master schedule to be designated as “not to be rescheduled”  “Pegging” - tracing upward in the bill-of-materials from the component to the parent item  That a manager can react to changes, doesn’t mean he/she should

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J MRP and JIT  MRP - a planning technique but not a detailed scheduling technique, so there may be capacity problems!  Does not machine schedule  Plan with fixed lead times  JIT - a way to move material expeditiously  Integrating the two:  Finite capacity scheduling with time buckets (say weekly)  Small bucket approach and back flushing  Balanced flow approach: pulling material in small lot sizes  Supermarket: An inventory area that holds common items replenished by Kanban systems

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Lot-Sizing Techniques  Lot-for-lot  Economic Order Quantity  Part Period Balancing  Wagner-Whitin Algorithm

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J MRP Lot-Sizing Problem: Lot-for-Lot Techniques

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J MRP Lot-Sizing Problem: EOQ Technique

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Extensions of MRP  Closed loop MRP  Capacity planning - load reports  MRP II - Material Resource Planning  Enterprise Resource Planning

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Closed Loop MRP

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Extensions of MRP Capacity Planning  Tactics for smoothing the load and minimizing the impact of changed lead time include:  Overlapping - reduces the lead time, entails sending pieces to the second operation before the entire lot has completed the first operation  Operations splitting - sends the lot to two different machines for the same operation  Lot splitting - breaking up the order and running part of it ahead of the schedule

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Initial Resource Requirements/Smoothed Resource Requirements

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Extensions to MRP Material Requirements Planning II  MRP plan is measured in quantities or units.  MRPII allows the inventory data to be augmented by other resources like labor hours, m/c hours, accounts payable.  MRP II should be integrated to other systems like MRP, purchasing, production scheduling, capacity planning, warehouse management, etc.

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Extensions to MRP Enterprise Resource Planning  MRP II is enhanced by the additional ties to customers and suppliers to achieve ERP systems.  ERP is a software system to  Automate and integrate many of their business processes  Share common data base and business practices  Produce information in real time  Objective is to coordinate a firm’s whole business  Basic modules: MRP, Finance, HR, SCM, CRM

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J MRP and ERP Information Flows, Integrated with Other Systems

Advantages of ERP Systems 1.Provides integration of the supply chain, production, and administration 2.Creates commonality of databases 3.Can incorporate improved best processes 4.Increases communication and collaboration between business units and sites 5.Has an off-the-shelf software database 6.May provide a strategic advantage

Disadvantages of ERP Systems 1.Is very expensive to purchase and even more so to customize 2.Implementation may require major changes in the company and its processes 3.Is so complex that many companies cannot adjust to it 4.Involves an ongoing, possibly never completed, process for implementation 5.Expertise is limited with ongoing staffing problems

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J MRP in Services  Can be used when demand for service or service items is directly related to or derived from demand for other services  restaurant - rolls required for each meal  hospitals - implements for surgery  etc.

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Product Structure, Bill of Materials, Bill of Labor for Veal Picante