Pulsar Teststand Room -- Pulsar was initially designed as a teststand tool In God we trust, everything else we test Ted for the Pulsar Group(s) With Pulsar.

Slides:



Advertisements
Similar presentations
Archer Norris Budget Process. Process? What Process? Generally start formal work late Oct, early Nov. –Planning throughout the year: –Id like to see,
Advertisements

Unit 6 Cities of the World Lesson 21. New words phone call sb.
COMPUTERIZED SUPPLEMENT TO ENTERPISE 3
It is my birthday soon. This year I will hold a party and invite all my friends. I will now go to my friends homes and invite them to my party.
I know that 2013 was a wonderful year to some of you And I know that to some it was a bad year.
 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Procedures There are many procedures that everyone will need to follow in this class. They will help make your life easier and will keep our classroom.
This Is A Test Of Life!!!. God gave us a lifetime to TEST OUR LIMITATIONS and to LIVE HIS DREAM FOR OUR LIFE.
22 settembre 2004A. Annovi1 SVT upgrade status A. Annovi - Assisi, 22 settembre 2004.
Commissione Nazionale 1 Castel Gandolfo 11 Set Piano di Calcolo per CDF Run2a Stefano Belforte - INFN Trieste1 Wedge 10: what I have tested Am_test_vme:
Slink TX Slink merger Teststand setup Slink merger firmware and testing Firmware features - DAQ RAMs for saving out input and output data - Possible to.
The Road Warrior: first use of the Pulsar for SVT Elena Pedreschi, Marco Piendibene, Franco Spinella The problem: 5/5 + XFT To raise efficiency SVT can.
Live For The Possibilities
Why take classes through the Saskatoon Catholic Cyber School?
M N Free Play Music, Solar System, 5/2/11 com.
Track quality - impact on hardware of different strategies Paola FTK meeting Performances on WH and Bs   2.Now we use all the layers.
Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
1 Pulsar firmware status June 11th, 2004 Slink format Transmitter firmware Transmitter firmware status Receiver firmware overview Receiver firmware status.
SVT L.Ristori1 SVT Workshop July 22, 2003 Summary (1) Minimal upgrade for run IIb silicon –Detailed bit level format for hits from HF’s to Mergers needs.
Simulation Tasks  Understanding Tracking  Understanding Hardware 1.Two types of tasks: a.Implementing known functions in ATLAS framework b.Understanding.
A friend of yours is planning to go on holiday soon A friend of yours is planning to go on holiday soon. You ask her about her plans. Use.
The hills across the valley of the Ebro were long and white. On this side there was no shade and no trees and the station was between two lines of rails.
KNOW YOUR STRENGTHS BE ABLE TO IDENTIFY YOUR CHALLENGES UNDERSTAND YOUR ACCOMMODATION NEEDS BEING A SELF ADVOCATE LEARNING HOW TO LEARN.
Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Procedures There are many procedures that everyone will need to follow in this class. They will help make your life easier and will keep our classroom.
Today we began the Collaborative unit first we started of by having a talk with to of the teachers and they were just explaining to us what was going.
Commissioning Experience and Status Burkard Reisert (FNAL) L2 installation readiness review:
Talking About The Past the simple past tense 教师:杜晓青.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
“Little Rabbit’s Tale”. rapidily If you are moving rapidly, you are moving very fast.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
WHEN IT IS UTTERLY IMPORTANT TO APPRECIATE THAT... THE BABY MUST ALWAYS BE NURTURED … PROTECTED AGAINST DIRT … AND GOOD MANNERS SHOULD ALWAYS BE AROUND.
Training Day Your Mission: The principal calls you down to his office…
Project Overview Ted Liu Fermilab Sept. 27 th, 2004 L2 Pulsar upgrade IRR Review
7/20/04Director's Review - SVT Upgrade1 Silicon Vertex Trigger (SVT) Upgrade J. Adelman, I. Furic, Y.K. Kim, M. Shochet, U.K. Yang (Chicago) T. Liu (Fermilab)
Translation Challenge. My name is __________________.
ATLAS Trigger Development
L2CAL Pulsar Upgrade Proposal in 24 minutes An Executive Summary Ted Liu For the L2CAL upgrade team Pisa/Purdue/Rockefeller/UC /Madrid/Padova/Academica.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
SVT Nov 7, 2002Luciano Ristori - Vertex2002_7Nov02.ppt1 SVT The CDF Silicon Vertex Trigger Vertex 2002 Luciano Ristori Istituto Nazionale di Fisica Nucleare.
 Hi my name is Aaron. I was born on November 10,1994 at St.Elizabeth Hospital of Beaumont Tx. To Teneise Everett and Shawn Collins. My father wasn’t.
Friend hunt Karolína Birnerová P You and your best friend have decided, that you want to go and have fun. You are both 18, but whereas your mother.
The SVT Bypass (not for review) 1.Hardware description; 2.Possible applications; 3.Technical feasibility; 4.Hardware requirements/needs; estimate on firmware/software.
L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.
SVT workshop October 27, 1998Stefano Belforte - INFN Pisa1 SVT Vertical Slice Test Goals Schedule Hardware to be tested Software  pre-existing  developed.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
Performances of the upgraded SVT The Silicon Vertex Trigger upgrade at CDF J.Adelman 1, A.Annovi 2, M.Aoki 3, A.Bardi 4, F.Bedeschi 4, S.Belforte 5, J.Bellinger.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
November 15, 2005M Jones1 Track Lists in Level 2 Outputs from SLAM provide lists of tracks faster than the current path to SVT and Level 2 via XTRP Sparsify.
Present Perfect Tense The autumn has already arrived How do you know?
Reduce, Re-use, Recycle, Repair By: Nina Aquino Contents Contents Reduce- electricity Page3 Re-use- yogurt container Page4 Recycle- Paper and glass Page5.
By: Noddy. Conditionals  The conditionals are used to talk about possible or imaginary situations. A "Condition" is a "situation or circumstance". 
Initial check-out of Pulsar prototypes
The lecture has already started. Present Perfect Tense The lecture has already started. How do you know?
Pulsar WG Meeting (C-J Lin)
The spring has already arrived.
Live as Your Whole Person
The lecture has already started. Present Perfect Tense The lecture has already started. How do you know?
The Road Warrior: first use of the Pulsar for SVT
Acts 8: 26 – 35. Acts 8: 26 – 35 Who are the main characters in the story? (hint: there are 4)
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

Pulsar Teststand Room -- Pulsar was initially designed as a teststand tool In God we trust, everything else we test Ted for the Pulsar Group(s) With Pulsar upgrades finishing up, it’s time to take good care of our teststand room… Have you been to the Pulsar Teststand Room lately? Go take a look …

In the past 4 years, Pulsar has been used for many different applications. On CDF, so far, about 24 different types (not including the ones still in proposals). All came out from the Teststand Room… over 4 years, > 24 young people worked in the Pulsar teststand room. Best initial training ground for young people challenge: keeping the room clean and organized BoardtypeDescription/name 081L2 Pulsar Muon/XTRP Rx IIa 083L2 Pulsar SVT Road Warrior 085L2 Pulsar Muon/XTRP/L1 Tx or SVT XTRP-emu 086L2 Pulsar Muon/XTRP/L1 Rx IIb 087L2 Pulsar RECES Tx 088L2 Pulsar RECES Rx 089L2 Pulsar Cluster/PreFred Tx 090L2 Pulsar Cluster/PreFred Rx 091L2 Pulsar SVT Tx 092L2 Pulsar SVT Rx 093L2 Pulsar Merger Tx 094L2 Pulsar Merger Rx 095L2 Pulsar L2TS Tx 096L2 Pulsar L2TS 098SVT Pulsar TF (Track Fitter) 099L2 Pulsar test one 100L2 Pulsar test two 101L2 Pulsar Stereo Tx 102L2 Pulsar Stereo Rx 103 SVT Pulsar Hit Buffer 104 SVT AMSRW (AM Seqencer and Road Warrior) 107 L2 Pulsar TrackList A 108 L2 Pulsar TrackList B 109 L2 Pulsar Cal Cluster Finder Rx

Have you ever seen this teststand room so clean before?

The L2CAL upgrade is done when this bottle is opened… --> so far, the project has been under the beer pressure

And where are the spare parts?

Two young heroes (from Pisa) hiding in the Pulsar Teststand Room --> working with Laura and others, they have been carefully testing ALL the hardware pieces for the L2CAL upgrade in the past > half year. And they have done an excellent job cleaning up the teststand room!

Virginia will move back to Pisa this Sunday… Thank you,Virginia, for your excellent work in the past half year. We will all miss you. Please come back! Lunch party at Go-Rome after this meeting.

Pulsar Lunch Party for Go Rome ~30 KHz CDF Pulsar L2 CPU state-machine is designed to only have 2 states (by Daniel): Thirsty or Drunk Warning: this is a lunch party … Try stay thirsty Will have a big party when the upgrades are done