Georgina Copley Brian Lopez Christy Oommen Pavni Sahni Kohli Holly Knight.

Slides:



Advertisements
Similar presentations
Buildings and Structures 1
Advertisements

East Bridgford Project Existing Projects The Green Box Project Adaptation Techniques used within this project:- Natural ventilation is increased by a passive.
Architectural Practice of the Year Building Awards 2007
The Dalles Middle School
Reading Assignment for next week: HCL Chapter 14 ELECTRIC LIGHTING.
eQuest Quick Energy Simulation Tool
Cliquez pour modifier le style du titre St Mary’s Church Presentation September 2014.
Building Energy Efficiency By Doug Horn. Agenda Introduction Why Focus on Buildings? ecoEnergy Retrofit Homes Program Energy Efficiency Measures Renewable.
Movable Insulation Jennifer Durham.  Usually insulation is used inside walls, ceilings, and floors to trap heat and create a thermal envelope.  Windows.
The Three Tiered Philosophy
1 Andy Sheppard Arup Low Carbon refurbishment of Heritage Buildings.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Johanna Mikitka AE-390 October 13, 2004
Passive solar systems for building renovation
Chapter 5: Designing for Heating and Cooling 5.1 Organizing the problem a) Fenestration How much is optimum for the building? What should the form of the.
Passive House Seminar for Professionals from the Building Sector.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Brad Gaugh November 29,  Building Background  Lighting Spaces ◦ Façade ◦ Lobby ◦ Auxiliary Gymnasium ◦ Weight and Fitness Room 2.
Aperture Placement & Area. Aperture Refers to any daylight source – Windows – Skylights – Openings – Transparent or translucent surfaces Placement and.
1 Hillel House Project Review 4/3/09 Boiler Green Initiative.
Engert, Scheriau, Wimmer SS 2010 Energy and sustainable development, Prof. Schleicher.
SUSTAINABLE RESIDENTIAL DESIGN PROJECT SIKESTON HOUSE Project 12 DS 413 MAY 8 TH, 2012.
PASSIVE HOUSE SANTORSO (VI) ITALY. UNDERFLOOR TANKS In order to have an eco- building there are underfloor tanks to collect rainwater which is filtered.
Post Occupancy Evaluation of Sustainable Development Projects in the Education Sector Leanne McMillan, Senior Consultant, BRE Scotland.
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
Evidence on Tackling Hard to Treat Properties Prof. Sue Roaf, Heriot-Watt University Dr. Keith Baker, SISTech Ltd Andrew Peacock, Heriot-Watt University.
By: Team Supreme Megan, George, Cory and Corey.  Budget of $160,000  Enough room for family of four  No TVs  Net Zero Energy  Aesthetically Pleasing.
Passive Heating. Uses the energy from the sun to keep occupants comfortable without the use of mechanical systems.
Passive Solar House A passive solar house is heated by the sun’s energy.
Passive and Active Solar Models 8 th Grade Enrichment Fall, 2012.
Building Orientation.
PASSIVE SOLAR DESIGN. Design Techniques
A door is a movable structure used to open and close an entrance, typically consisting of a panel that swings on hinges or that slides or spins inside.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
Drill: How many times would an average car’s tires turn during a drive from downtown Baltimore to downtown Washington, DC? [What would you need to know?
HVACR416 - Design Heat Loss / Heat Gain Part 2. External Loads The greatest external load is the sun. The suns heat can get into a building in one of.
Building Plans.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
Chiel Boonstra A Dwelling Project Gallions Ecopark, London Environmental design in practice.
Center for the Arts Towson, Maryland Schematic Lighting Proposal Ben Mitten Architectural Engineering Pennsylvania State University.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
AddressBuilding Orientation Building Materials Colour of External Building Window size, type and placement Window Protection Out door area and land scaping.
13th JRM Recommendations Relating To Civil Works.
The Basler building The Basler building is situated in the city centre of Basel. This 10 storey, naturally- ventilated building, was built in The.
A New Language Shining the Light on Passive Solar Features and Retrofit Possibilities.
Some Pointers for your assignment..  Passive solar heating is defined as using solar energy incident on windows, skylights, greenhouses, clerestories,
Building Envelope. Physical separator between interior and exterior spaces – Walls – Floors – Roofs – Fenestrations (any opening in the structure) – Doors.
Wellspring Medical Center Clark/Kjos Architect, LLC.
Chapter 22 Introduction to Elevations. 2 Links for Chapter 22 Elevation Basics Surface Materials Related Web Sites.
Windows and doors Why do we have windows? – Light – Ventilation – Beauty – Energy (heat and cold, in and out) – View, etc.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
Sustainable Design. Sustainable What does it mean to be sustainable? ◦Of, relating to, or being a method of harvesting or using a resource so that the.
Edexcel BTEC Level 2 Diploma in Construction Influencing Factors Unit 3 Sustainability in the Construction Industry.
INTERIOR DESIGN Ms. Cromartie Spring 2015 Mod
LUKHDHIRJI ENGINEERING
Sigma Institute Of Engineering at Bakrol, Guided by:- Ratan Panchal Vikrant Prajapati Windows and ventilation Submitted By:- Rajput Ashish ( )
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
Architecture Supported by:
Building Environmental Systems
“kicking on to the finish”
L.E.COLLEGE MORBI BUILDING COUNSTRUCTION Prepared by :
Energy Efficiency for Ashton Hayes
Arch205 building construction Windows- glazed curtain wall, skylights
Exploring Greenhouse Structures
Lehigh Valley Heritage Center
Elevations, Layout and Drawing Technique.
Civil engineering materials windows & Doors
Presentation transcript:

Georgina Copley Brian Lopez Christy Oommen Pavni Sahni Kohli Holly Knight

The Top Bay / Destructor Area Built in 1939 Four boilers / destructors The Headly Engine Large collection of treasures Large collection of junk

CONCEPT The Vision  Showcasing the boilers and engines  Treating the space sympathetically  An accessible and inclusive space  Creating flexibility - Education Space - Exhibition Space - Entertainment space

The Story

LAYOUT – Ramps, ramps, ramps…

Entrance and daylighting Desire to open up and bring in light but maintain space ‘in keeping with listing’ Improve daylighting, thermal performance and air tightness Combination of wood and glazing Sliding, roller or folding doors possible

Entrance and daylighting Northlights to improve daylighting Reduces need for artificial light North facing roof least visible South facing rooflights would increase solar gain but may provide beneficial heating during mid-season and winter Closable ventilation shutters North facing rooflight Possible South facing rooflight Entrance doors Ventilation shutters

Entrance and daylighting Add insulation to internal surface of walls, floor, roof, entrance (maintain external appearance) Secondary glazing Underfloor heating to temper internal environment Consultation with Council/English Heritage to address issues with making changes to building New insulation Secondary glazing New entrance doors

Cost and Programme What can we do now? Current available budget - 50k Vs Quick Wins & Opportunities - Busy Bee & Skip – Open day for Volunteers and local community Practical and simple exhibit displays – some already exist under all the furniture?

Display Options

Mobile Display Options Don’t discard the clutter – Stowaway and display by rotation using mobile display cabinets – gives a new look every season

Road map for delivery - Maximize budget utilization through a Phased programme Business model enabling a Revenue Sharing Mechanism between CMOT and corporates/donors Indicative Capital Costs - Top Bay & Destructor Floor – £ 200k Under floor Heating for Top Bay and Destructor Floor – 30k - 40k 6 passenger Hydraulic Lift – 65k Skylights – 5k Wooden and Glass Facade (South Side) - £50k Insulation - £45k Cost and Programme